827TRANSFORMER, GENERAL PURPOSE

IL · 2022 Standard Specifications✓ Full text on BuildSpecBook pages 722–723 Save this section

Ask about Section 827

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

Light Poles Art. 830.02 SECTION 827. TRANSFORMER, GENERAL PURPOSE

827.01 Description. This work shall consist of furnishing a dry type

transformer, wiring, conduit and mounting hardware, and installing it at the location shown on the plans or as designated by the Engineer.

827.02 Materials. Materials shall be according to the following.

Item Article/Section

a.Transformer, General Purpose .......................................................... 1068.02
b.Electrical Raceway Materials ............................................................. 1088.01
c.Wire and Cable ....................................................................................... 1066
d.Splicing and Termination of Electric Cable ........................................ 1066.06
e.Fasteners and Hardware ................................................................... 1088.03 CONSTRUCTION REQUIREMENTS

827.03 Installation. General purpose transformers may be mounted inside a

control cabinet, on a sign truss, and on a bridge structure requiring different mounting hardware. All material required to complete the installation shall be included. The transformer enclosure shall be NEMA TYPE 3R or 4X and may be stainless steel as shown on the plans. It shall be solid dielectric, air cooled, and of a type (i.e., buck/boost) as specified. The plans shall identify size in KVA as well as primary and secondary voltages. Air movement must be considered for mounting inside a junction box or other confined space.

827.04 Basis of Payment. This work will be paid for at the contract unit price

per each for TRANSFORMER, GENERAL PURPOSE, of the size and type specified. POLES AND TOWERS SECTION 830. LIGHT POLES

830.01 Description. This work shall consist of furnishing and installing a light

pole complete with an arm(s), when specified, and all hardware and accessories required for the intended temporary or permanent use of the pole.

830.02 Materials. Materials shall be according to the following.

Item Article/Section

a.Light Poles ........................................................................... 1069.01-1069.05
b.Mounting Pad .................................................................................... 1069.07
c.Pole/Unit Identification ....................................................................... 1069.06 CONSTRUCTION REQUIREMENTS Art. 830.03 Light Poles

830.03 Installation. The light pole shall be set plumb on the foundation

without the use of shims, or washers for leveling. On bridge parapet walls, a vibration mounting pad shall be installed between the foundation leveling plate and the light pole. The handhole shall be located such that workers accessing the handhole shall face oncoming traffic directly or located on the back side of the pole facing the roadway. On bridge parapet walls, the access handhole shall be oriented facing the roadway. On center median barrier walls, all access handholes shall be oriented to the one side with the least traffic flow. Arms shall be set at right angles to the centerline of the pavement. Poles shall not be left in place without arm(s) and luminaire(s). The Contractor shall be responsible for furnishing pole mounting equipment that is of adequate strength and compatible for the pole it supports. This shall include, but not be limited to, the foundation, breakaway device (when specified), anchor rods, and hardware. Lighting unit identification numbers shall be installed before the lighting unit is energized.

a.Foundation Mounted Poles. The Contractor shall avoid contact of dissimilar metals in erecting the pole on its foundation and/or breakaway device. Any concern of trapped moisture or potential corrosion cell shall be resolved to the satisfaction of the Engineer.
b.Direct Embed Fiberglass Pole. The depth of a direct embed fiberglass pole in the ground shall not be less than ten percent of the pole length plus 2 ft (600 mm) with a minimum of 6 ft (1.8 m). Direct embed poles shall be raked 1 ft (300 mm). Care shall be taken to get the shear plane of the pole at groundline for breakaway poles. Backfill shall be tamped and compacted around the pole in 6 in. (150 mm) lifts.
c.Wood Pole. Poles shall be stored and handled according to ANSI O5.1. The depth of the pole in the ground shall not be less than ten percent of the pole length plus 2 ft (600 mm) with a minimum of 6 ft (1.8 m). The poles shall be raked 1 ft (300 mm). Backfill shall be tamped and compacted around the pole in 6 in. (150 mm) lifts. Pole guying shall be provided where indicated on the plans, at every dead end pole, and at any pole having non-offsetting cable support stresses.

830.04 Temporary Installation. Wood poles used for a temporary lighting

installation may be previously used poles as approved by the Engineer. The poles shall be in good condition and shall be according to the applicable ANSI requirements for sweep, crook, defects, and mechanical damage. Poles deemed unacceptable by the Engineer shall be removed from the jobsite.

Referenced in this section

Get an email when 827 changes

Illinois revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Illinois Standard Specifications for Road and Bridge Construction, 2022 Edition. Pages 722–723 of 1,217. View official source ↗

Ask about this section

Scoped to Illinois Standard Specifications for Road and Bridge Construction, Section 827 — TRANSFORMER, GENERAL PURPOSE. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.