Sealing Avandoned Wells Art. 672.03 No extra payment will be made for systems maintenance, repairs or replacement, or for damages incurred as a result of vandalism, theft, or other criminal activities. SECTION 671. MOBILIZATION
671.01 Description. This work shall consist of preparatory work and
operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site for the establishment of offices, buildings, and other facilities necessary for work on the project and for all other work or operations which must be performed or costs incurred when beginning work on the project.
671.02 Basis of Payment. This work will be paid for at the lump sum price for
MOBILIZATION. The amount which a Contractor will receive payment for, according to the following schedule, will be limited to six percent of the original contract amount. Should the bid for mobilization exceed six percent, the amount over six percent will not be paid until 90 percent of the adjusted contract value is earned.
672.01 Description. This work shall consist of sealing abandoned water wells
and monitoring wells. CONSTRUCTION REQUIREMENTS
672.02 General. Work shall be performed according to the “Illinois Water Well
Construction Code” (77 Illinois Administrative Code 920) and shall be performed by a licensed water well driller. A list of licensed water well drillers is available from the Illinois Department of Public Health offices in Springfield. Any available information, such as well type, diameter, depth, and geologic data will be shown on the plans. Unless otherwise noted, monitoring wells are assumed to be 2 in. (50 mm) in diameter and a maximum of 25 ft (7.6 m) deep.
672.03 Basis of Payment. This work will be paid for at the contract unit price
per each for SEALING ABANDONED WATER WELLS or SEALING ABANDONED MONITORING WELLS. Art. 701.01 Work Zone Traffic Control and Protection
Division 700 — Work Zone Traffic Control
AND PROTECTION, SIGNING, AND PAVEMENT MARKING SECTION 701. WORK ZONE TRAFFIC CONTROL AND PROTECTION
701.01 Description. This work shall consist of the furnishing, installation,
maintenance, relocation, and removal of work zone traffic control and protection.
701.02 Materials. Materials shall be according to the following.
Item Article/Section
701.03 Equipment. Equipment shall be according to the following.
Item Article/Section
701.04 General. Work zone traffic control and protection shall be according to
the traffic control plan and the MUTCD. The work zone signs and traffic control devices shall meet the Department’s quality standards as shown in the “Traffic Control Field Manual”. The traffic control shown on the plans represents the minimum required combination of traffic control devices needed for a particular construction operation. Conditions created by the Contractor's operation which are not covered by the plans