1908 - POLYETHYLENE (PE) PIPE 1900-13
1908.1 Description
This specification covers polyethylene pipe for storm sewers and culverts.
1908.2 Requirements
a. Polyethylene Pipe. Provide polyethylene (PE) pipe for stor m sewers and culverts that complies with one of the following:
1908.3 Test Methods
Test materials in accordance with th e AASHTO and ASTM standards cited in subsection 1908.2. 1908 - POLYETHYLENE (PE) PIPE 1900-14
1908.4 Prequalification
Follow the instructions on the AASHTO National Transportation Product Evaluation Program’s (NTPEP) website to participate in the audit program for polyethylene (PE) pipe plants. Forward an official copy of the initial (and latest) NTPEP audit report to the Bureau Chief of Construction and Materials for evaluation. Include copies of the most recent six months of quality control test results. In order to maintain prequalified status, send a copy of the annual NTPEP certificate of compliance as soon as it is received. Plants that have been removed from the NTPEP website listing will be removed from prequalified status. Plants that fail to provide the annual certificate of compliance or are no longer in compliance with the audit requirements may be removed from prequalified status.
1908.5 Basis of Acceptance
Prequalification as specified in subsection 1908.4. Receipt and approval of a Type C certification as specified in DIVISION 2600. Visual inspection for condition and dimensional requirements. Successful testing with a mandrel as outlined in subsection 817.3b.
Get an email when 1908 changes
Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.