910 - SOIL COMPOST 900-24

910.1 Description

Incorporate compost into the soil as designated in the Contract Documents.

910.2 Materials

Provide compost that complies with DIVISION 2100.

910.3 Construction Requirements

Before incorporating the compost into areas that will be seeded, sodded or planted, thoroughly rototill the areas to a depth of 6 inches. Spread a layer (1 ¼ ± ⅛ inch thick) of compost uniformly over the rototilled soil. Use a rototiller to mix the compost and soil to a depth of 6 inches. Fine grade the mixture by raking or dragging to eliminate high spots and low spots. Lightly roll or otherwise compact the soil surface. Mix compost with the backfill material for all plants. Mix 1 part compost with 5 parts soil (by volume) from the planting hole.

910.4 Measurement and Payment

The Engineer will not measure the specified work for separate payment.

Get an email when 910 changes

Kansas revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for State Road and Bridge Construction, 2015 Edition. Pages 653–653 of 978. View official source ↗

Ask about this section

Scoped to Kansas KDOT Standard Specifications for Road & Bridge Construction, Section 910 — Soil Compost. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.