Kansas Department of Transportation (KDOT) · KDOT Standard Specifications for Road & Bridge Construction
Section 1207 — Warm Mix Asphalt Additives
Kansas KDOT Standard Specifications for Road & Bridge Construction, Section 1207. Full text, cross-references and related pay items on BuildSpec.
1207 – WARM MIX ASPHALT ADDITIVES 1200 - 13 SECTION 1207 WARM MIX ASPHALT ADDITIVES 1207.1 DESCRIPTION This specification covers Warm Mix Asphalt (WMA) additives and processes. 1207.2 REQUIREMENTS Provide prequalified WMA additives or processes. 1207.3 TEST METHODS WMA additives and processes will be tested and evaluated by the Texas Department of Transportation following the procedures outlined in subsection 1207.4. 1207.4 PREQUALIFICATION Obtain prequalification procedures by writing to the Texas Department of Transportation, Director of Construction and Maintenance, 125 East 11 th Street,…
The rest of Section 1207 — Warm Mix Asphalt Additives is for members
You're reading the opening of Section 1207 — Warm Mix Asphalt Additives. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products
- Ask Copilot about this section, with citations