671MOBILIZATION

IL · 2022 Standard Specifications✓ Full text on BuildSpecBook pages 616–616 Save this section

Ask about Section 671

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

Sealing Avandoned Wells Art. 672.03 No extra payment will be made for systems maintenance, repairs or replacement, or for damages incurred as a result of vandalism, theft, or other criminal activities. SECTION 671. MOBILIZATION

671.01 Description. This work shall consist of preparatory work and

operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site for the establishment of offices, buildings, and other facilities necessary for work on the project and for all other work or operations which must be performed or costs incurred when beginning work on the project.

671.02 Basis of Payment. This work will be paid for at the lump sum price for

MOBILIZATION. The amount which a Contractor will receive payment for, according to the following schedule, will be limited to six percent of the original contract amount. Should the bid for mobilization exceed six percent, the amount over six percent will not be paid until 90 percent of the adjusted contract value is earned.

a.Upon execution of the contract, 90 percent of the pay item will be paid.
b.When 90 percent of the adjusted contract value is earned, the remaining ten percent of the pay item will be paid along with any amount bid in excess of six percent of the original contract amount. Nothing herein shall be construed to limit or preclude partial payment for other items as provided for by the contract. SECTION 672. SEALING AVANDONED WELLS

672.01 Description. This work shall consist of sealing abandoned water wells

and monitoring wells. CONSTRUCTION REQUIREMENTS

672.02 General. Work shall be performed according to the “Illinois Water Well

Construction Code” (77 Illinois Administrative Code 920) and shall be performed by a licensed water well driller. A list of licensed water well drillers is available from the Illinois Department of Public Health offices in Springfield. Any available information, such as well type, diameter, depth, and geologic data will be shown on the plans. Unless otherwise noted, monitoring wells are assumed to be 2 in. (50 mm) in diameter and a maximum of 25 ft (7.6 m) deep.

672.03 Basis of Payment. This work will be paid for at the contract unit price

per each for SEALING ABANDONED WATER WELLS or SEALING ABANDONED MONITORING WELLS.

Get an email when 671 changes

Illinois revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Illinois Standard Specifications for Road and Bridge Construction, 2022 Edition. Pages 616–616 of 1,217. View official source ↗