Illinois Department of Transportation (IDOT) · Standard Specifications for Road and Bridge Construction
Section 877 — MAST ARM ASSEMBLY AND POLE
Illinois Standard Specifications for Road and Bridge Construction, Section 877. Full text, cross-references and related pay items on BuildSpec.
Art. 877.03 Traffic Signal Concrete Foundation 736 877.03 Installation. The components of a mast arm assembly and pole shall be assembled and erected according to the details shown on the plans. The pole shall be erected vertically on a concrete foundation. The Contractor shall furnish and install the required nuts and washers for mounting and plumbing the pole on the anchor rods. After the entire assembly has been aligned and plumbed, a Type 304 stainless steel mesh 1/4 in. (6 mm) maximum opening with a minimum wire diameter AWG No. 16 (1.5 mm) shall be stainless steel banded to the anchor…
The rest of Section 877 — MAST ARM ASSEMBLY AND POLE is for members
You're reading the opening of Section 877 — MAST ARM ASSEMBLY AND POLE. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations