General Provisions (00100-00999)

600MOBILIZATION

AL · 2022 Standard Specifications✓ Full text on BuildSpecBook pages 469–0 Save this section

Ask about Section 600

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

466

573.08Basis of Payment

(a)Unit Price Coverage.

The Aggregate Foundations will be paid for at the contract unit price. This payment shall be full compensation for all submittals, labor, equipment, tools, materials, material tests, field tests and incidentals necessary to acceptably construct the foundations.

(b)Payment will be made under Item No.:

573-A Aggregate Foundations – per cubic yard

DIVISION 600 — INCIDENTALS — MOBILIZATION

600.01Description

This Section shall cover the preparatory work and operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for the establishment of all offices, buildings, and other facilities necessary for work on the project; and for all other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. The lump sum bid for mobilization shall be so distributed among the various pay items of the contract that an overrun of a particular pay item will not adversely affect the unit price of that item.

600.02Materials

Not applicable.

600.03Construction Details

Not applicable.

600.04Method of Measurement

(a)Partial Payment.

When more than one project is included in one contract, the amount of payment to be made will be based on the "Percent Complete" as defined in Article 108.04 and amount of the entire contract, not the amount of each individual project. Once the amount of payment is determined, based on the entire contract, this amount will then be prepared for payment on each individual project based on the fraction of the total contract of which the project is a part. Partial Payments for mobilization are based on the Percent Complete and the total adjusted contract amount for all items of work. Payments will be made at the time, and in the amounts shown in the following schedules. MOBILIZATION 467

SCHEDULE OF PARTIAL PAYMENTS FOR MOBILIZATION WHEN THE CONTRACT BID PRICE FOR MOBILIZATION IS LESS THAN, OR EQUAL TO 12 % OF THE ORIGINAL CONTRACT AMOUNT (Partial Payments are a % of the Contract Amount for Mobilization) TIME OF PARTIAL PAYMENT AMOUNT OF PARTIAL PAYMENT ACCUMULATED PAYMENT First Estimate 20% of the Bid Price for Mobilization 20% of the Bid Price for Mobilization After the First Estimate and When the Percent Complete Exceeds 5 % of the Adjusted Contract Amount 50% of the Bid Price for Mobilization 70% of the Bid Price for Mobilization After the First Estimate and When the Percent Complete Exceeds 50 % of the Adjusted Contract Amount 30% of the Bid Price for Mobilization 100% of the Bid Price for Mobilization Note: If 50 % or more of the adjusted contract amount is completed by the first estimate, a payment of 75 % of the Bid Price for Mobilization will be made on the first estimate. The remainder of the Bid Price for Mobilization will be paid on the following estimate.

SCHEDULE OF PARTIAL PAYMENTS FOR MOBILIZATION WHEN THE CONTRACT BID PRICE FOR MOBILIZATION IS GREATER THAN 12 % OF THE ORIGINAL CONTRACT AMOUNT (Partial Payments are a % of the Original Contract Amount, Except the Final Payment) TIME OF PARTIAL PAYMENT AMOUNT OF PARTIAL PAYMENT ACCUMULATED PAYMENT First Estimate 2% of the Original Contract Amount 2% of Total Contract Amount After the First Estimate and When the Percent Complete Exceeds 5 % of the Adjusted Contract Amount 6% of the Original Contract Amount 8% of Total Contract Amount After the First Estimate and When the Percent Complete Exceeds 50 % of the Adjusted Contract Amount 4% of the Original Contract Amount 12% of Total Contract Amount At Acceptance for Maintenance per Item 105.15(c)3. Remainder of Contract Amount for Mobilization 100% of Contract Amount for Mobilization The total sum of all payments shall not exceed the original contract amount bid for the item of Mobilization, regardless of the fact that the Contractor may have, for any reason, shut down his work on the project or moved equipment away from the project and then back again.

(b)When No Separate Payment is shown in the Proposal.

When the proposal does not include a separate item for Mobilization, all work and incidental costs specified as being covered under this Section shall be included for payment under the several scheduled items of the overall contract, and no separate payment will be made therefor.

600.05Basis of Payment

(a)Unit Price Coverage.

The item of Mobilization, measured as noted above, will be paid for at the contract lump sum price bid. Said lump sum price bid shall be full compensation for organizing and moving all labor, tools, equipment, supplies, and incidentals to the project site and for disbanding, disorganizing, and removing all labor, tools, equipment, supplies, and incidentals from the project site, regardless of number of times such moves are made, including all preconstruction costs exclusive of bidding costs.

(b)Partial Payment.

Partial payments may be made in accordance with schedule noted in Article 600.04. The final quantity for this item will be 1.0 unless the project is terminated prior to completing the work in accordance with Article 108.14.

(c)Payment will be made under Item No.:

600-A Mobilization - per lump sum FIELD LABORATORIES 468

FIELD LABORATORIES

601.01Description

This Section shall cover furnishing for the duration of the contract, base, soil, and structure laboratories, and asphalt and concrete plant laboratories as specified on the plans and in these Specifications.

601.02Materials

Laboratories and equipment furnished shall be in satisfactory usable condition and shall be maintained in that condition throughout the contract.

601.03Equipment

(a)Base, Soil, and Structure Laboratories.

Laboratories for testing soil type bases, soils, structures, and similar work shall comply in all details with the requirements of Article 106.03.

(b)Asphalt and Concrete Plant Laboratories.

Asphalt and concrete plant laboratories for testing bituminous plant mixes or portland cement concrete and similar work shall comply in all respects with the requirements of Article 106.03.

601.04Number of Laboratories Required

The number of Base, Soil, and Structure laboratories specified in the contract is approximate only. The number actually required will depend on the scope of the Contractor's operations and may be expected to vary from the specified number. Only the number of Base, Soil, and Structure laboratories actually furnished as directed in writing will be paid for at the contract unit price, and no claim will be allowed for extra compensation on account of overrun or underrun in these items. Each Asphalt and Concrete Plant furnishing materials to the project must have a laboratory meeting the requirements of Article 106.03 for use by the Department; however, no direct compensation will be made for these laboratories.

601.05Method of Measurement

Measurement will be by the unit for each Base, Soil, and Structure laboratory furnished, as directed in writing. No measurement for payment will be made for asphalt and concrete plant laboratories.

601.06Basis of Payment

(a)Unit Price Coverage.
1.Base, Soil, and Structure Laboratories.

The number of laboratories, furnished as specified above, will be paid for at the contract unit price per each, which shall be payment in full for use of the laboratory and equipment; for locating, relocating on the same contract if desired, maintaining, and removing same; for furnishing utilities (water, electricity and heat); and for all equipment, tools, labor, and incidentals necessary to complete the work. The unit price covers the use or rental of the laboratory and equipment for the duration of the contract. Laboratories ordered by the Engineer shall be furnished promptly within the time limit designated by the Engineer; failure to provide the facility when required shall be cause for the Engineer to order the work stopped until such time as the facility is furnished. Should working conditions on the project be such that a previously ordered laboratory is not needed temporarily or permanently in certain cases, the Contractor may be allowed to remove a laboratory from the project with the written permission of the Engineer. However, it shall be expressly understood that temporary removal is for the Contractor's convenience and when work progresses to the stage that the laboratory is needed, the Engineer will give written notice to return or replace the facility. The Contractor will be given 48 hours to comply with this order; failure to comply shall be cause for the Engineer to order the work stopped. In addition, any time a laboratory is away from the job site without authorization shall be deducted from the Contractor's estimate in an amount per day, equal to the unit price bid per unit divided by the number of working days or calendar days provided by the contract. Cost of the removal and return to a facility shall be

Referenced in this section
Sections that cite this one

Get an email when 600 changes

Alabama revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Alabama Standard Specifications for Highway Construction, 2022 Edition. Pages 469–0 of 934. View official source ↗

Ask about this section

Scoped to Alabama 2022 Standard Specifications for Highway Construction, Section 600 — MOBILIZATION. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.