625Visual Barriers

GA · 2021 Standard Specifications✓ Full text on BuildSpecBook pages 1044–1055 Save this section

Ask about Section 625

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

SECTION 625 — Visual Barriers

625.1General Description

This work includes furnishing and installing a visual barrier according to this specification and conforming to the locations, dimensions, lines, and grades shown on the plans. Unless a specific type is required by the Contract documents, select one of the following barrier types. Type B Interlock steel panels Type C Precast concrete panels Type D Treated timber panels Type F Glass reinforced thermoset composite structural panels Type G Precast autoclaved aerated concrete (PAAC) panels 625.1.1 Definitions General Provisions 101 through 150. 625.1.2 Related References

A.Standard Specifications
SECTION 106 — Control of Materials
SECTION 201 — Clearing and Grubbing Right-of-Way
SECTION 205 — Roadway Excavation
SECTION 206 — Borrow Excavation
SECTION 208 — Embankments
SECTION 210 — Grading Complete
SECTION 500 — Concrete Structures
SECTION 520 — Piling
SECTION 700 — Grassing
SECTION 702 — Vine, Shrub, and Tree Planting
SECTION 865 — Manufacturing of Prestressed Concrete Bridge Members
SECTION 885 — Elastomeric Bearing Pads
B.Referenced Documents

GDT 7 GDT 20 GDT 21 GDT 24a GDT 24b GDT 59 GDT 67 QPL 42 QPL 53 QPL 90 1034 1034 1034 1034 1034

SECTION 625 — Visual Barriers

Federal Specification QQ-S-763-C AASHTO ASTM M 31/M 31M M 32/M 32M M 111/M 111M M 270/M 270M A 153/153M A 366 A 526 A 568 A 569 A 572 A 591 A 653/653M A 792/792M B 695 B 766 C 1693 D 638 D 695 D 790 D 792 D 2092 D 2583 E 90 G 154 625.1.3 Submittals Submit Shop Drawings to the Engineer for review and approval. Prepare Shop Drawings for each Visual Barrier. Show all details necessary for field erection. The minimum requirements are: • Complete elevation view showing the top and bottom elevations, the required wall envelope, the roadway grade and ground line at the barrier. • Diameter and depth of caissons at each post • Post size • Complete plan view with dimensions, stations and offset Have the manufacturer certify to the Department that a specimen of the proposed barrier meets or exceeds a minimum weighted Visual transmission loss of 20 dBA. Furnish test results for barrier material types (except Type C). The transmission or loss results must be based on the generalized truck spectrum when tested according to ASTM E 90.

625.2Materials

Ensure that other materials not listed herein meet the requirements of the appropriate specification to which they pertain.

A.Type A

Concrete-Class A Hollow Load Bearing Concrete Masonry Units (Concrete Block) ASTM C 90, Grade N-I or N-II Mortar Section 834

B.Type B
1.Interlocking Steel Panels

Use cold formed configured steel panels that meet these requirements:

a.Use steel sheet conforming to ASTM A 653/653M or ASTM A 792/792M Structural Steel (SS) Grade 50

Class 2 with a minimum thickness of 0.029 in. (0.74 mm)

b.Has a male-female rib that provides a friction interlock connection with adjacent panels or is joined

adequately according to the manufacturer’s specifications

c.Provides sufficient friction interlock connection strength to support its own weight without using fasteners

when connected to another panel and held in a vertical or horizontal position

d.Use a panel size and shape shown on the Plans or an alternate approved by the Engineer.

1035 1035 1035 1035 1035

SECTION 625 — Visual Barriers
e.Coat (galvanize) the panels with either a G90 (Z275) weight of zinc according to ASTM A 653/653M or an

AZ50 (AZM150) weight of 55% aluminum-zinc alloy according to ASTM A 792/792M.

2.Protective Color Coating

Use one of the following coatings:

a.System A—The coating is polyvinylidene fluoride (70 percent resin, minimum enamel, PVF2).

1) Apply the coating system (including primer) at a total minimum film thickness of 1 mil (0.03 mm) per coated side. 2) Cure the polyvinylidene fluoride film to at least 0.8 mil (0.02 mm) film thickness.

b.System B—The coating is polyvinyl fluoride plastic film (PVF1) and has a thickness of at least 1.5 mils

(0.04 mm) coated on both sides. 1) Have the coating applied at the factory to thoroughly cleaned and pretreated galvanized steel according to ASTM D 2092, Method F. 2) Laminate the coating to the galvanized steel using heat and adhesive to form a uniform and durable coating pigmented to obtain optimum color performance. 3) Use a color from the Federal Standard Color Number indicated on the plans. Ensure that caulking is color pigmented to match the barrier color specified.

3.Post

Use post for steel barriers with these features:

a.Hot rolled shape conforming to AASHTO M 270/M 270M GR 36/GR 250.
b.Hot-dip galvanized by an approved galvanizer as listed on QPL-53 and in accordance with AASHTO M

111/M 111M.

c.Coating that weighs at least 2 oz/ft.2 (610 g/m²) on all sides.
d.Each post requires pre-inspection by the Office of Materials & Testing as evidenced by a GDT stamp

affixed near one end of each post.

4.Steel Flashing and Caps

Use flashing and caps for steel barriers that are the same material and color coating as the panels. Fasten steel flashing and caps with self-tapping screws. Ensure that A-1 screws are Class #410 Stainless Steel and conform to Federal Specification QQ-S-763-C, or are cadmium coated according to ASTM B 766.

5.Fasteners

Attach panels to posts using a powder-actuated fastening system. Fasteners shall be stainless steel or shall be hot-dip galvanized as per ASTM A 153 Class C or shall have a mechanically deposited zinc coating as per ASTM B 695 Class 50.

C.Type C
1.Use precast concrete panels that meet these requirements:

Class AA Concrete or SCC Concrete Section 500 Reinforcing AASHTO M 31/M 31M and M 32/M 32M Piling-Galvanized Steel Section 520 and AASHTO M 111/M 111M Elastomeric Bearing Pads Section 885 If SCC is used the following shall be met: wet/cement ratio 0.40 min 3500 psi Spread Slump 24” ± 2”, Air Entrainment – min 3.5% to max 6.5%

2.Use piling, bolts, and fittings that are hot-dip galvanized when the barrier rests on another concrete structure.

1036 1036 1036 1036 1036

SECTION 625 — Visual Barriers
D.Type D

Use treated timber panels that meet these requirements: Noise Barrier Walls See QPL 90 Class A Concrete Section 500 Lumber and Timber Section 860 Preservative Treatment of Timber Products Section 863

E.Type F
1.Structural Plank: Use continuous glass fiber reinforced structural planks meeting the following requirements:
a.Constructed of a durable, UV resistant, flame retardant, thermosetting composite material
b.Resistant to degradation from ozone, hydrocarbons, and freeze/thaw cycling
c.Matches the Federal Standard Color Number indicated on the plans
d.Meets the following minimum mechanical properties:

PROPERTY MINIMUM VALUE TEST METHOD Flexural Modulus 2,200,000 psi (15200 MPa) ASTM D 790 Flexural Strength 70,000 psi (480 MPa) ASTM D 790 Tensile Strength 65,000 psi (450 MPa) ASTM D 638 Tensile Modulus 4,500,000 psi (31000 MPa) ASTM D 638 Elongation 1.5% ASTM D 638 Compressive Strength 60,000 psi (410 MPa) ASTM D 695 Barcol Hardness 50 ASTM D 2583 Specific Gravity 1.86 ASTM D 792

1.Filler: Use either hollow structural planks or planks filled with a recycled tire rubber compound comprised of

sorted and graded ground tire rubber (0.25 + 0.025 inch (6.4 + 0.6 mm)).

2.Flashing and Caps: Use flashing and caps of the same material and color as the panels.
3.Caulking: Use color pigmented caulking matching the barrier color specified.
4.Posts: Use posts fabricated from hot rolled shapes conforming to AASTHO M 270/M 270M, GR 36/ GR 250,

and hot dip galvanized in accordance with AASHTO M 111/M 111M, except coating weight shall be a minimum of 2.0 oz/ft. 2 (600 g/m2) on all sides.

5.Other Materials: Use materials meeting the requirements of the appropriate Section in the specifications to

which they pertain. 1037 1037 1037 1037 1037

SECTION 625 — Visual Barriers
F.Type G
1.Precast Autoclaved Aerated Concrete (PAAC) Panel Units: Use PAAC panel units cast from a mixture of

Portland cement, fine aggregate, water, gypsum, lime, and an expansion agent. After setting, and before hardening, the PAAC is machine cut to the required size, then steam-cured under pressure in an autoclave. Use PAAC that meets the following physical requirements:

a.Has a minimum average compressive strength of 725 psi (5000 kPa) when three specimens are tested

in accordance with ASTM C 1693, with no single specimen having a compressive strength of less than 580 psi (4000 kPa).

b.Has a maximum shrinkage of 0.02% when tested in accordance with ASTM C 1693
c.Has a dry bulk density between 34 lb./ft.3 (544 kg/m3) and 41 lb./ft.3 (656 kg/m3) when tested in

accordance with ASTM C 1693

2.Reinforcing: Use reinforcing conforming to AASHTO M 31/M 31M or M32/M 32M.
3.Galvanized Steel Support: Use supports as shown on the plans.
4.Welds: Use welds as shown on the plans.
5.Coatings: Use only approved coating systems on all exposed surfaces, including steel supports. Use the

same topcoat color on both the PAAC panels and the steel supports. Submit independent laboratory test results for 1500 hours of accelerated weathering in accordance with ASTM G 154. Submit results that show ratings of at least 9 in the following categories: color change, chalking, checking, cracking, blistering, flaking and rusting. Submit a certification stating that the PAAC topcoat is graffiti resistant.

G.Single and Double Steel Doors
1.Ensure materials meet the following:
a.Hot Rolled Steel Sheets and Strip: Commercial quality carbon steel, pickled and oiled, complying with

ASTM A-569 and ASTM A-568.

b.Cold-Rolled Sheets: Commercial quality carbon steel, complying with ATM A-366 and ASTM A-568.
c.Galvanized Steel Sheets: Zinc-coated or Zinc-Iron alloy-coated carbon steel sheets of commercial;

quality, Complying with ASTM A526, with ASTM A653, G-60 zinc coating, mill phosphatized. Use for all exterior units.

d.Supports and Anchors: Fabricate of not less than 18 gauge galvanized sheet steel.
e.Inserts, Bolts and Fasteners: Manufacturer’s custom units, except hot-dip galvanized items to be built

into exterior barriers, complying with ASTM A-153, Class C or D as applicable.

2.Protective Color Coating

Use one of the following coatings:

a.System A—The coating is polyvinylidene fluoride (70 percent resin, minimum enamel, PVF2).

1) Apply the coating system (including primer) at a total minimum film thickness of 1 mil (0.03 mm) per coated side. 2) Cure the polyvinylidene fluoride film to at least 0.8 mil (0.02 mm) film thickness.

b.System B—The coating is polyvinyl fluoride plastic film (PVF1) and has a thickness of at least 1.5 mils

(0.04 mm) coated on both sides. 1) Have the coating applied at the factory to thoroughly cleaned and pretreated galvanized steel according to ASTM D 2092, Method F. 2) Laminate the coating to the galvanized steel using heat and adhesive to form a uniform and durable coating pigmented to obtain optimum color performance. 3) Use a color from the Federal Standard Color Number indicated on the plans. 1038 1038 1038 1038 1038

SECTION 625 — Visual Barriers

625.2.01 Delivery, Storage, and Handling General Provisions 101 through 150.

625.3Construction Requirements

625.3.1 Personnel General Provisions 101 through 150. 625.3.2 Equipment General Provisions 101 through 150. 625.3.3 Preparation General Provisions 101 through 150. 625.3.4 Fabrication General Provisions 101 through 150. 625.3.5 Construction Perform the following work according to the specifications:

A.Clearing and Grubbing

When necessary, clear and grub according to Section 201 as applicable.

B.Excavation, Borrow, Embankment

Perform excavation, borrow, and embankment according to Section 205,

Section 206, Section 208, or Section 210. The scope and dimensions of the work are shown on the plans.

C.Grassing

Perform grassing according to Section 700, as specified on the plans.

D.Vine, Shrub, and Tree Planting

Plant vine, shrub, and trees according to Section 702 as specified on the plans.

E.Miscellaneous Construction Items

When items are shown on the plans but are not covered in this specification, the plans and Standard

specifications govern the work.

F.Barrier

Follow these requirements to construct each type of barrier:

1.Type B Barrier

Install steel visual barrier according to the manufacturer’s recommendations and plan details. Repair cut,

scratched, or marred surfaces according to the manufacturer’s recommendations.

2.Type C Barrier

When using precast concrete panels:

a.Cast them in a precasting facility approved by the Engineer.
b.Have the Engineer determine panel acceptability from the compressive strength of cylinders made and

cured the same as the panels, and from inspection during manufacture.

c.Have the panel manufacturer furnish facilities and assistance to sample and test quickly and satisfactorily.
d.Cast the panels on a steel surface with steel side forms.

10391039103910391039

SECTION 625 — Visual Barriers
e.Place concrete in each panel without interruption. Consolidate the concrete using vibrators supplemented

by hand tamping and rodding to force the concrete into the corners of the forms to eliminate stone

pockets, cleavage planes, and air bubbles.

f.Give the panels a Type III—Rubbed Finish on the upper surface (as cast) according to
g.Subsection 500.3.05.AB, “Finish Concrete.” When an architectural finish is specified for one side of the

barrier, provide a similar finish to the opposite side unless noted otherwise in the plans.

h.Cure the panels as specified in Subsection 500.3.05.Z.1, General Curing—Supplying Additional Moisture,

(wet cure) long enough for the concrete to develop the specified compressive strength.

1) Ensure that the curing period is at least 72 hours under normal summer temperature conditions. In

colder weather extend the curing period, as directed by the Engineer

2) Protect the panels from freezing from the time the concrete is placed until curing is complete.

3) Instead of the wet cure method, steam cure the panels as specified in Subsection 865.2.01.B.2.g.(2) if

desired.

i.Mark each panel with the date cast and the Inspector’s approval stamp.

NOTE: Even with the Inspector’s acceptance at the precast yard, panels can still be rejected at the

erection point if they are damaged.

j.Erect the panels according to Plan details and dimensions.

Place bearing pads as shown in the plans and tighten the restraining bolts.

k.After erection is complete and before Final Acceptance of the project, clean the Visual barrier to remove

dirt or stains.

l.The contractor shall construct the Visual barriers with an ashlar stone finish except in specific locations

identified in the plans. In these areas, the concrete panels will be constructed with special form liners

based on the attached renderings.

3.Type D Barrier

The Plans shall designate the correct type of D barrier (Type D.1 or Type D.2.).

a.Type D.1 Barrier

Construct this barrier of tongue and groove panels placed in a horizontal configuration supported by

vertical posts set on concrete piers. Follow the plan details for information on sizes, timber treatment, and

erection.

b.Type D.2 Barrier

Construct this barrier of double wood panels staggered to provide a 1/2-width overlap. The supports are

posts set in a concrete footing. Follow the plans for full details of materials and erection, sizes, and

timber treatment.

4.Type F Barrier

Install in accordance with manufacturer’s recommendations and plan details. Do not install barriers with

burns, discolorations, cracks, or other objectionable marks that would adversely affect the performance of

the system.

5.Type G Barrier
a.Cast the PAAC panels in a pre-casting facility approved by the Engineer.
b.Have the Engineer determine panel acceptability from the compressive strength of cylinders made and

cured the same as the panels, and from inspection during manufacture.

c.Have the panel manufacturer furnish facilities and assistance to sample and test quickly and satisfactorily.

10401040104010401040

SECTION 625 — Visual Barriers
d.Cast the panels on a steel surface with steel side forms. When an architectural finish is specified for one

side of the barrier, provide a similar finish to the opposite side unless noted otherwise in the plans.

e.Place concrete in each panel without interruption. Consolidate the concrete using vibrators supplemented

by hand tamping and rodding to force the concrete into the corners of the forms to eliminate stone

pockets, cleavage planes, and air bubbles.

f.After machine cutting to the required size, cure the PAAC units by high-pressure steam autoclaving so

that the units meet the physical requirements of Subsection 625.2.G.1.

g.Mark each panel with the date cast and the Inspector’s approval stamp.

NOTE: Even with the Inspector’s acceptance at the precast yard, panels can still be rejected at the

erection point if they are damaged.

h.Erect the panels according to plan details and dimensions.
i.After erection is complete and before Final Acceptance of the Project, clean the Visual barrier to remove

dirt or stains.

j.Use coatings that are approved by the Laboratory.

1) PAAC panels. Apply the coating with a sponge-textured roller in accordance with the manufacturer’s

recommendations. Cover all exposed galvanized steel surfaces for protection from splattering. Apply

the coating at a minimum thickness of 60 dry mils (1.5 mm). Apply the coating only when the ambient

temperature is greater than 40 o F (4 o C) and rising. Do not apply any coating during rainfall or when

rainfall is forecast overnight.

2) Galvanized Steel Supports. Apply a corrosion resistant coating by brush, roller, or airless spray in

accordance with the manufacturer’s recommendations. Protect the adjacent PAAC surfaces from

overspray. Apply the coating at a minimum thickness of 2 dry mils (0.5 mm). Use a color that matches

the PAAC final topcoat color. Apply the coating only when the ambient temperature and relative

humidity fall within the limits stated by the manufacturer.

6.All Barrier

Before beginning earthwork on the Project, stake the visual barriers in the field and establish the final ground

line elevations at the barrier.

Furnish these elevations to the supplier who will develop the shop plans, including a complete elevation view

of each barrier indicating top and bottom elevations and the roadway grade.

a.Protect the final ground elevations established in the field for the duration of the project. Do not adjust

them without the Engineer’s approval.

b.Install Visual barriers according to the plans and Shop Drawings approved by the Engineer.
c.Secure joints and connections to be structurally sound with no visible openings. Ensure that vibration from

metal barriers is not a secondary source of noise transmission.

d.Repair marred, chipped, scratched, or spalled barrier areas according to the manufacturer’s

recommendations and as directed by the Engineer at the Contractor’s expense.

e.To substitute welded for fixed-bolt connections or vice versa on metal barriers, meet these conditions:

• Submit load calculations for the specific connection to be modified.

• Use a safety factor of at least 3.0.

f.Place trench backfill for Visual barrier construction according to Section 207. Use select material to backfill.

If the Engineer believes the trench is too narrow for compaction, backfill the trench excavation

with concrete grout to the Engineer’s satisfaction. No additional compensation will be made for the

concrete grout.

g.Dispose of excess excavation to the Engineer’s satisfaction.

10411041104110411041

SECTION 625 — Visual Barriers
h.Keep right-of-way fence in place that is scheduled to be salvaged until the barrier is constructed, or as long

as the Engineer deems practical.

i.After erecting the barrier, leave the disturbed area in a finished condition at the Engineer’s direction and

plant grass or sod.

j.Ensure that the barrier meets these tolerances:

1) Vertical alignment for barriers and posts is:

a.0.5 in. (15 mm) for barrier heights to 10 ft. (3 m)
b.1.0 in. (25 mm) for barrier heights to 20 ft. (6 m)
c.1.5 in. (40 mm) for barrier heights to 30 ft. (9 m)

2) Horizontal alignment for barriers is close to that shown on roadway plans.

3) Post spacings are within 0.5 in. (15 mm) of their intended location.

k.For Visual barriers built on top of earth berms, construct the berms of earthwork fill material and compact

to 95% of the maximum density as determined by GDT 7, GDT 24a, GDT 24b or GDT 67, as applicable.

Determine in-place density according to GDT 20, GDT 21, or GDT 59, as applicable.

G.Graffiti-Proof Coating

This work includes providing graffiti-proof coating on both faces of concrete and masonry barriers from the

ground line to the top of the barrier.

1.Materials. Use materials as noted on QPL 42.
2.Delivery and Storage. Ensure that the materials are delivered in manufacturer’s original containers with labels

intact. Store the materials out of the weather, in a single location, and as specified by the manufacturer.

3.Job Conditions. Protect the coating from the weather and work conditions as follows:
a.Apply the graffiti-proof coating in weather recommended by the manufacturer.
b.Mask, cover, or otherwise protect finished adjacent surfaces from damage that work in this section

could cause.

c.Protect finished coatings from staining, marring, and damages from other trades.
4.Quality Criteria. Use materials that are products of one manufacturer.

Use application equipment recommended or approved by the coating manufacturer for use on this

project. Use equipment in good operating condition.

5.Application. Ensure that the moisture content of surfaces to receive coating are within the limits recommended

by the coating manufacturer.

a.Apply coating after applying a Type III finish of concrete, or after thoroughly cleaning the concrete block.
b.Apply coating at rate of 1 gal per 250 to 300 ft² (1 L per 6 to 7 m²). Apply three coats using a

low-pressure spray.

c.Begin the coating application at the uppermost surfaces and work down.
d.Remove loose particles, dirt, grease, oil, and other foreign materials following application.

625.3.6 Quality Acceptance

The panels are subject to rejection if they fail to meet the requirements specified above. The following defects are also

cause for rejection for Barrier Type C and G:

1.Defects from imperfect mixing and casting Honeycombed or open texture
2.Exposed reinforcement
3.Failure to meet the required 3,500 psi (25 MPa) compressive strength at 28 days

10421042104210421042

SECTION 625 — Visual Barriers

625.3.7 Contractor Warranty and Maintenance

General Provisions 101 through 150.

625.4Measurement

A.Clearing and Grubbing

Clearing and grubbing will not be measured separately for payment.

B.Excavation, Borrow, and Embankment

Excavation, borrow, and embankment are measured according to Section 205, Section 206, Section 208, or

Section 210, as applicable.

The scope and dimensions of the work are as shown on the plans.

C.Grassing

Grassing is not measured separately for payment unless shown on the Plans as a payment item. In this case, the

work is measured according to the requirements of Section 700 for the type of grassing required.

D.Vine, Shrub, and Tree Planting

Vine, shrub, and tree planting shown on the Plans is measured according to Section 702.

E.Items Not Covered in this Specification

Items shown on the plans but not covered in this Specification are measured for payment according to the

applicable portions of the specifications.

F.Barriers
1.Type B Barrier

Steel barrier is measured in square feet (meters) of barrier surface installed before backfilling complete in

place according to Subsection 109.01, Measurement and Quantities. Posts, flashing, caps, concrete post

embedment, or other incidental items required for construction are not measured separately.

2.Type C Barrier

Precast concrete Visual barriers are measured in square feet (meters) of barrier surface before backfilling,

including pile flanges, complete in place and accepted.

No separate measurement is made for pile, anchor bolts, plates, connections, neoprene bearing pads,

connecting bolts, or other Visual barrier components.

3.Type D Barrier

Treated timber barriers are measured in square feet (meters) of barrier surface installed before backfilling.

No separate measurement is made for posts, caps, foundations, footings, hardware, timber treatment, pile, or

cover boards.

4.Type F Barrier

Glass reinforced thermoset composite structural panel barriers are measured in square feet (meters) of barrier

surface installed before backfilling.

No separate measurement is made for posts, top caps, bottom caps, side caps, flashing, strip seals,

mounting brackets and hardware, concrete post embedment, or other incidental items required for

construction.

5.Type G Barrier

Precast autoclaved aerated concrete barriers are measured in square feet (meters) of barrier surface installed

before backfilling.

No separate measurement is made for steel supports or other incidental items required for construction. 10431043104310431043

SECTION 625 — Visual Barriers
6.All Barrier

Only authorized changes required to adjust plan ground elevations and other authorized changes will be

measured. Payment will be made based on plan quantity unless changes are authorized.

625.4.01 Limits

General Provisions 101 through 150.

625.5Payment

A.Clearing and Grubbing

The cost of clearing and grubbing is included in the Lump Sum Item for the project. When clearing and grubbing is not

shown as a payment Item, the cost is included in the overall Contract Price for the work covered in this specification.

B.Unclassified Excavation and Borrow

Unclassified excavation and borrow will be paid for and included in the normal excavation and borrow for the

Project unless shown on the plans as a separate payment Item for Visual barriers. In that case, payment will be

made under Section 205, Section 206, Section 208, or Section 210, as applicable.

C.Grassing

Grassing will be paid for and is included in the normal grassing for the project according to Section 700 unless

shown on the plans to be included in the price bid for Visual barriers.

D.Items Not Covered by This Specification

Items shown on the Plans to be paid for but are not covered by this specification will be paid for according to the

applicable portions of the specifications.

E.Barriers

Unless a specific barrier type is specified in the Contract, identify in the proposal which barrier type will be used.

1.Type B Barrier

Steel barrier will be paid for at the Contract Unit Price bid per square foot (meter). Payment is full

compensation for furnishing and installing materials, providing post and post embedment, and providing

labor, equipment, and incidentals to complete the Work.

2.Type C Barrier

Precast concrete Visual barrier will be paid for at the Contract Unit Price bid per square foot (meter). Payment

is full compensation for furnishing materials, including piling and attachments and for erecting the Visual

barrier, including graffiti-proof coating.

No separate measurement is made for special barrier construction. Contract price shall include construction

of the special barrier in the pay item below.

3.Type D Barrier

Treated timber barrier will be paid for at the Contract Unit Price bid per square foot (meter). Payment is full

compensation for furnishing materials including concrete and steel and for erecting the Visual barrier.

4.Type F Barrier

Glass reinforced thermoset panel barriers will be paid for at the Contract Unit Price bid per square foot

(meter). Payment is full compensation for furnishing and installing materials, including post and post

embedment, and for erecting the Visual barrier.

5.Type G Barrier

Precast autoclaved aerated concrete Visual barrier will be paid for at the Contract Unit Price bid per square

foot (meter). Payment is full compensation for furnishing materials, including steel supports, and for erecting

the Visual barrier, including graffiti-proof coating

Additional barrier payment criteria: 10441044104410441044

SECTION 625 — Visual Barriers

Barriers will be paid at the plan quantity plus or minus any authorized changes, or adjustments due to ground

line elevation varying from plan.

Payment will be made under:

Item No. 625 Visual Barrier Per square foot (meter).

625.5.01 Adjustments

General Provisions 101 through 150.. 1045 1045 1045 1045 1045

Get an email when 625 changes

Georgia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Construction of Transportation Systems, 2021 Edition. Pages 1044–1055 of 2,050. View official source ↗

Ask about this section

Scoped to Georgia 2021 Standard Specifications, Section 625 — Visual Barriers. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.