Division 100 — General Provisions

151Mobilization

GA · 2021 Standard Specifications✓ Full text on BuildSpecBook pages 106–107 Save this section

Ask about Section 151

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

151.1 General Description

Mobilization, when listed as a pay item in the proposal, includes preparatory work and operations, including but not limited to, moving personnel, equipment, supplies, and incidentals to the project site. Mobilization also includes all other work and operations that shall be performed, or costs incurred before beginning work on the various Items on the project site.

151.1.01 Definitions

General Provisions 101 through 150.

151.1.02 Related References

A. Standard Specifications General Provisions 101 through 150. B. Referenced Documents General Provisions 101 through 150.

151.1.03 Submittals

General Provisions 101 through 150.

151.2 Materials

General Provisions 101 through 150.

151.2.01 Delivery, Storage, and Handling

General Provisions 101 through 150.

151.3 Construction Requirements

General Provisions 101 through 150.

151.3.01 Personnel

General Provisions 101 through 150.

151.3.02 Equipment

General Provisions 101 through 150.

151.3.03 Preparation

General Provisions 101 through 150.

151.3.04 Fabrication

General Provisions 101 through 150.

151.3.05 Construction

General Provisions 101 through 150.

151.3.06 Quality Acceptance

General Provisions 101 through 150.

151.3.07 Contractor Warranty and Maintenance

General Provisions 101 through 150.

151.4 Measurement

This item of work is not measured separately for payment.

151.4.01 Limits

The total sum of payments shall not exceed the original Contract amount bid for this item.

151.5 Payment

The Department will make partial payments as follows: 1. The first regular payment is 50 percent of the amount bid for mobilization, or 3 percent of the original Contract amo unt, whichever is less. 2. When 5 percent of the original contract amount is earned, the next progress payment is 100 percent of the amo unt bid for mobilization, or 3 percent of the total original contract amount, whichever is less, minus any previous payments. 3. Any amount bid for mobilization in excess of 3 percent of the original Contract amount is paid when work on the Project is complete. 4. The total sum of the payments shall not exceed the original Contract amount bid for this item. Payment includes all costs for mobilization, demobilization, and remobilization as required to complete the work. Payments will be made under: Item No. 151 Mobilization Per lump sum

151.5.01 Adjustments

General Provisions 101 through 150.

Get an email when 151 changes

Georgia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Construction of Transportation Systems, 2021 Edition. Pages 106–107 of 2,050. View official source ↗

Ask about this section

Scoped to Georgia 2021 Standard Specifications, Section 151 — Mobilization. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.