Art. 870.04 Fiber Optic Cable
870.04 Method of Measurement. Cable will be measured for payment
according to Article 817.04.
870.05 Basis of Payment. This work will be paid for at the contract unit price
per foot (meter) for ELECTRIC CABLE ASSEMBLY IN CONDUIT, or TRENCH, 600V of the type, size, and number of conductors specified. SECTION 871. FIBER OPTIC CABLE
871.01 Description. This work shall consist of furnishing and installing all
accessories required and the fiber optic cable of the type, size, and number of fibers specified.
871.02 Materials. Materials shall be according to the following.
Item Article/Section
871.03 Contractor Qualifications. The fiber optic cable installation shall be
supervised by trained and experienced personnel. The cable terminations and splices shall be made by qualified technicians. Upon request by the Engineer, the Contractor shall provide documentation on qualifications and experience for fiber optic equipment installations. The Engineer will determine if the Contractor is qualified to perform the work. CONSTRUCTION REQUIREMENTS
871.04 Cable Installation. The fiber optic cable shall be installed in
continuous runs between controller cabinets or as marked on the plans. No splices shall be allowed outside the controller cabinet. The cable end shall be secured inside the controller cabinet so no load is applied to the exposed fiber strands. Cable Minimum Bend Radius. For static storage, the cable shall not be bent at any location to less than ten times the diameter of the cable outside diameter or as recommended by the manufacturer. During installation, the cable shall not be bent at Fiber Optic Cable Art. 871.04 any location to less than 15 times the diameter of the cable outside diameter or as recommended by the manufacturer. Extra Cable. Extra cable shall be left in each handhole and double handhole, at the top of each conduit riser, and at each wood support pole according to the following requirements. Storage of additional extra cable in each handhole shall be coiled. These coils shall be bound at a minimum of three points around the coil perimeter and supported in their static storage positions. Storage of additional cable adjacent to conduit risers and support poles shall be as detailed on the plans. The minimum of extra cable amounts shall be as follows. Location Extra Cable Length feet meters Gulfbox 10.0 3.0 Junction Box 10.0 3.0 Handhole 50.0 15.0 Double Handhole 100.0 30.0 Conduit Riser 100.0 30.0 Support Pole 100.0 30.0 Any Splice Location 100.0 30.0 Cable Termination. Field cable shall terminate in the controller cabinet within a wall-mounted distribution enclosure according to Article 864.03.
871.05 Method of Measurement. Cable will be measured for payment in feet
(meters) in place. Cable will be measured horizontally and vertically between the changes in direction, including the cable in the vertical conduit riser and any extra cable as specified in Article 871.04. The cable length in the foundations of a controller cabinet and a vertical pole will be accounted as 3 ft (1 m) each.
871.06 Basis of Payment. This work will be paid for at the contract unit price
per foot (meter) for FIBER OPTIC CABLE of the method of installation (in conduit or on messenger), of the type, size, and number of fibers specified. The cable warning tags will be included in the cost of the fiber optic cable. SECTION 872. SPAN WIRE AND TETHER WIRE
872.01 Description. This work shall consist of furnishing and installing span
wire or tether wire and accessories.
872.02 Materials. Materials shall be according to the following.
Item Article/Section
872.03 Installation. The span wire or tether wire with accessories shall be
installed according to the details shown on the plans.
872.04 Method of Measurement. Span wire and tether wire will be
measured for payment in feet (meters) in place. Measurements will be along the horizontal distances between the supporting poles. Electric Cable Art. 873.03
872.05 Basis of Payment. This work will be paid for at the contract unit price
per foot (meter) for SPAN WIRE or TETHER WIRE. Any additional span wire or tether wire required for sag and wrap around shall be included in the cost of the wire specified. SECTION 873. ELECTRIC CABLE
873.01 Description. This work shall consist of furnishing and installing an
electric cable of the type, size, and number of conductors specified.
873.02 Materials. Materials shall be according to the following.
Item Article/Section
873.03 Installation. The electric cable may be installed in a trench, in a
conduit, or aerially suspended, as indicated on the plans. When installed in a trench, the electric cable shall be installed at a depth of 24 to 30 in. (600 to 750 mm). The color coded conductor shall be connected according to the following schedule.