for Highway Construction Page 450 of 71 5 SECTION 581 – CONCRETE CRACK REPAIR
581.01 Description.
581.02 Materials.
581.03 Construction Requirements.
581.04 Method of Measurement.
The Engineer will measure acceptably completed work for crack repair preparation by the foot along the exposed surface of cracks. The Engineer will measure acceptably completed work for crack repair inj ection by the gallons of epoxy used. Cracks that penetrate a concrete member at full depth, sealed on both sides of the member with injection/ inspection ports installed on both sides of the member verifying full penetration of epoxy adhesive, will be measured and paid for on both sides of the member. for Highway Construction Page 453 of 71 5 581.05 Basis of Payment . The Department will pay for accepted quantities at the contract unit price as follows: Pay Item Pay Unit Concrete Crack Repair Preparation ........................................................ FT Concrete Crack Epoxy Injection ............................................................. gal Coring injected areas to confirm full crack penetration and repairing the core locations is incidental . for Highway Construction Page 454 of 71 5 SECTION 582 – PATCH AND REPAIR OF CONCRETE
582.01 Description.
582.02 Materials.
582.03 Construction Re quirements.
Meet the manufacturer’s written instructions for application of mortars. Removed materials are the Contractor’s property and must be properly disposed of.