Incidental Construction (600-699)

626Section 626

CO · 2023 Standard SpecificationsBook pages 775776View official source ↗

626.01 626-1 SECTION 626 MOBILIZATION DESCRIPTION

626.01 This work consists of the mobilization of personnel, equipment and supplies at the

project site in preparation for work on the project. This item shall also include the establishment of the Contractor 's offices, buildings and other necessary facilities, and all other costs incurred or labor and operations that must be performed before beginning the other items under the Contract. BASIS OF PAYMENT

626.02 Partial payments for mobilization will be made once each month as the work

progresses. These partial payments will be made as follows:

1.When 5 percent of the original contract amount is earned, 25 percent of the amount bid for mobilization, or 2 1/2 percent of the original contract amount, whichever is less, will be paid.
2.When 10 percent of the original contract amount is earned, 50 percent of the amount bid for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
3.When 25 percent of the original contract amount is earned, 60 percent of the amount bid for mobilization, or 6 percent of the original contract amount, whichever is less, will be paid.
4.When 50 percent of the original contract amount is earned, 100 percent of the amount bid for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.
5.Upon completion of all work on the project, payment on any amount bid for mobilization in excess of 10 percent of the original contract amount will be paid.
6.The total sum of all payments shall not exceed the original contract amount bid for the item, regardless of the fact that the Contractor may have, for any reason, shut down the work on the project or moved equipment away from the project and then back again. For the purpose of this Section the term “original contract amount” as used above shall mean the amount bid for the construction items in the Contract not including the amount bid for mobilization. Payments for materials on hand, as described in subsection 109.07, will not be included as a percent of original contract amount earned until said materials on hand have been incorporated into the work and accepted and paid for as contract items. These payments shall be independent of partial payments as defined in subsection 109.06. Payment will be full compensation for all work necessary to complete the item. Payment will be made under: Pay Item Pay Unit Mobilization Lump Sum Nothing shall be construed to limit or preclude partial payments for other items as provided for by the Contract. 626.02 626-2 THIS PAGE INTENTIONALLY LEFT BLANK 627.01 627-1 SECTION 627 PAVEMENT MARKING DESCRIPTION

627.01 This work consists of furnishing and applying pavement marking, and furnishing,

installing, and removing temporary pavement marking per these specifications, the Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD), the Colorado supplement thereto, and in conformity to the lines, dimensions, patterns, locations and details shown on the plans or established. MATERIALS

627.02 Materials shall conform to the requirements of the following subsections:

Paint 708.05 Glass Beads 713.08 Modified Epoxy Pavement Marking Material 713.17 Thermoplastic Marking Material 713.12 Pavement Primer 708.07 Preformed Plastic Pavement Marking Material 713.13 Pavement Marking Tape 713.15 Pavement Marking Tape (Removable) 713.16 Raised Pavement Marker 713.18 Preformed Thermoplastic Pavement Marking Material 713.14 Methyl Methacrylate Pavement Marking Material 713.19 CONSTRUCTION REQUIREMENTS

627.03 General. All pavement markings shall be placed per the following requirements. When

the term “full compliance” is used, it means the pavement markings shall meet the requirements of Standard Plan S -627-1.

a.Pavement Marking Plan. When pavement -marking location details are not provided in the Contract, the Contractor shall submit a layout of existing conditions to the Engineer for approval or modification. This layout is to be used as the final pavement -marking plan.
b.Roadways Closed to Traffic During Construction . Full- compliance final markings shall be in place before opening the roadway to traffic. Pavement markings on detour routes shall be full- compliance markings.
c.Roadways Constructed Under Traffic. Full compliance final pavement markings shall be placed within two weeks after final surfacing is completed. Full compliance pavement markings shall also be placed on any roadways opened to traffic when the project pavement work is discontinued for more than two weeks.
d.Temporary Pavement Markings. Temporary pavement markings and control points for the installation of those pavement markings for roadways that are being constructed under traffic shall be installed as follows:
Source: Colorado Standard Specifications for Road and Bridge Construction, 2023 Edition. Pages 775776 of 943.