Division 200 — Stabilized Subgrade, Base and Shoulders

209Special Fill

KS · 2015 Standard Specifications✓ Full text on BuildSpecBook pages 139–139 Save this section

Ask about Section 209

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

209.1 Description

Provide and place special fill (foundati on) for the foundation for the MSE sy stem as shown in the Contract Documents. Provide and place special fill (retain ed soil) behind the MSE wall as shown in the Contract Documents. BID ITEMS UNITS Special Fill (*) Cubic Yard * Foundation or Retained Soil

209.2 Materials

a. General. Provide soil meeting the requirements specified in the Contract Documents. Material will be accepted under this specification with the receipt and approval by the KDOT Geotechnical Unit of laboratory test reports detailing the test results in accordance with the appr opriate ASTM standards as performed by an AMRL certified and KDOT Geotechnical Unit approved laboratory. Use soil for the special fill exhibiting a minimum drained friction angle and minimum undrained cohesion, as shown on the plans. Determine the strength properties of the soil in CIŪ single stage triaxial tests with pore pressure measurements (ASTM D 4767) if the soil is defined as fine grained by ASTM D 2487. If the soil is fine-grained, it must be of low plasticity as defined by ASTM D 2487. Use effective consolidation stresses as shown on the plans. Multi-stage tests will not be acceptable. If the soil is a coarse-grained soil as defined by ASTM D 2487, it must be classed as low plasticity. Determine the strength properties of the soil in Consolidated - Drained Direct Shear (ASTM D 3080) testing. These soils similarly must exhibit a minimum drained friction angle as shown on the plans. Do not use these soils in areas prone to flooding. Use normal stresses as shown on the plans. b. Shear Testing. Perform all shear testing on samples co mpacted to Type AA compaction standards (SECTION 205) for cohesive soils; or at 75% Relative Density for granular soils at optimum moisture content.

209.3 Construction Requirements

Compact the fill to Type AA, MR-3-3 ( SECTION 205) unless specified otherwise in the Contract Documents. Do not exceed 8-inch loose, lift thickness. Each lift will have a minimum of 2 density and moisture tests performed. Fill material different from that specifically approved for us e will not be accepted until the testing requirements as set forth in subsection 209.2 are met.

209.40 Measurement and Payment

The Engineer will measure the special fill by the cubic yard. Payment for "Special Fill" at the contract unit price is full compensation for the specified work.

Get an email when 209 changes

Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for State Road and Bridge Construction, 2015 Edition. Pages 139–139 of 978. View official source ↗

Ask about this section

Scoped to Kansas KDOT Standard Specifications for Road & Bridge Construction, Section 209 — Special Fill. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.