304Crushed Stone Subgrade

KS · 2015 Standard Specifications✓ Full text on BuildSpecBook pages 158–158 Save this section

Ask about Section 304

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

304.1 Description

Construct a uniform crushed stone subgrade as backfill in cut sections or as topping of fill sections as shown in the Contract Documents. B I D I T E M S U N I T S Crushed Stone Subgrade (*) Square Yard Water (Crushed Stone Subgrade) (Set Price) M Gallon *Thickness

304.2 Materials

Provide materials that comply w ith the applicable requirements. Aggregates for Backfill ......................................................................................... DIVISION 1100 Water for Crushed Stone Subgrade ....................................................................... DIVISION 2400

304.3 Construction Requirements

Prepare the cut or fill section for the crushed st one subgrade by scarifying, watering, blading and compacting to the specified lines and grades. Do not place crushed stone subgrade on frozen subgrade. The Engineer will obtain a sample of the crushed stone for backfill from materials stockpiled at the project site, and submit to MRC where the relative density will be determined using KT-69. Allow 48 hours for testing by the MRC. Uniformly mix the crushed stone with a sufficient qu antity of water to provide satisfactory compaction. The mixing methods are:  Central Plant Method. Use a stationary mechanical mixing plant to mix the water and aggregate.  Road Mix Method. After the aggr egate is placed in a uniform windr ow, use a motor grader, or other equipment approved by the Engineer, to mix the water and the aggregate. Spread and compact the crushed stone subgrade as specified in the Contract Documents. If the thickness is greater than 6 inches, spread and compact the crushed st one subgrade in multiple lifts of equal thickness with a maximum lift thickness of 6 inches. Compact the crushed stone subgrade to a uniform density, a minimum of 70% of the relative density. The Engineer will verify the relative density using a nuclear gauge (KT-41). If during production, the gradation changes ±10% from the single point designation on any single sieve, cease spreading and compaction operations. The Engineer will obtain a new sample for relative density, submit sample to the MRC and a new relative density value will be established.

304.4 Measurement and Payment

The Engineer will measure crushed st one subgrade by the square yard. The Engineer will measure water used for crushed st one subgrade by the M Gallon using calibrated tanks or water meters. The Engineer will measure water us ed for subgrade preparation, mixing and compacting the crushed stone subgrade. The Engineer will not measure water used for dust control, water wasted through the Contractor’s negligence or water in excess of the quantity required for mixing and compacting the crushed stone subgrade. Payment for "Crushed Stone Subgrade" at the contr act unit price and "Water (Crushed Stone Subgrade) (Set Price)" at the contract set unit price is full compensation for the specified work.

Get an email when 304 changes

Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for State Road and Bridge Construction, 2015 Edition. Pages 158–158 of 978. View official source ↗

Ask about this section

Scoped to Kansas KDOT Standard Specifications for Road & Bridge Construction, Section 304 — Crushed Stone Subgrade. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.