........................................................ SYS depth Riprap, Precast Concrete ........................................................... SYS Riprap, Revetment ..................................................................... TON S Y S 200 Riprap, Uniform ........................................................................ TON Slopewall ................................................................................... SYS Slopewall, Concrete, _____ in. .................................................. SYS depth If the contract includes a pay item for removing materials from within the project limits which are used as grouted riprap, the cost of such removal shall be included in the cost of the pay item for the removal work . The cost of placing such material shall be included in the cost of the riprap pay item. 210 The cost of placing grout in accordance with 616.04 shall be included in the cost of the grouted riprap item. The cost of paved side ditch required at the top of riprap and along the edge of riprap will be paid for in accordance with 607.06.
The cost of welded steel wire reinforcem ent shall be included in the cost of the slopewall. The cost of excavation below the finished riprap or slopewall shall be included in 220 the cost of the riprap and slopewall pay items. The cost of excavation, grading, sewing, pinning, and necessary incidentals shall be included in the cost of geotextiles.