Structures (500-599)

597DIVISION 700 – STRUCTURES

IN · 2024 Standard SpecificationsBook pages 832View official source ↗

597 DIVISION 700 – STRUCTURES SECTION 701 – DRIVEN PILING

701.01 Description This work shall consist of furnishing and driving foundation piles of the type and dimensions specified including cutting of f or building up foundation piles when

required. This work shall also consist of providing test piles and performing loading tests when required. Piling shall be installed at the location and to the tip elevation, the penetration depth, and nominal driving re sistance shown on the plans in accordance with 105.03. 10 MATERIALS

701.02 Materials Materials shall be in acco rdance with the following:

B Borrow ..................................................................... 904.06* Bentonite Grout ........................................................... 913.06 Concrete Piles .............................................................. 707 Conical Pile Tips ......................................................... 915.01(a)2 End Plates .................................................................... 915.01(a)1 20 Epoxy Coating fo r Piles ............................................... 915.01(d) Pile Sh oes .................................................................... 915.03 Reinforcing Bars .......................................................... 910.01 Steel H Piles ................................................................ 915.02 Steel Pipe Piles ............................................................ 915.01 Structural Concrete ...................................................... 702 Timber Piling, Treated ................................................. 911.02(c) Timber Piling, Untreated ............................................. 911.01(e) * B borrow consisting of ACBF or GBF shall not be used. Unless otherwise specified, reinforcing bars may be either plain or epoxy coated. Steel pipe piles shall consist of a steel pipe which is driven into place and filled with class A concrete. The Contractor may furnish and drive steel pipe piles with thicker walls than specified. Treated and untreated timber piles shall be strapped with at least three straps: one approximately 18 in. from the butt, one approximately 24 in. from the butt, and one 40 approximately 12 in. from the tip. Additiona l straps shall be provided at approximately 15 ft centers between the butt and tip. Strapping shall encircle the pile once and be tensioned as tightly as possible. Straps shall be 1 1/4 in. wide, 0.031 in. thick, cold rolled, fully heat treated, high tensile strapping, painted and waxed, with breaking 701.02 598 strength of 5,500 lb. The strap shall be crimped with a notch type sealer to furnish a joint yielding 80% of the strap tensile stre ngth. Treated timber piles shall be strapped after treatment.

701.03 Handling of Epoxy Coated Piles Epoxy coated piles shall be protected at all times from damage to the epoxy 50

coating. Damage to epoxy coated piles shall be repaired in accordance with 915.01(d). Epoxy coated piles will be rejected if the to tal area of repair to the coating exceeds 2% of the total coated surface area. CONSTRUCTION REQUIREMENTS

701.04 Equipment for Driving Piles

a.Approval of Pile Driving Equipment All pile driving equipment, including the pile driving hammer, hammer cushion, 60 helmet or pile drive head, pile cushion, and other appurtenances furnished by the Contractor shall be in working condition and approved in writing by the Engineer prior to delivery of the pile driving equipment to the job site. All pile driving equipment shall be sized such that the piles can be driven to the length required without damage. Approval of pile driving equipment does not relieve the Contractor of the responsibility to drive piles, free of damage, to the required nominal driving resistance and, if specified, the minimum tip elevation shown on the plans. Pile driving equipment will be subject to satisfactory performance during production. The Contractor shall submit a completed pile and driving equipment data form to 70 the Engineer at least 15 calendar days prior to driving piles. The pile and driving equipment data form is available on the Department’s website. The Contractor will be notified of the acceptance of the proposed p ile driving system within 15 calendar days of the receipt of the pile and driving equipment data fo rm. Acceptance of pile and driving equipment does not relieve the Contractor of the responsibility to provide equipment suitable for driving the specified piling to the required bearing without damage. If the method of pile driving approval is in accordance with the dynamic formula shown in 701.05(a) the dynamic formula method will be used to determine if the pile 80 driving equipment is acceptable for use. To be considered for approval, the proposed driving system shall obtain the nominal driving resistance between the specified blow count range of 30 and 120 blows per foot. If the nominal driving resistance is to be determined by dynamic pile load test in accordance with 701.05(b) or static load test in accord ance with 701.05(c), the Engineer will use the wave equation analysis method for driving system approval. To be approved, the proposed driving system shall obtain the nominal driving resistance between the specified blow count range of 30 and 120 blows per foot, and shall maintain driving stresses below the specified driving stress limits for the pile type 90 701.03 599 being driven. If wave equation predicted driv ing stresses are greater than specification limits or the wave equation blow count for the nominal driving resistance is outside the specified blow count range, the Contractor shall modify or replace the proposed equipment until subsequent wave equation analyses indicate the piles can be driven to the nominal driving resistance within the allowable blow count range and within driving stress limits. If the driving system requires revision, the Contractor will be notified of the acceptance of the revised driving system with in seven calendar days of receipt of a revised pile and driving equipment data form. 100 The Contractor shall use the approved pile driving system. No changes shall be made without prior written approval from th e Engineer, with the exception that the concrete pile cushion thickness may be increased to control driving stresses. A change in the pile driving system will only be considered after the Contractor has submitted a new pile and driving equipment data form. The Contractor will be notified of the acceptance of a proposed change in drivi ng equipment within three work days of receipt of the pile and driving equipment data form. If the Engineer determines the Contractor’s hammer is not functioning properly and is unable to drive the piles to the required penetration depth or nominal drivin g resistance, the hammer shall be removed 110 from service.
1.Dynamic Formula Method If the dynamic formula method is used, the energy of the pile driving equipment shall be rated by the manufacturer at or above the appropriate minimum manufacturer’s rated hammer energy for the corresponding nominal driving resistance as shown in the table below. The table below will be used as the basis of approval of pile driving equipment for the dynamic formula method. DYNAMIC FORMULA METHOD Minimum Pile Hammer Requirements Nominal Driving Resistance Minimum Manufacturer’s Rated Energy kips ft·lb ” 12,000 181 - 300 21,000 301 - 400 28,800 > 400 Wave Equation Analysis required The minimum rated energies do not account for losses and inef ficiencies in the pile driving system. If the hammer select ed cannot satisfy all the criteria, a wave equation analysis shall be submitted by the Contractor for approval. 701.04 600 2. Wave Equation Analysis Method For the pile driving equipment to be acceptable, the driving stresses predicted by the wave equation analysis shall not exceed the values where pile damage impends. These limiting values shall be calculated as follows: a. The maximum compressive and tensile driving stresses for 130 steel piles = 0.9F y.
b.The maximum compressive driving stress for prestressed concrete piles = (0.85f’ c - fpe), where f pe is the effective prestress value.
c.The maximum tensile driving stress, psi, for prestressed concrete piles = ටf c' + f pe3, where f’ c and f pe are expressed in psi.
d.The effective prestress, f pe, shall be obtained from the approved working drawings.
e.The maximum driving stress, psi for timber piles shall not exceed 3F co, where F co is the base resistance of wood in compression parallel to the grain, in psi.
b.Pile Hammers Piles may be driven with air, steam , diesel, or hydraulic hammers. Gravity hammers, vibratory hammers, and other pile driving methods shall be used only if 150 specified or approved in writing by the Engineer. 1. Gravity Hammers Gravity or drop hammers shall be used to drive timber piles only. The ram shall have a weight of between 2,000 and 3,500 lb . The height of drop shall not exceed 12 ft. The weight of gravity hammers shall not be less than the combined weight of the helmet and pile. All gravity hammers sh all be equipped with hammer guides and helmet to ensure concentric impact on the drive head.
2.Single or Double Acting Steam and Air Hammers 160 The plant and equipment furnished for steam and air hammers shall have sufficient capacity to maintain, under working conditions, the volume and pressure specified by the manufacturer of the hammer. The hose connecting the air compressor to the hammer shall be at least the mi nimum size recommended by the manufacturer. The plant and equipment shall be equipped with accurate chamber pressure gauges which are easily accessible to th e Engineer. If wave equation analysis is not used for pre-approval, the weight of the striking parts of air and steam hammers shall be equal to or greater than one-third the combined weights of the drive head and pile being 701.04 601 driven. The striking parts shall not weigh less than 2,800 lb. Proximity switches and an electronic readout de vice shall be provided prior to driving piling. 170
3.Diesel Hammers Open-end or single acting diesel hammers shall be equipped with a device such as graduated rings or grooves on the ram to enable the Engineer to visually determine hammer stroke at all times during pile driving operations. The Contractor shall provide the Engineer a chart from the hammer manufacturer equating stroke, blows per minute, and potential energy for the approved open-end diesel hammer. The Contractor shall also provide and maintain, in working order, an approved device that automatically measures and displays the ram stroke for open-end diesel hammers. 180 Closed-end double acting diesel hammers shall be equipped with an accurate bounce chamber pressure gauge, easily accessible to the Engineer. The Contractor shall provide the Engineer a calibrated chart equating bounce chamber pressure to either equivalent energy or stroke for the closed-end diesel hammer to be used. Calibration of actual hammer performance shall be performed no more than 90 days prior to the beginning of the work. 4. Hydraulic Hammers Under working conditions, the power plant shall have sufficient capacity to maintain the volume and pressure for the hydraulic hammer as specified by the 190 manufacturer. Hydraulic hammers shall also be equipped with a controlled variable stroke system and a readout device to measure ram energy. The plant and equipment shall be equipped with accurate pressure and velocity gauges and an energy readout device which are easily accessible to the Engineer.
5.Vibratory Hammers Except for pile lengths which have been evaluated from load test piles, the nominal driving resistance of the piles driven with vibratory hammers shall be verified by redriving the first pile driven in each group of 10 or fewer piles with an impact hammer of suitable energy to measure the nominal driving resistance before driving 200 the remaining piles in the group. All piles which rely on point bearing capacity shall be redriven with an impact hammer. (c) Pile Driving Aids Pile driving aids such as jets and followers, shall not be used unless specified or approved in writing by the Engineer. If specified or approved, pile driving aids shall be used for installing production piles only after the minimum pile tip elevation is established by means of load testing or indicator test piles conventionally driven in accordance with 701.05. The Contractor shall perform all extra load tests or extra work required to drive indicator test piles as determined by the Engineer. 210
1.Hammer Cushion All impact pile driving equipment, except gravity hammers, shall be equipped with a suitable thickness of hammer cushion material to prevent damage to the hammer 701.04 602 or pile and to ensure uniform driving behavior. Impact hammers designed such that a hammer cushion is not required are excluded from this requirement. Hammer cushions shall be made of durable, manufactured materials, provided in accordance with the hammer manufacturer’s guidelines. Wood, wire rope, or asbestos hammer cushions shall not be used. A striker plate, as recommended by the hammer manufacturer, shall be placed on the hammer cushion to ensu re uniform compression of the cushion 220 material. The condition of the hammer cushion shall be checked with the Engineer when beginning pile driving at each structure or after each 100 h of pile driving, whichever is less. A hammer cushion whose thickness has been reduced to less than 75% of the original thickness shall be replaced. 2 . H e l m e t Piles driven with impact hammers shall ha ve an adequate helm et that adequately distributes the hammer blow uniformly and concentrically to the pile head. The helmet shall be axially aligned with the hammer and the pile shall be guided by the leads and not be free-swinging. The helmet shall fit around the pile head and prevent transfer of 230 torsional forces during driving while maintaining proper alignment of hammer and pile. For steel and timber piling, the pile heads shall be cut squarely. For timber piles, the least inside helmet horizontal dimension or hammer base horizontal dimension shall not exceed the pile head diameter by more than 2 in. If the timber pile diameter slightly exceeds the least helmet or hammer base dimension, the pile head shall be trimmed to fit the helmet. A helmet as recommended by the manufacturer shall be provided to hold the axis 240 of the pile in line with the axis of the hammer. The pile head shall be plane and perpendicular to the longitudinal axis of the pile to prevent eccentr ic impacts from the drive head. 3. Pile Cushion The heads of concrete piles shall each be protected with a pile cushion made of plywood, hardwood, or composite plywood and hardwood materials. The use of manufactured pile cushion materials sh all be by the hammer manufacturer’s recommendation. The pile cushion dimensions shall equal or exceed the cross-sectional area of the pile top, and shall be sized to fit the dimensions of the pile cap. 250 The minimum pile cushion thickness placed on the pile head prior to driving shall be either as recommended by wave equation analysis or not less than 4 in. if the dynamic formula is used. A new pile cushion shall be provided for each pile. The pile cushion shall be replaced if, during the driving of th e pile, the cushion is either compressed more than one-half the original thickness or begins to smolder or burn. Pile cushions shall be protected from weather and kept dry prior to use. Pile cushions shall not be soaked in liquid unless approved by the Engineer. A used pile cushion in acceptable condition shall be used for restrike tests. The used pile cushion shall be the same pile cushion from the end of initial driving on that 260 701.04 603 pile unless the condition of that pile cushion is no longer within specification limits. If the original pile cushion is not within specification limits, a used cushion of similar thickness as the end of drive pile cushion shall be used.
4.Leads Piles shall be supported in line and pos ition with leads while being driven. Pile driver leads shall be constructed in a manner that affords freedom of movement of the hammer while maintaining alignment of the hammer and the pile to ensure concentric impact for each blow. Leads may be either fixed or swinging t ype. Swinging leads, when used, shall be fitted with a pile gate at the bottom of the leads. The leads shall 270 be adequately embedded in the ground, or the pile shall be constrained in a structural frame such as a template to maintain alignment. The leads shall be of sufficient length to make the use of a follower unnecessary and shall be designed as to enable proper alignment of battered piles.
5.Followers Followers shall only be used if specified or approved in writing by the Engineer. If a follower is allowed, the fi rst pile in each bent and every tenth pile driven thereafter shall be driven full length without a follower, to verify that adequate pile length is being attained to develop the nominal driving resistance. The follower and pile shall 280 be held and maintained in equal and proper alignment during driving. The follower shall be of such material and dimensions to enable the piles to be driven to the required penetration depth determined necessary from the driving of the full length piles. The final position and alignment of the first two piles installed with followers in each substructure unit shall not exceed more than 3 in. from the locations shown on the plans before additional piles are installed. 6. Jets Jetting shall only be allowed if specified or approved in writing by the Engineer. 290 The Contractor shall determine the number of jets and the volume and pressure of water at the jet nozzles necessary to freel y erode the material adjacent to the pile without affecting the lateral stability of the final in-place pile. The Contractor shall be responsible for all damage to the site caused by unapproved or improper jetting operations. If jetting is specified, the jetting plant shall have sufficient capacity to enable installation to the re quired elevation, location, and alignm ent in accordance with 701.09(b). Unless otherwise directed, external jet pipes shall be removed once the pile tip is 5 ft above the prescribed tip elevation, depending on soil conditions. The pile shall then be driven to the nominal driving resistance with an impact hammer. The Contractor shall provide suitable sediment control measures for jet water in 300 accordance with the sp ecifications. Where practical, all p iles in a pile group shall be jetted to the required penetration depth before beginning pile driving. Where large pile groups or pile spacing and batter make this impractical, restrike tests on a select number of previously driven piles shall be performed to check nominal driving resistance after jetting operations are completed. 701.04 604 Upon completion of driving a jetted pile, all voids around the pile shall be filled with B borrow and saturated with water.
7.Collars 310 Where timber piles are used, collars, bands, or other devices shall be provided to protect piles against splitting and brooming. 8. Pile Shoes, End Plates, and Conical Pile Tips Pile shoes shall be used when specified. End plates or conical pile tips shall be used on pipe piles. Steel pile shoes shall be used on H piles if specified. If shoes are required on timber piles, the tips of timber piles shall conform to the approved steel shoes to ensure a firm uniform contact and prevent local stresses concentrations in the timber. 320

701.05 Nominal Driving Resistance of a Driven Pile The Engineer will use one of the following methods as specified to determine the nominal driving resistance of a driven pile. (a) Dynamic Formula

The nominal driving resistance will be determined by means of a dynamic formula. Piles shall be driven to the pene tration depth necessary to obtain the nominal driving resistance. The nominal driving resistance, as shown on the plans, can be calculated from the formula as follows: 330 R ndr = 1.75ξE x (log 10N) – 100 where: R ndr = nominal driving resistance in kips E = manufacturer’s rated energy in foot·pounds at the field observed ram stroke and not reduced for efficiency log 10N = logarithm to the base 10 of the quantity 10 multiplied by N, where N is the number of hammer blows per 1 in. at final penetration. An indicator test pile shall be the first pile driven at each bent and pier and shall be driven to the plan tip elevation or to the nominal driving resistance whichever occurs first. All indicator test piles shall be driven with impact hammers unless otherwise directed. The length of indicator test piles shall be greater than the estimated length of production piles to provide for variation in soil conditions. Precast concrete 340 and treated timber test piles shall be a minimum of 10 ft longer than the estimated length of piling shown on the plans. Steel piles shall be provided such that additional 10 ft of driving will not require an additional splice. The driving equipment used for driving indicator test piles shall be identical to that proposed for use on the production piling and shall be subject to approval. The 701.05 605 Contractor shall excavate the ground at each i ndicator test pile loca tion to the elevation of the bottom of the footing before the pile is driven, unless otherwise shown on the plans. To assess the effects of relaxation and setup, each indicator test pile shall be restruck after the number of hours specified unless otherwise approved. The hammer shall be warmed up before driving begins by applying at least 20 blows to another fixed object. The maximum amount of penetra tion required during restrike shall be 3 in., or the total number of hammer blows shall be 20, whichever occurs first. If the indicator test pile does attain the nominal driving resistance upon restriking, the penetration resistance attained during initial driving shall be used to establish the adequacy of production piles. If the nominal driving resistance is not attained upon restriking, the Contractor shall redrive the indicator test pile until it achieves the nominal driving resistance and repeat the re strike procedure described above. If the 360 nominal driving resistance is still not obtained, pile driving shall stop immediately and the Office of Geotechnical Services shall be notified. A record of driving indicator test piles, which includes the number of hammer blows per 1 ft for the entire driven length, the as-driven length, cutoff elevation, penetration, and all other pertinent information will be kept by the Engineer. The penetration resistance at various hammer strokes versus nominal driving resistance relationship will be determined based on the driving of representative indicator test piles. 370 If indicator piles are not shown on the plans, all piles shall be driven to the nominal driving resistance and restriking is not required.

b.Dynamic Pile Load Test Dynamic monitoring will be performed for the purpose of obtaining the nominal driving resistance, pile driving stresses, pile integrity, and pile driving system performance. Dynamic monitoring will be conducted by PDA in accordance with ASTM D4945. PDA will be performed on the fi rst pile driven. The length of the pile used in the dynamic pile load test shall be a minimum of 10 ft greater than the estimated length of production piles in order to provide for variation in soil conditions. 380 The Contractor shall assist the Department in obtaining dynamic measurements with the PDA during initial pile driving and during pile restrikes. If a static load test is required, the dynamic pile load test shall be performed on the same pile as the pile used in the static load test. The restrike for the dynamic pile load test on a static load test pile shall be performed within 48 h of completion of the static load test.
1.Scheduling The Contractor shall notify the Engineer at least seven calendar days before the scheduled date of driving piles to be monitored by PDA. The Contractor shall confirm the driving date three calendar days prior to the scheduled driving date. The Contractor 390 shall indicate at which foundation production pile driving is to begin. The Engineer will provide final driving criteria for the indicated foundation first. 701.05
2.Dynamic Monitoring The Contractor shall make the steel p iles available so that the Engineer can predrill the required instrument attachment holes prior to the Contractor placing the pile in the leads. Each pile to be tested shall be instrumented with force and acceleration transducers provided by the Depa rtment. The Contractor shall install the transducers before striking the pile. The pile driving may have to be temporarily interrupted for the transducers to be adjusted or replaced, or for the monitoring results 400 assessed. Prior to placement in the leads, the Contractor shall make each designated concrete or timber pile available for taking of wave speed measurements and for predrilling the required instrument attachment holes. When wave speed measurements are made, the piling shall be in a horizontal position and not in contact with other piling. Predriving wave speed measurements will not be required for steel piles. The Contractor shall mount the instruments near th e head of the pile after the pile is placed in the leads. 410 The Contractor shall drive the test pile to the minimum tip elevation and to the penetration depth at which the dynamic test equipment indicates that the nominal driving resistance shown on the plans and in accordance with 701.04(a) has been achieved. The Contractor may reduce the driving energy transmitted to the pile by using additional cushions or reducing the energy output of the hammer in order to maintain stresses below the values shown in 701.04(a)1. If non-axial driving is indicated by the dynamic test equipment measurements, the Contractor shall immediately realign the hammer system. Upon determination by the Engineer that valid data has been secured, the Contractor shall assist the Engineer with the removal of the instrumentation from the pile. 420 3 . R e s t r i k e The Contractor shall wait the specified minimum time period prior to the restriking of a dynamic load test pile. The Contractor shall assist the Engineer with reattachment of dynamic test instruments. The hammer shall be warmed up before restriking begins by applying at least 20 blows to another pile or other fixed object. The maximum amount of penetra tion required during re strike will be 3 in., or the total number of hammer blows will be 20, whiche ver occurs first. If the pile does not achieve the required nominal driving resistance during restrike, the Engineer will either accept the tip elevation or specify additional pile penetration and testing. 430 Once the restrike test for the test pile is complete, the Engineer will run CAPWAP analyses and will provide the final driving criteria within two business days of the restrike test. Production piles driven prior to receipt of the final driving criteria shall be done at the Contractor’s risk. Final driving criteria for additional structures will be provided within two business days of the restrike test or, when multiple test piles are restruck the same day, at a rate of one substructure location per business day in the order requested by the Contractor. 701.05
4.PDA on Local Public Agency Contract 440 The Contractor shall perform the PDA in accordance with ASTM D4945. The firm conducting the PDA shall have at least one geotechnical engineer who shall have achieved one of the following certification levels: intermediate, advanced, master, or expert, within the last three years thro ugh the Dynamic Measurement and Analyses Proficiency Test conducted by Pile Dynamics, Inc., and the Pile Driving Contractors Association. An engineer with a lower certif ication level can provide services so long as this individual is under the direct supervision of an engineer with intermediate certification level or higher. The CAPWAP shall be utilized to determine the as-built pile capacity from the PDA data. The first pile driven for each substructure unit shall be a PDA test pile. The pile driving criteria with the PDA and CAPWAP results shall 450 be submitted to the Department’s Office of Geotechnical Services for approval.
c.Static Load Test A static load test shall be conducted on a non-production test pile at the location shown on the plans. The test pile axial deflection in compression shall be verified by performing actual loading tests of the designated static load test pile in accordance with ASTM D1143, Quick Load Test Method, with loads applied by hydraulic jack. The test shall be continued until either plungi ng failure is achieved or the capacity of the loading system is reached. The nominal pile resistance will be determined from the settlement versus load curve generated by th e incremental loading in accordance with 460 701.05(c)1. The top elevation of all test piles shall be determined immediately after driving and again just before load testing to check for heave. A pile whic h heaves more than 1/4 in. shall be redriven, or jacked, to the original elevation prior to testing. The Contractor shall wait 36 h between the driving of a load test pile and the commencement of the load testing unless otherwise specified. The Contractor shall provide complete protection at all times for the pile, supports, and reference beam from wind, direct sunlight, frost action, or other 470 disturbances. The Contractor shall mainta in an air temperature in the immediate vicinity of the test pile and reference beam of not less than 50°F and shall provide adequate lighting for the duration of the test. No production piles shall be driven until completion of the static pile load test unless approved by the Engineer. Reaction piles shall be driven prior to driving the static load test pile. 1. Load Test Procedure The Contractor shall furnish and construct a suitable reaction frame or load 480 platform to provide a load on the pile having a capacity of 2,000 kips or 150% of the nominal driving resistance, whichever is less. A minimum of seven days prior to driving the static load test pile or construction of the reaction frame or load platform, the Contractor shall submit, for review and approval, detailed working drawings to 701.05 608 scale for the reaction frame or load plat form and loading apparatus including the distances between the load test pile and al l reaction piles and reference beam supports. The submittal shall also include a proposed load test and reaction pile driving sequence, a scaled profile drawing of the loading apparatus detailing the ground surface elevation, the pile cutoff elevation, the dimensions and locations of all bearing plates, the jack, the load cell, the spherical bearing plate, and the reaction beam or 490 platform. Working drawings for the reaction frame and loading apparatus shall be submitted in accordance with 105.02. The submittal shall include calibration certifications for the hydraulic jacks, load cell, pressure gauges, and hydraulic pumps conducted within 30 days of the load test. If required by the Engineer, the jack, load cell, and pressure gauge shall be recalibrated after the load test. The loading apparatus shall be constructed to allow the variou s increments of th e load to be placed gradually, without causing vibration to the test pile. If the approved method requires the use of tension or reaction piles, the reaction piles, if feasible, shall be of the same type and dimensions 500 as the production piles and shall be driven in the location of permanent piles. Reaction piles that are the same type and dimensions as the production piles and are driven in the location of permanent piles will be considered permanent piles. Timber or tapered piles installed in permanent locations shall not be used as tension piles. The primary method of determining the applied load shall be from a calibrated load cell. Incremental loads of 5% of the nominal driving resistance shall be placed on the pile at 5-minute intervals until continuous jacking is required to maintain the incrementa l load or the capacity of the load frame is reached. Support for the load test plates, jack, and ancillary devices shall be provided to prevent them from 510 falling in the event of a release of load due to hydraulic failure, test pile failure, or other cause. The Contractor shall furnish the hydraulic pump, load cell, spherical bearing plate, and two reference beams. Each reference beam shall be a W or M section, of minimum length of 20 ft, and a weight of 5 to 20 lb/ft unless otherwise approved. The Engineer will conduct the static load test and will provide the gauges to measure movement of the test pile. The Contractor shall provide al l assistance necessary to perform the static load test. The Contractor shall furnish and install telltale rods encased in a lubricated pipe in the test pile prior to the static load test. 520 If the nominal pile resistance of a pile from the load settlement curve does not equal or exceed the nominal driving resistance shown on the plans, the Contractor shall redrive the pile to an adequate nominal driving resistance. The increase in nominal driving resistance will be determined by PDA. The pile shall be load tested again after the appropriate waiting period. Load tests shall be repeated as many times as necessary until the pile carries the required load. The pile axial resistance will be determined from the test data in acco rdance with the Davisson Meth od as specified in the AASHTO LRFD Bridge Design Specifications. 530 701.05 609 2. Hydraulic Jacks, Pressure Gauges, and Load Cell Hydraulic jacks and pressure gauges shall be used for the superimposed load. The jacks, pressure gauges, load cell, and hydraulic pumps shall be calibrated with each other within the last 30 days by an independent laboratory. When a jack, pressure gauge, load cell, and hydraulic pump are cali brated, they shall be calibrated and used as a unit. All calibration checks shall be within 5% of the applied load if calibrated as a unit. Changing one of the four components shall require recalibration prior to use. Pressure gauges shall be a minimum of 4 1/2 in. in diameter with gradations in accordance with ASTM D1143. Hydraulic jacks shall have a nominal load capacity exceeding the maximum anticipated jack load by at least 20%. The jack, pump, any 540 hoses, pipes, fittings, gauges, or transducers used shall be rated to a safe pressure corresponding to the nominal jack capacity. The Contractor shall provide copies of the most recent calibration certifica tion a minimum of five days prior to the static load test.
3.General Requirements On completion of the static load test, a test pile or anchor pile which is not a part of the finished structure shall be removed or cut off at least 1 ft below either the bottom of footing or the finished ground elevation if not located within the footing area. 550

701.06 Blank

701.07 Piling Length

The lengths of piles shown on the plans and in the Schedule of Pay Items are estimated lengths and are for bidding purposes only. The Contractor shall provide the actual length of piles necessary to obt ain the nominal driving resistance and penetration depth required as determined from results obtained from driving representative test piles or other pertinent data. There will be expected variations in final tip elevations due to differences in nominal pile driving resistance. The final tip elevation of each pile will be determined during the driving operation. If minimum tip 560 elevations are specified, the Contractor shall drive piles to a penetration depth that satisfies this requirement in addition to the nominal driving resistance. If no penetration depth or minimum tip elevation is specified, the pile shall be driven a minimum of 10 ft below the bottom of the footing elevation. The Contractor shall also furnish satisfactory evidence as to the identification, such as heat numbers for steel piles, of all portions of a built-up pile.

701.08 Nominal Driving Resistance of Production Piles

Production piles shall be driven the depth necessary to obtain the required nominal driving resistance as determined by 701.05. If a minimum pile tip elevation is shown 570 on the plans, in addition to obtaining the required nominal driving resistance, production piles shall also be driven to the minimum pile tip elevation or to practical refusal. When the nominal driving resistance is determined in accordance with 701.05(a), for acceptance, the Engineer will record, at a minimum, the number of hammer blows 701.08 610 per inch or per foot of pile movement for the last 24 in. of driving. When the nominal driving resistance is determined in accord ance with 701.05(b), for acceptance, the Engineer will record the blow count per in ch or foot of pile movement and the associated hammer stroke for the last two consecutive feet of driving, and the final pile 580 tip elevation as per the pile driving criteria established through the dynamic pile load test. Practical refusal will be defined as 20 blows per inch of penetration with the hammer operated at its maximum fuel or energy setting, or at a reduced fuel or energy setting recommended by the Engineer based on pile installation stress control and less than 1/4 in. rebound per blow. The Contractor shall stop driving as soon as the Engineer determines that the pile has reached practical refusal. The nominal driving resistance of jetted piles shall be based on impact driving 590 penetration resistance after the jet pipes have been removed. Jetted piles not attaining the nominal driving resistance at the ordered length shall be spliced and driven with an impact hammer until the nominal driving resistance is achieved in accordance with the driving criteria in 701.05. The required nominal driving resistance of piles driven with followers will only be considered acceptable if the piles with followers attain the same tip elevation as the full length piles driven with out followers, installed in accordance with 701.04(c)5. The required nominal driving resistance of piles driven with vibratory hammers 600 shall be based on the driving resistance recorded during impact driving after the vibratory equipment has been removed from the first pile in each group of 10 piles. Vibrated piles not attaining the nominal driving resistance at the ordered length shall be spliced and driven with an impact hammer until the nominal driving resistance is achieved in accordance with the driving crite ria in 701.05. Once the nominal driving resistance is attained, the remaining nine piles in the group shall be installed to similar penetration depths with similar vibratory hammer power consumption and rate of penetration as the first pile.

701.09 Preparation and Driving 610

For steel and timber piling, the pile heads shall be plane and perpendicular to the longitudinal axis of the pile before the helmet is attached. The pile heads shall be protected with a hammer cushion. Precast concrete pile heads shall be flat, smooth, and perpendicular to the longitudinal axis of the pile. Prestressing st rands shall be cut off below the surface of the end of the pile. The pile head shall be chamfered on all sides. The heads of all concrete piles shall be protected with a pile cushion. Approval of a pile hammer relative to driving stress damage will not relieve the 620 Contractor of responsibility for piles damaged due to misalignment of the leads, failure of hammer cushion or cushion material, failure of splices, malfunctioning of the pile 701.09 611 hammer, or improper construction methods. Piles damaged for such reasons will be rejected and shall be replaced if the Engine er determines that the damage impairs the strength of the pile.

a.Pilot Holes Pilot holes are prebored, predrilled, or cored. After a pile is driven thru a pilot hole, all voids around the pile shall be filled with B borrow. Water shall be added to the hole to saturate the final placement of B borrow. 630 If the Engineer determines that preboring or predrilling has disturbed the nominal driving resistance of previously installed piles, those piles that have been disturbed shall be restored by means of redrivi ng or other approved remedial measures. Redriving or other remedial measures shall be instituted after the preboring or predrilling operations in the area have been completed.
1.Preboring When shown on the plans, the Contract or shall prebore holes at the locations shown and to the depth specified. Prebored holes shall be 2 in. smaller than the 640 diameter or diagonal of the pile cross-section that is sufficient to allow penetration of the pile to the specified depth. If subsurface obstructions, such as boulders or rock layers, are encountered, the hole diameter may be increased to the least dimension which is adequate for pile installation. Augering, wet-rotary drilling, spudding, or other methods of preboring shall be used only when specified or approved in writing by the Engineer. The procedures shall be carried out so as not to impair the nomin al driving resistance of the piles already in place or the safety of exis ting adjacent structures. Except for end bearing piles, preboring shall be stopped at least 5 ft above the pile tip elevation shown on the plans. The pile shall be driven with an impact hammer to the specified penetration resistance. Where piles are to be end-bearing on rock or hardpan, preboring may be carried to the surface of the rock or hardpan. The piles shall then be driven with an impact hammer to ensure proper seating. 2. Predrilling The hole shall have a minimum diameter of not less than the greatest dimension of the pile cross-section plus 4 in. The holes shall be drilled to the elevations shown on the plans. 660 Before driving piles for end bents, holes to receive piling shall be predrilled or spudded through new embankment to the original ground elevation if the new embankment is 10 ft or more in height. If the new embankment is less than 10 ft in height, predrilling is not required. If new embankment in the area of the end bents is to be constructed of sand, gravel, or other permeable material in which a predrilled hole would not remain open, the piling sha ll be driven before the embankment is constructed. 701.09 Pilot holes for end bent piles for structures with integral end bents shall be 670 predrilled to the depth specified in the plans, regardless of the height of new embankment. If pile sleeves are shown on the plans, the drilled holes shall be sleeved to maintain the opening during the driving of the piles. If bentonite grout is shown on the plans, it shall be used to fill the annular space around the pile. The grout shall be placed at the depths shown on the plans or as directed. The entire annular space shall be filled from the bottom upwards to the top of the pile in one pumping operation using a tremie pipe. 680 Tremie pipe construction shall include side discharge ports. The tremie pipe can be terminated by means of a tee connection. Tremie pipe may be PVC, however, joints shall not be glued or cemented. 3. Cored Hole in Rock When specified, holes shall be cored in to rock to accommoda te pile placement. The approach grade shall be completed before coring is begun. Holes of the diameter shown on the plans shall then be predrilled through the embankment into solid rock to the elevations shown on the plans or as otherwise directed. The piles shall be driven 690 to practical refusal at the bottom of the cored holes. The holes in cored rock shall then be filled with concrete.
b.Location and Alignment Tolerance A maximum deviation of 1 1/2 in. in any direction from the plan position will be allowed in pile trestle bents and exposed pile bents. A maximum deviation of 6 in. in any direction will be allowed for a foundation pile in footings for piers or abutments. The tendency of concrete or steel piles to twist or rotate shall be prevented and corrected. Piles to be swaybraced shall be aligned as necessary so that the swaybracing may be properly welded to the piles by a welder qualified in accordance with 711.32. 700 No pile shall be closer than 4 in. from an edge of the pile cap. Pulling or pushing laterally on installed piles to correct misalignment or splicing a properly aligned section on a misaligned section will not be allowed. The pile head at cutoff elevation shall be within 2 in. of plan elevation for bent caps supported by piles. Piles driven at integral end bents shall be installed so that the axial alignment of the top 10 ft of the pile is within 2% of the specified alignment. Battered piles shall be installed so that the alignment of the top 10 ft of the pile does not vary by more than 3% from the batter rate shown on the plans. 710 If the location or alignment tolerances are exceeded, the extent of overloading shall be investigated. If the Engineer determines that corrective measures are 701.09 613 necessary, such corrective measures sha ll be designed and constructed by the Contractor. Proposed corrective measures will be subject to approval by the Engineer.
c.Heaved Piles The Contractor shall take an elevatio n reading on each pile in a foundation immediately after each pile in that foundation has been driven and again after all piles in that foundation have been driven. Elevation readings for checking pile heave shall 720 continue until the Engineer de termines that such checking is no longer required. All piles which have heaved more than 1/4 in. shall be redriven to the required resistance or penetration. If pile heave is detected for pipe piles, the piles shall be redriven to original position prior to filling with concrete. A hammer-pile cushion system shall be submitted and approved prior to redriving pipe piles which have been filled with concrete.
d.Installation Sequence The order of placing individual piles within a pile group shall begin from the center of the group and proceed outward in both directions unless an alternate 730 installation sequence is approved in writing. For a bent with a single row of piles, pile driving shall begin at one end of the bent and proceed toward the opposite end.
e.Inspection The Engineer shall be given a minimum of 24 h notice before driving piling. No pile shall be driven except in the presence of the Engineer. Prior to placing concrete in driven pipe piles, the Contractor shall supply suitable lighting for the inspection of each pipe pi le by the Engineer throughout its entire length. 740
f.Pouring Concrete After all water and other foreign substances have been removed from the pipe piles and the final approval given, reinforcing bars, if specified, shall be placed, and the pipe piles shall be filled with class A concrete in the presence of the Engineer. Concrete shall be deposited into pipe piles in a stream with a cross-sectional area that is no more than approximately 50% of the area of the pipe pile to prevent air pockets from forming. At a minimum, concrete shall be vibrated in the upper 25 ft of the pipe piles. Concrete shall not be placed in pipe piles until all pile driving has progressed beyond a radius of 15 ft from the pile to be filled. All pile driving within the above 750 limits shall be discontinued until the concrete in the last pile cast has cured for a minimum of 48 h.

701.10 Unsatisfactory Piles The method used in driving piles shall not subject the piles to excessive or undue abuse which produces deformation of the steel, injurious splitting, splintering, and brooming of the wood, or crushing and spalling of the concrete. All piles damaged during driving due to internal defects, improper driving, being driven out of its proper

location, or being driven below the designated cutoff elevation shall be corrected as directed. 760 701.10 Piles which have been bent, or otherwis e damaged, during installation shall be considered unsatisfactory unless the nominal driving resistance is proven by load tests performed by the Contractor. If such tests indicate inadequate pile resistance, corrective measures such as the use of th e bent piles at reduced pile resistance, installation of additional piles, strengthening of the bent piles, or replacement of the bent piles shall be done as approved by the Engineer. A concrete pile will be considered defective if a visible crack appears around the entire periphery of the pile or if a defect is observed, as determined by the Engineer. 770

701.11 Splicing Piles Full length piles shall be placed in the leads if practical. However, if splicing is necessary, the following methods shall be used.

a.Steel Piles Splicing of steel piles shall be made as shown on the plans. The top of the pile to be extended shall be restored to its original cross-section shape. The mating end of the other pile shall be beveled as shown on the pl ans. A wire brush or grinder shall be used to remove any scale, dirt, slag, or other foreign material that is detrimental to 780 fabricating a sound weld from all surfaces to be welded. For H piles, a mechanical splice shall not be used within 20 ft of the ground surface unless it is proven that the splice can transfer the full pile strength in compression, tension, and bending. Splices for pipe piles shall be watertight. All work shall be done with approved methods and materials and by welders qualified in accordance with 711.32. If the temperature of the piles is below 50°F, both piles to be spliced shall be preheated to a minimum temperature of 70°F in the vicinity of the splice immediately prior to welding. The temperature of the piles shall be maintained at a minimum of 50°F until the welding is complete. There shall not be more than two splices exposed to view in each length of piling after driving is completed. A mechanical splice shall not be used in integral 790 end bents.
b.Timber Piles Timber piles shall not be spliced.
c.Concrete Piles Full length concrete piles shall be used where practical. If splicing is necessary, concrete splice details shall conform to th e contract documents. Mechanical splices including drive-fit splices may also be used if the splice can transfer the full pile strength in compression, tension and bending. 800

701.12 Blank

701.13 Cut-Off Lengths The tops of all steel pile shall be cut off at the elevation shown on the plans. All

unused cut-off lengths shall become the property of the Contractor and shall be removed from the project site. 701.11 The length of timber pile above the elevation of cut-off shall be sufficient to enable the complete removal of all materi al injured by driving. Immediately after 810 making final cut-off on treated timber foundation piles, the cut area shall be treated with copper naphthenate in accordance with AWPA Standard M4. Timber piling supporting timber structures where the piles are cut off, but not concrete capped, shall be treated with copper naphthenate in accordance with AWPA Standard M4. A layer of saturated building felt or fiberglass cloth which overlaps the side of the pile at least 2 in. shall be securely fastened and completely covered with 20 gauge thick galvanized metal or aluminum sheeting. All cuts, injuries, and holes, which occur from removal of nails or spikes that penetrate the treating zone as well as bolt holes for connections, shall be treated by applying coal-tar roof cement in 820 accordance with ASTM D5643.

701.14 Method of Measurement

The driven length of treated timber piles, untreated timber piles, steel pipe piles, steel H piles, and concrete piles will be measured by the linear foot to the nearest 0.1 ft. This includes piles used as indicator test p iles, dynamic test piles, or static load test piles. Measurement will be made only for the actual number of linear feet of piling complete in place. For concrete piles, this length will not include extensions or the portion of the pile cutoff to make the extension. 830 Dynamic pile load test, static pile load test, indicator test pile restrike, dynamic test pile restrike, pile shoes, and conical pile tips will be measured per each. The limits of the epoxy coated steel pipe portion of the pile will be measured by the linear foot to th e nearest 0.1 ft as shown on the plans. Prebored holes and cored holes in rock will be measured by the linear foot complete in place of th e diameter specified. Class A concrete, reinforcing bars, epoxy coating, reaction pile s if not used as 840 production piles, splices, end plates, predrilling, cleaning of drilled holes, drilling fluids, sealing materials, casing, jetting, followers, spudding, or other methods used to facilitating pile driving will not be measured for payment. Reinforced concrete encasement for steel H piles will be measured by the linear foot as shown on the plans. 701.15 Basis of Payment All treated timber piles, untreated timber p iles, steel pipe piles, steel H piles, and concrete piles driven will be paid for by the linear foot. Payment will be made only for 850 the actual number of linear feet of piling complete in place. Extensions for concrete piles will be paid for in accordance with 109.05. 701.15 616 Driven piles used as indicator test piles or dynamic test piles that are left in place and subsequently used as production piles will be paid for by the linear foot as either production indicator test piles or production dynamic test piles. Reaction piles used in a static pile load test that are left in place and subsequently used as a production pile will be paid for by the linear foot as the type of production pile they represent. Driven piles used as indicator test piles, dynamic test piles, or static load test piles that are not used as production piles will be paid for by the linear foot as non-production dynamic, 860 indicator, or static test piles respectively. If the quantity of driven piling is less than the plan quantity or the quantity as ordered by the Engineer, the Department will pay 50% of the cost to re-stock unused piling if the Contractor elects to re-stock piling and provides a paid invoice showing the re-stocking fee. Payment will be made for piling, restock. The epoxy coated portion of the piles may be furnished and driven at lengths greater than those shown on the plans. These additional lengths of epoxy coated piles left in place and accepted will be paid for as the uncoated portion below the plan limits 870 of required epoxy coating. Prebored holes and cored holes in rock will be paid for at the contract price in linear feet. Payment will be made under: Pay Item Pay Unit Symbol Conical Pile Ti p, ________ ....................................................... EACH 880 pile size Cored Hole in Rock, ______ in. ................................................ LFT diameter Dynamic Pile Load Test ............................................................ EACH Pile Shoe, ________ .................................................................. EACH pile size Pile, Concrete _____ x ___ __.................................................... LFT size Pile, Prestressed Concrete _____ x _____ ................................. LFT size 890 Pile, Steel H, Epoxy Coated, HP _____ x _____ ...................... LFT size Pile, Steel H, HP _____ x _____ ............................................... LFT size Pile, Steel Pipe, ______ ______, _____ ___ ............................... LFT pipe wall thickness diameter Pile, Steel Pipe, Epoxy Coated, ____________, ________ ...... LFT pipe wall thickness diameter Pile, Timber ............................................................................... LFT 701.15 617 Pile, Timber, Treated ................................................................. LFT 900 Piling, Restock ........................................................................... LS Prebored Hole, _______ in. ....................................................... LFT diameter Reinforced Concrete Encasement for H Piles ........................... LFT Static Pile Load Test, ________ ................................................ EACH pile size Test Pile, Dynamic, ________, Non-Production ....................... LFT pile size Test Pile, Dynamic, Production ................................................. LFT Test Pile, Dynamic, Restrike ..................................................... EACH 910 Test Pile, Indicator, ________, Non-Production ....................... LFT pile size Test Pile, Indicator, Production ................................................. LFT Test Pile, Indicator, Restrike ..................................................... EACH Test Pile, Static Load, ________, Non-Production ................... LFT pile size All costs associated with the dynamic pile load test except the cost of the test pile and test pile restrike shall be included in the cost of the dynamic pile load test. All costs associated with the static pile load test except the cost of the test pile shall be included in the cost of the static pile load test. The cost of reaction piles used in the static load test and not incorporated into the work as production piles shall be included in the cost of the static load test. The cost of furnishing and placing concrete, B borrow, or bentonite grout necessary to fill pilot holes, and all necessary incidentals shall be included in the cost of the pay items of this section. The cost of the following shall be included in the cost of the piling. 930

a.predrilling pilot holes, (b) pile sleeves for predrilling, (c) maintaining open holes during pile driving, (d) broken, bent, damaged, or misplaced piles, (e) concrete filling,
f.corrective location or alignment measures,
g.epoxy coating, (h) splicing piles and jetted sites,
i.modifying or replacing pile driving equipment, 940
j.redriving piles which have heaved more than 1/4 in.,
k.plain and epoxy coated reinforcing bars,
l.repairing epoxy coating,
m.replacing epoxy coated piling, (n) restriking production piles not shown as test piles, 701.15 618 (o) piles which are not acceptable or damaged during driving,
p.piles which were not driven in accordance with these specifications,
q.piles driven with the tops lower than the cutoff elevation, (r) spudding or jetting of piles, 950
s.end plates for pipe piles,
t.all straps on treated and untreated timber piling, and (u) all labor, equipment, and necessary incidentals. No additional payment will be made if the Contractor elects to furnish and drive thicker walled pipe piles than specified. An increase in the size of a pile cap to satisfy edge distance clearance requirements, when approved, shall be at no additional cost to the Department. If the method for driving the piles is specified as 701.05(b) and the contract is a local public agency contract, the Contractor shall include the cost of acquiring the PDA consultant in the cost of the Dynamic Pile Load Test. The cost of mobilization and demobilization for pile driving operations shall be included in the cost of mobilization and demobilization in accordance with 110.04. The cost to control sediment in water from jetting operations shall be included in the cost of the piling. 970 The cost of forms, falsework, class A concrete, reinforcing bars, and necessary incidentals shall be included in the cost of reinforced concrete encasement for H piles.
Source: Indiana Standard Specifications, 2024 Edition. Pages 832 of 1,248.