for Highway Construction Page 438 of 71 5 SECTION 575 – TEXTURED CONCRETE SURFACE
575.01 Description.
Texture exposed concrete surfac es with plastic form liner patterns specified or other Engineer -approved methods.
575.02 Materials.
Not specified.
575.03 Construction Requirements.
Provide plastic form liner patterns bonded to the forms or alternate texturing methods for Engineer approval at least 2 weeks before concrete placement . Alternate texturing methods will require a field mock -up panel to ensure uniformity. Ensure inside form dimensions provide for full plan dimensions plus the t exturing thickness. Attach and treat plastic form liners with a release agent and then remove in accordance with the manufacturer's written instructions. Align the grooves in the form liner panels at construction joints. Conceal const ruction joints in the textured concrete surface.
575.04 Method of Measurement.
The Engineer will measure acceptably completed work by the square yard.
575.05 Basis of Payment .
The Department will pay for accepted quantit ies at the contract unit price as follows: Pay Item Pay Unit Textured Concrete Surface ..................................................................... SY The cost for materials , form liner, form placement , removal, and finishing work is incidental . for Highway Construction Page 439 of 71 5 SECTION 576 – GLASS FIBER REINFORCED POLYMER (GFRP) REINFORCEMENT
576.01 Description.
Provide and place glass fiber reinforced polymer (GFRP) as specified.
576.02 Materials.
Provide GFRP reinforcement meeting ASTM D79 57/D7957M.
576.03 Construction Requirements.