858 – BRIDGE APPROACH SLAB FOOTING 800-132
858.1 Description
Construct bridge approach slab footings at the locations designated in the Contract Documents. B I D I T E M U N I T S Bridge Approach Slab Footing Cubic Yard
858.2 Materials
Provide materials that comply w ith the applicable requirements. Concrete and Grout ............................................................................................... SECTIONS 401 & 402 Aggregates for Concrete Not On Grade ................................................................ SECTION 1102 Reinforcing Steel .................................................................................................... DIVISION 1600 Concrete Curing Materials ..................................................................................... DIVISION 1400
858.3 Construction Requirements
Excavate to the neat lines shown in the Contract Documents. Place reinforcing steel at the locations shown in the Contract Documents. Use a sufficient number of approved metal bar chairs and secure to prevent displacement during concrete placement. Place and cure the concrete accord ing to the Contract Documents and according to DIVISION 700.
858.4 Measurement and Payment
The Engineer will measure the bridge approach slab footing by the cubic yard to the neat lines shown in the Contract Documents. Payment for "Bridge Approach Slab Footing" at the contract unit price is full compensation for the specified work.