837 - PAVEMENT WIDENING, SHOULDERING AND PAVEMENT EDGE WEDGE FOR HMA OVERLAY PROJECTS 800-97 PAVEMENT WIDENING, SHOULDERING AND PAVEMENT EDGE WEDGE
837.1 Description
Widen the existing pavement, construct shoulders or construct the transition from the pavement edge to the ditch as shown in the Contract Documents. BID ITEMS UNITS Shoulders (Earth) (HMA Widening) Station Shoulders (Aggregate) (HMA Widening) Station Pavement Edge Wedge (Earth) Station Pavement Edge Wedge (Rock) Ton Aggregate for Shoulders (AS-1) Ton Common Excavation (Contractor-Furnished) Cubic Yard Water for Earthwork Compaction (Set Price) M Gallon
837.2 Materials
a. Material for Earth Shoulders and Pavement Edge Wedge (Earth). Use earthen material obtained from the locations shown in the Contract Documents. Do not use material containing roots, sod and other perishable and deleterious matter. When required, provide Contractor-Furnished earthen material that complies with Contractor-Furnished Common Excavation, SECTION 205. Earthen material will be accepted by the Engineer on the basis of visual inspection at the point of usage. b. Material for Aggregate Shoulders and Pavement Edge Wedge (Aggregate). Use existing aggregate that is free of roots, sod and other perishable and deleterious matter. If the project does not have existing aggregate for reuse, or if additional material is required, provide aggregate that complies with aggregate for shoulder construction (AS-1), DIVISION 1100. The Engineer will accept this material on the basi s of visual inspection at the point of usage. c. Water for Earthwork Compaction. Provide water that complies with DIVISION 2400. d. HMA Materials. Provide the designated HMA that complies with DIVISION 600.
837.3 Construction Requirements
a. Excavation for HM A Pavement Widening. Excavate along the edge of the existing pavement to the depth and width shown in the Contract Documents. Compact the bottom of the trench according to Type B (MR-90) compaction, SECTION 205 . If material unsuitable for proper compaction is encountered in the bottom of the trench, remove the unsuitable material and replace it with suitable earthen material. Dispose of the unsuitable material by scattering it at locations on the right-of-way as directed by the Engineer. Before placing any HMA material in the tren ch, clean the trench of all loose material. Provide for drainage of the trench, as necessary. b. Placing the Asphalt Material Pavement Widening.
837.4 Measurement and Payment
The Engineer will measure shoulder for asphalt widenings on each side of the roadway by the station. The excavation for the asphalt widenings is not meas ured for separate payment. The HMA quantities for the HMA widenings are included in the roadway surfacing quantities. The Engineer will measure earth pavement edge wedg e on each side of the roadway by the station. The Engineer will measure the aggregate pavement edge wedge by the ton. The Engineer will measure the ag gregate for shoulders by the ton. The Engineer will measure Contractor-furnished common excavation according to SECTION 205. The Engineer will measure water for earthwork compaction according to SECTION 205. Payment for "Shoulders (Earth) (HMA Widening)", "Shoulders (Aggregate) (HMA Widening)", "Pavement Edge Wedge (Earth)", "Pavement Edge Wedge (Rock)", "Aggregate for Shoulders (AS-1)" and "Common Excavation (Contractor-Furnished)" at the contract unit pr ices, and for "Water for Ea rthwork Compaction" at the contract unit set price is full compensation for the specified work.