706Turf Establishment

GA · 2021 Standard Specifications✓ Full text on BuildSpecBook pages 1389–1390 Save this section

Ask about Section 706

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

706.1 General Description

This work includes providing a hardy and permanent ground cover at designated locations. The cover is subject to the Engineer’s approval.

706.1.01 Definitions

General Provisions 101 through 150.

706.1.02 Related References

A. Standard Specifications Section 700—Grassing B. Referenced Documents General Provisions 101 through 150.

706.1.03 Submittals

General Provisions 101 through 150.

706.2 Materials

Select a viable ground cover according to Section 700.

706.2.01 Delivery, Storage, and Handling

General Provisions 101 through 150.

706.3 Construction Requirements

706.3.01 Personnel

General Provisions 101 through 150.

706.3.02 Equipment

General Provisions 101 through 150.

706.3.03 Preparation

General Provisions 101 through 150.

706.3.04 Fabrication

General Provisions 101 through 150.

706.3.05 Construction

General Provisions 101 through 150.

706.3.06 Quality Acceptance

Refer to Subsection 700.3.06 Quality Acceptance and Subsection 700.3.07 Contractor Warranty and Maintenance for acceptance of a viable ground cover.

706.3.07 Contractor Warranty and Maintenance

General Provisions 101 through 150.

706.4 Measurement

No field measurements are required. Measurement is calculated from known dimensions as follows: A. Type A—Grading and Drainage Projects [Project length (PL) minus bridge and exception* length (BL)] times [right-of-way width or Engineer-specified width (RW) minus roadbed width (RBW)] equals _____ square feet divided by 43,560 ft.²/acre equals pay quantity in acres. [Project length (PL) minus bridge and exception* length (BL)] times [right-of-way width or Engineer-specified width (RW) minus roadbed width (RBW)] equals _____ square meters divided by 10,000 m² equals pay quantity in hectares. (PL – BL) x (RW – RBW) = ____ft² ÷ 43,560 ft.²/acre = pay quantity in acres (PL – BL) x (RW – RBW) = ____m² ÷ 10,000 m² = pay quantity in hectares B. Type B: Base and Paving Projects [Project length (PL) minus bridge and exception* length (BL)] times [unpaved shoulder width (SW) plus 6 ft. for each roadway side (RS)] = ___ square feet divided by 43,560 ft.²/acre= pay quantity in acres. [Project length (PL) minus bridge and exception* length (BL)] times [unpaved shoulder width (SW) plus 1.8 m for each roadway side (RS)] = ___ square meters divided by 10,000 m² = pay quantity in hectares. (PL – BL) x (SW + 6RS) = ___ ft.² ÷ 43,560 ft.²/acre = pay quantity in acres (PL – BL) x (SW + 1.8RS) = ___ m² ÷ 10,000 m² = pay quantity in hectares C. Type C: Complete Project [Project length (PL) minus (bridge and exception* length (BL)] times [right-of-way width or Engineer-specified width (RW) minus plan paved surface width (PPW)] equals square feet divided by 43,560 ft.²/acre= pay quantity in acres. [Project length (PL) minus (bridge and exception* length (BL)] times [right-of-way width or Engineer-specified width (RW) minus plan paved surface width (PPW)] equals square meters divided by 43,560 ft.²/acre= pay quantity in hectares. (PL – BL) x (RW – PPW) = ____ft² ÷ 43,560 ft.²/acre = pay quantity in acres (PL – BL) x (RW – PPW) = ____m² ÷ 10,000 m² = pay quantity in hectares *Exception means major road intersections and Plan exceptions, not side roads, drives, etc.

706.4.01 Limits

General Provisions 101 through 150.

706.5 Payment

The turf establishment area will be paid for at the Contract Price per acre (hectare). Payment is full compensation for equipment, labor, seed, fertilizer, and any other materials necessary to complete the Item. Payment will be made under: Item No. 706 Turf establishment, type_____ Per acre (hectare)

706.5.01 Adjustment

General Provisions 101 through 150.

Referenced in this section

Get an email when 706 changes

Georgia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Construction of Transportation Systems, 2021 Edition. Pages 1389–1390 of 2,050. View official source ↗

Ask about this section

Scoped to Georgia 2021 Standard Specifications, Section 706 — Turf Establishment. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.