529 The hardwood plugs shall be inspected after any milling operation when a resurface exists on the concrete. Damaged or missing plugs shall be replaced prior to overlaying with a new surface.
612.07 Method of Measurement
Asphalt material will be measured by the ton. Drilled holes for underseal will be measured per each hole drilled. 100
612.08 Basis of Payment
This work will be paid for at the contract unit price per ton for material for underseal. Drilled holes for underseal will be paid for at the contract unit price per each, complete in place. Additional holes and materials required for a second undersealing operation will be paid for at the contract unit prices for the quantities involved. Payment will be made under: 110 Pay Item Pay Unit Symbol Drilled Hole for Underseal ........................................................ EACH Material for Underseal ............................................................... TON The cost of shoulder material, wood and hardwood plugs, and necessary incidentals shall be included in the cost of the pay items.