859 – INTELLIGENT TRAN SPORTATION SYSTEM (ITS) 800-133
859.1 Description
Install Intelligent Transportation System (ITS) in cluding KDOT supplied materials as shown in the Contract Documents. BID ITEM UNITS Intelligent Transportation System Lump Sum
859.2 Materials
a. Provide the specified materials that comply with the materials’ divisions (SECTION 1000 – 2500). For concrete foundations, use Grade 3.0 concrete that complies with SECTIONS 401, 402 and 1102, and steel reinforcement that complies with DIVISION 1600, unless shown otherwise in the Contract Documents. b. ITS. Provide and install all materials necessary for th e complete and satisfactory operation of the ITS whether specifically mentioned or not. Provide material that is new, the best standard product of a manufacturer regularly engaged in the production of this type of material, the manufacturer’s latest approved design and of best quality and workmanship.
859.3 Construction Requirements
a. Codes and Regulations. Perform all ITS work according to: National Electric Code. National Electric Safety Code. Rural Utility Service (RUS). Illumination Engineers Society (IES). Standards of the American Society for Testing and Materials (ASTM). American Association of State Highway and Transportation Officials (AASHTO). Regulations of the National Board of Fire Underwriters. Local ordinances. KDOT Utility Accommodation Policy Details in the Contract Documents. Whenever reference is made to any of the standards mentioned, the reference shall be considered to mean the code, ordinance, or standard that is in effect at the time of the bid advertisement. b. General. Provide and install all incidental parts not shown in the Contract Documents which are necessary to complete the ITS system or modify existing systems as shown in the Contract Documents. All utility hookups and utility transformers are subsidiary. c. Removals and Excavations. Perform removals of existing structures and excavations to minimize damage to existing structures and right-of-way. Limit the excavation for the conduits, foundations and other appliances to that necessary for the installation of the materials. Do not excavate until immediately before installing the materials. Place excavated material where the least damage and ob struction to vehicles and pedestrian traffic will occur. Do not impede surface drainage. Assume ownership and dispose of removed concrete and soil off of the right of way. At the end of each day’s work and at all times when construction operations are suspended, remove all equipment and other obstructions from the portion of the roadway open for use by public traffic. 859 – INTELLIGENT TRAN SPORTATION SYSTEM (ITS) 800-134 d. Backfill. Place the backfill material in uniform layers (maximum 6 inches compacted) evenly on all sides of the structure. Compact the backfill using pneumatic tampers, vibratory compactors or other equipment approved by the Engineer. Compact the backfill to comply with the Contract Documents. If backfill requirements are not specified, compact each layer until no further consolidation is observed. Remove surplus excavated material, including concrete and soil from the project and dispose on sites approved by the Engineer or assume ownership and dispose of off of the right of way. Reseed and mulch the areas disturbed by the excavations. Hand seeding methods may be used. Do not use cinders, broken concrete, broken rock or other hard or undesirable material for backfilling. e. Replacing Damaged Improvements. Replace all sidewalks, curbs, gutters, pavements and other improvements removed or damaged during installations of the Intelligent Transpor tation System. Replace or reconstruct the removed or damaged improvements with the same type and quality of materials originally used. If part of an existing slab of concrete pavement or square of sidewalk is removed or damaged, replace the entire slab or square. Replace damaged improvements as soon as practicable. Completely repair the ditch and replace the disturbed aggregate ditch liner if co nstruction activities disturb any aggregate ditch. Do not let rocks or aggregate fall into the trench prior to backfill. f. Foundations.
859.4 Measurement and Payment
The Engineer will measure the Intelligent Transportation System by the Lump Sum. All utility hookups, utility transformers, excavation, b ackfilling, Grade 3.0 concrete and testing for the Intelligent Transportation System are subsidiary. Payment for "Intelligent Transportation System" at the contract unit price is full compensation for the specified work.