for Highway Construction Page 597 of 71 5 SECTION 657 – FLASHING BEACONS
657.01 Description.
Provide and install beacons and Rectangular Rapid Flashing Beacons (RRFB).
657.02 Materials.
Provid e materials as specified in: Concrete ...................................................................................................................................... 502 Signs and Sign Supports .............................................................................................................. 616 Traffic Signal Installation ............................................................................................................... 656 Traffic Signal Materials ................................................................................................................ 713 Use Class 40 A concrete for pole foundations.
657.03 Construction Requirements.
657.04 Method of Measurement.
The Engineer will measure acceptably completed work as follows:
657.05 Basis of Payment .
The Department will pay for accepted quantities at the contract unit prices as follows: Pay Item Pay Unit Beacons, AC Powered ............................................................................ Each for Highway Construction Page 599 of 71 5 Beacons, Solar Powered ........................................................................ Each RRFB, AC Powered ................................................................................ Each RRFB, Solar Powered ............................................................................ Each Separate payment will not be made for signs or traffic signal materials. 658-674 for Highway Construction Page 600 of 715 SECTIONS 658 -674 - RESERVED for Highway Construction Page 601 of 71 5 SECTION 675 – SURVEYING
675.01 Description.
Surveying includes scheduling, coordinating, and providing construction surveying, field and pl an measurements, confidence point checks, grade verification point checks, calculations necessary for completing the work and to properly control the work in its entirety, and quantity computations for pay items requiring volume measurements. Measurement of all other pay quantities is excluded from this item of work. Perform work as specified and in accordance with standard engineering and surveying practices under the responsible charge of a professional engineer or an Idaho licensed PLS. Any work that falls under 54 1202(11), Idaho Code (e.g., setting centerline control, resetting land corners, locating property lines , setting right of way monuments, creating authoritative control positions) is required to be completed by an Idaho licensed PLS. Select the PLS for work required under this section from the survey firms currently listed under the Department’s consultant term agreement list (i.e., category C -1a, C -2, or C -3).