Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction

Section 252 — SODDING

Illinois Standard Specifications for Road and Bridge Construction, Section 252. Full text, cross-references and related pay items on BuildSpec.

Sodding Art. 252.03 115 251.06 Method of Measurement. This work will be measured for payment as follows. (a) Contract Quantities. The requirement for use of contract quantities shall be according to Article 202.07(a). (b) Measured Quantities. Mulch Methods 1, 2, 3, 3A, and 4 will be measured for payment in place in acres (hectares) of surface area mulched. Erosion control blanket, heavy duty erosion control blanket, and turf reinforcement mat will be measured for payment in square yards (square meters). 251.07 Basis of Payment. This work will be paid for at the contract unit price per acre…

The rest of Section 252 — SODDING is for members

You're reading the opening of Section 252 — SODDING. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.

  • Complete section text with subsections and tables
  • Search across every state DOT standard specification
  • Prior editions and related products
  • Ask Copilot about this section, with citations
Unlock Section 252 — SODDING — free for 14 daysSign in