542 Epoxy Intermedia te Paint ............................................ 909.02(b) Finish Coat for Weathering Steel ................................ 909.02(e) Multi-Component Inorganic Zinc Silicate Primer ....... 909.02(a)1 Organic Zinc Primer .................................................... 909.02(a)2 Polyurethane Finish Coat ............................................ 909.02(c) Structural Steel Coating Systems ................................ 909.03 Waterborne Finish Paint .............................................. 909.02(d) Safety data sheets shall be provided in the QCP for all materials to be delivered to the project site. 20 Caulk used to form the drip bead on weathering steel shall be a clear, 100% silicone caulk. Caulk used on joints of lapping members shall be compatible with either the structural steel paint system or the partial paint system, and in accordance with the paint manufacturer’s recommendations. CONSTRUCTION REQUIREMENTS
619.03 Quality Control and Quality Assurance
The Contractor shall be responsible for the quality of work on the contract and shall ensure that all work has been performed by accepted quality control methods. A QCP shall be prepared and submitted by the Contractor in accordance with ITM 803. No work may begin until written notice ha s been received that the QCP was accepted by the Engineer. The QC manager shall furnish the current referenced SSPC Standards at the project site. Cleaning and painting shall be done by a Contractor certified as SSPC-QP 2 for cleaning and painting existing bridge steel on steel structures shown in the contract 40 documents as being built before 1995. Cleaning and painting shall be done by a Contractor that at a minimum is certified as SSPC-QP 1 for cleaning and painting new bridge steel or for cleaning and painting existing bridge steel on steel structures shown in the contract documents as being built after 1994. The Department will accept work performed on the project through quality assurance inspections and testing. Acceptance testing will be performed and will be the basis for which acceptance will be made.
619.04 Prosecution of Work Prosecution of work shall be in accordan ce with the applicable requirements of
108.04 Once the cleaning and painting operations have begun, it shall be performed on all work days without stoppage until all work has been completed. If the contract 90
contains more than one bridge, a schedule shall be included in the QCP which provides the sequence of work on the bridges. Once work has begun on a bridge, it shall be 619.04 544 performed until complete, including all cleanup. When cleaning and painting beam ends for encasement in concrete is specified, that work may be performed as a separate operation. Permission shall be obtained in writing to start or continue work at the hold points as follows: (a) prior to the acceptance of the QCP and start of work; 100
619.05 Inspection Access to Bridges Safe and reasonable access to all points of the bridge shall be provided for the 110
Engineer’s inspections immediately upon request.
619.06 Maintaining Traffic
The traffic lanes may be restricted wh en surface preparation or painting phases are being performed on a portion of the bridge over the traveled roadway, or as directed, when the need exists. Construction signs in accordance with 801.04 shall be furnished and placement at each project site shall be as shown in th e QCP. However, a “Bridge Painting Ahead” sign may be used in place of the “Road Construction Ahead” sign. 120 The traffic maintenance plan shall include a type of barrier system which shall protect against blasting of vehicles or pedestrians, eliminate abrasive materials and debris from falling onto the traveled portion of the pavement, and prevent the spreading of abrasive materials and debr is in the area which may create a traffic hazard. If the intended purpose of the pr otective devices has not been accomplished, work shall stop until adequate corrections have been made. All abrasive material or debris shall be removed by the end of each day’s work in accordance with 619.07.
619.07 Safety and Environmental Requirements 130
Safety requirements, pollution control, and disposal of existing paint waste and debris shall be in accordance with the following requirements.
619.08 Surface Preparation of Concrete and Steel The tops of all concrete and steel pier caps, concrete abutment caps, and 2 ft down all sides of concrete pier and abutment caps shall be washed. The washing shall be accomplished by means of a pressure washer with potable water. The pressure shall 340
be between 800 and 1,500 psi. If detergents or other additives are added to the water, the surface shall be rinsed with potable water before the detergents dry. Cleaning of steel surfaces shall be performed by an SSPC certified contractor. This requirement will not apply to the following:
619.09 Paint Systems Paint systems shall be applied in accordance with the manufacturer’s
recommendations. The dry film thickness of a paint coating will be measured with a calibrated film thickness gauge in accordance with SSPC PA 2. All paint coatings shall have a dry film thickness not less than 80% of the required dry film thickness. 440
619.10 Painting Painting shall be performed by a SSPC certified contractor, except as noted in
619.08. Concrete at all junction points of concrete and steel shall be adequately shielded or otherwise protected so the application of paint on steel is full and complete, and that spraying onto the concrete is minimized. 619.10 552 460 If a blasted or painted surface is unsatisfactory, removal of the paint, thorough cleaning of the surface, and repainting or other correction will be required as directed. Where defects or damages occur in a film of any coating, all defective areas shall be removed to soundly bonded paint or bare steel and painted to the specified thickness. No lettering shall be painted on bare or painted steel surfaces, except marks required for erection and project information stenciled in accordance with 619.10(g). Joints of all lapping members shall be caulked after either the application of the epoxy intermediate coat of the structural steel paint system or the application of the 470 organic zinc primer of the partial paint system. The intermediate or primer coat shall be cured to the manufacturer’s recommended coating cure time prior to caulking.
619.12 Field Painting New Steel Bridge
All structural steel surfaces which ar e accessible after final erection shall be painted with the remaining coatings specified for structural steel paint system in 630 accordance with 619.09(a) in th e field after final erection. Portions of new structural steel, including cross frames, diaphragms, stiffeners, and all other appurtenances located within the limits of concrete end bent encasement as shown on the plans, will only require the inorganic zinc primer coat. Surface areas where the inorganic zinc primer was damaged during shipping, handling, and erection shall be cleaned in accordance with 619.08(a) and either 619.08(d) or 619.08(i). Likewise, all bolt and field connections shall be cleaned in the same manner. All the damaged areas, and bo lt and field connections shall then be 640 painted with the inorganic zinc primer app lied in the shop. This requirement will not apply to temporary steel bridges. 619.12 556 Where steel surfaces have been painted with the full paint system and the paint coatings have been damaged, the affected steel surface areas shall be cleaned in accordance with 619.08(i). Stru ctural steel paint system shall then be re-applied. For weathering steel girders, caulk shall be applied to act as a drip bead as shown on the plans. 650
619.13 Painting Existing Steel Bridges
The surfaces to be cleaned and painted shall include the surfaces of all steel members of the superstructure, substructure, floor beams, stringers, plates, castings, bearing assemblies, ornamental handrails, lattice work, and other steel appurtenances. When shear connectors have been specified, the top of the top flange shall not be painted. If the contract specifies clean steel brid ge, the bridge steel shall be cleaned in accordance with 619.08(a) and either 619.08(e) or 619.08(i). The structural steel paint system in accordance with 619.09(a) shall be used for painting. 660 If the contract specifies cl ean steel bridge, partial, the bridge steel shall be cleaned in accordance with 619.08(a) and either 619.08(e) or 619.08(h). The partial paint system in accordance with 619.09(b) shall be then used for painting. When the plans show encasing the ends of existing structural steel members in concrete, all beams and girders, cross fram es, diaphragms, stiffeners, and all other appurtenances located within the limits of the partial painting zone as shown on the plans shall be cleaned in accordance with 619.08(a) and either 619.08(e) or 619.08(h) and shall receive the partial paint system in accordance with 619.09(b). If the contract 670 also includes pay items for clean steel bridge and paint steel bridge, all exposed structural steel shall be cleaned in accordan ce with 619.08(a) and either 619.08(e) or 619.08(i), and painted in accordance with 619.09(a), from the face of concrete encasement to opposite face of concrete encasement.
619.14 Handling of Steel Bridge Superstructure to be Removed If the Contractor elects to take ownershi p of the steel in accordance with 202.03,
a QCP shall be submitted in accordance with 619.03. Th e entire surface area of the steel shall be cleaned in accordance with 619.08(d) prior to the steel leaving the construction limits and becoming the property of the Contractor. Mill scale shall be 680 assumed to be present on the existing steel . Cleaning in accordance with 619.08(a) shall not be performed. A level of containment in accordance with 619.07(a) shall be used. Testing of the waste stream and disposal of the waste produced by this cleaning shall be in accordance with 619.07.
619.15 Drain Castings Treatment Roadway drain castings located in a bridge deck shall be satisfactorily cleaned in 619.13
557 accordance with 619.08(c) or 619.08(g). The castings shall not be shot-blasted. 690 The roadway drain castings shall be painted with a black finish coat in accordance with 909.02(c). If a roadway drain casting extension pipe is damaged or missing, it shall be replaced. The extension pipe shall be in accordance with 715.
619.16 Clean and Paint Bearing Assemblies
When shown on the plans or a pay item is included in the schedule of pay items, all bearing assemblies including top and bottom plates of each assembly shall be 700 cleaned in accordance with 619.08(a) and 619.08(d). Pollution control shall be in accordance with 619.07. If the pay item clean and paint bearing asse mblies is listed in the schedule of pay items for a particular structure, the entire bearing assembly shall be painted with the structural steel paint system in accordance with 619.09(a). If the pay item, paint steel bridge, or paint steel bridge, partial, is listed in the schedule of pay items for a particular stru cture, the entire bearin g assembly shall be painted with the structural steel paint system that is being used on the rest of the bridge. 710
619.16.1 Clean and Paint Steel Piling
All exposed steel piling shall be cleaned in accordance with 619.08(a) and either 619.08(e) or 619.08(i). The structural steel paint system in accordance with 619.09(a) shall be applied. The color of the top coat shall be SAE-AMS-STD-595, color No. 13711. 619.17 Responsibility for Damage Unless otherwise specified by the Engineer in writing, full containment shall be provided when performing the surface prepar ation operation and when applying all 720 coats of paint, except primer coats, with spray equipment. All persons and property shall be protected from damage or injury from the surface preparation operations and painting operations by providing containment as described in the QCP. Persons and property shall include, but not be limited to, pedestrians, vehicles, and other traffic upon or underneath a bridge, all portions of th e bridge superstructure and substructure, and all adjacent property. The Contractor shall be responsible for damages in accordance with 107.17.
619.18 Top of Top Flange of Steel Structural Members
When shown on the plans or a pay item is included in the schedule of pay items, 730 the top of the top flange of steel structur al members shall be cleaned in accordance with 619.08 by a contractor certified as SSPC-QP 2. The Contractor shall assume the existing coating on the top of the top flange contains hazardous materials and mill scale and shall use pollution control and containment in accordance with 619.07(b)1. A QCP shall be prepared and submitted in accordance with 619.03. The steel shall be 619.18 558 cleaned to a level of cleanlin ess in accordance with 619.08(e) or 619.08(h), however solvent cleaning in accordance with 619.08(a) shall not be performed. Each bridge shall generate a separate waste stream and shall not be commingled with other materials. The waste stream sh all be sampled in accordance with 619.07 740 and all other requirements of 619.07 shall be followed. Once the result from the waste stream sampling is known and the waste st ream is appropriately characterized as hazardous or non-hazardous, all waste sha ll be disposed of in accordance with 619.07(b).
619.19 Method of Measurement
Cleaning and painting of steel structural members, cleaning the top of the top flange of steel structural members, clean ing and painting of bearing assemblies, and cleaning and painting of steel piling will not be measured for payment. Cleaning areas around bridge joints and other areas with visible corrosion pitting a second time will 750 not be measured for payment. Disposal of the waste generated by the cleaning operation will not be measured for payment. Cleaning roadway drain castings, caulking joints of lapping members, and caulking on weathering steel will not be measured for payment. For steel that will become the property of the Contractor, cleaning existing steel, removal of mill scale, testing, disposal of the waste, containment, and all other items involved with this work will not be measured as per 202.13. 760 If a structure is shown in the contract documents as being built before 1995, no measurement will be made of the area covered by mill scale. Otherwise, the area of structural steel covered by mill scale wi ll be measured for payment after a proper cleaning of the entire containment area or an agreed large portion thereof and removing all other existing materials, including all paint and rust. The percentage of the area of structural steel covered by existing mill scale will be representative of this entire area. The pre-established remedies for this changed condition apply in accordance with 104.02(d) and 619.20. Roadway drain casting extension pipe will be measured in accordance with 770 715.13. The estimated weight, length, number of steel spans, surface area of steel, and type of primer shown on the plans or in the Proposal is incidental information. Such information is approximate only. The Department will not guarantee its accuracy. 619.20 Basis of Payment Existing steel bridges to be cleaned, or partially cleaned, whichever is specified, will be paid for at the contract lump sum price for clean steel bridge or clean steel bridge, partial, at the bridge number specified. Cleaning the top of the top flange of 780 existing steel bridges will be paid for at the contract lump sum price for clean steel 619.19 559 bridge, top flanges, at the bridge number spec ified. Existing steel bridges to be painted, or partially painted, whichever is specified, will be paid for at the contract lump sum price for paint steel bridge or paint steel bridge, partial, at the bridge number specified. When specified as a separate pay ite m in the contract, cleaning and painting bearing assemblies will be paid for at the contract lump sum price for clean and paint bearing assemblies, at the bridge number specified. When specified as a separate pay item in the contract, cleaning and painting steel 790 piling will be paid for at the contract lump sum price for clean and paint steel piling, at the bridge number specified. (a) Pre-Established Remedies for Changed Conditions