Section 201 — Clearing and Grubbing
Kansas KDOT Standard Specifications for Road & Bridge Construction, Section 201. Full text, cross-references and related pay items on BuildSpec.
201 CLEARING AND GRUBBING 201.1 DESCRIPTION Clear and grub the vegetation and debris as specified in the Contract Documents. DO NOT clear and grub areas unless work will actively be performed in the exposed area (or portions of the exposed area) within 7 calendar days on exposed steep slope areas (40% or greater) or within 14 calendar days for all other exposed areas. B I D I T E M U N I T S Clearing and Grubbing Lump Sum 201.2 MATERIALS Backfill stump holes using granular material or loose friable soil from the project. Use material that is free of excess moisture, frozen lumps, roots, sod,…
The rest of Section 201 — Clearing and Grubbing is for members
You're reading the opening of Section 201 — Clearing and Grubbing. Members see the complete text, every cross-reference and the tools on this page — free for 14 days, no card required.
- Complete section text with subsections and tables
- Search across every state DOT standard specification
- Prior editions and related products