Temporary Traffic Control
713.01 DESCRIPTION. Furnish, install, maintain, and remove
temporary construction barricades, precast concrete barriers, lights, signals, pavement markings, and signs; provide flaggers; and comply with all other requirements regarding the prote ction of the work, workers, and safety of the public. Unless otherwise noted in the plans or special provisions, this work also provides for traffic control management in compliance with the Manual On Uniform Traffic Control Devices (MUTCD), including the installation, inspection, maintenance, and removal of all traffic control devices relative to work on the project. Signs, barricades, barriers, channelizing devices, pavement markings, or any other temporary traffic control measures shall comply with pla n details, Temporary Traffic Control Standards , the MUTCD, and these specifications. Signs, barricades, barriers, channelizing devices, pavement markings, and arrangements thereof, as shown on the plans, are minimum requirements. Furnish and install appro priate signs for special conditions as directed. Requirements for proper signs, barricades, barriers, channelizing devices, or other safety precautions promulgated by the contractor ’s insurers are not negated by these specifications. These specifications shall not be construed to relieve the contractor of responsibilities for the safety of the public, for liability in connection therewith, or compliance with state and local laws or ordinances. Assign one or more authorized Traffic Control Supervisors (TCS) to provide traffic control management for the project. If assigning more than one TCS, then submit a weekly schedule identifying who will be in charge of providing traffic control management on a daily basis to the engineer. The TCS shall have a set of all contract documents relating to traffic control (and traffic staging if applicable), a current copy of the MUTCD, and a current copy of Temporary Traffic Control Standards readily available at all times. If a subcontractor provides traffic contro l management, the subcontractor’s TCS shall meet all the requirements set forth herein. The contractor may assign one or more Traffic Control Technicians (TCT) to assist the TCS in inspection and maintenance of Traffic Control Devices.
713.02 MATERIALS. Materials for temporary signs, barricades,
barriers, and related devices shall comply with the following sections and subsections: Portland Cement Concrete Section 901 Reinforcing Steel 1009.01 Backing Material 1015.04.2 Reflective Sheeting 1015.05 Temporary Pavement Markings 1015.08 Raised Pavement Markers & Adhesive 1015.09 Thermoplastic Pavement Markings 1015.10 Traffic Paint 1015.12 Barricade Warning Lights 1018.13
713.02.1 Temporary Pavement Markings : Temporary pavement
markings shall be a minimum of 4 inches wide.
713.02.2 Reflective Sheeting : Reflective sheeting requirements
for temporary signs, barricades, channelizing devices, drums, and cones shall comply with the following:
713.02.2 1 Temporary Signs and Barricades : On the
mainline of freeways and expressways, fabricate the initial advanced warning construction sign using DOTD Type X (Fluorescent Orange) reflective sheeting. Reflective sheeting for all other temporary signs and barricades shall comply with the requirements of ASTM D 4956, Type III.
713.02.2 2 Vertical Panels : Reflective sheeting for vertical
panels used to channelize or divide traffic shall meet the requirements of ASTM D 4956, Type III.
713.02.2 3 Drums and Supercones : Reflective sheeting for
drums and supercones shall meet the requirements of AS TM D 4956, Type III, and the Supplementary Requirement S2 for Reboundable Sheeting as specified in 1015.05.6 .
713.02.2 4 Traffic Cones : Reflective sheeting for traffic cones
shall meet the requirements of ASTM D4956, Type III or VI.
713.03 FABRICATION. Fabricate temporary signs, barricades, and
related devices according to 729.04 . Label back of signs with name of
713.02 MATERIALS. Materials for temporary signs, barricades,
barriers, and related devices shall comply with the following sections and subsections: Portland Cement Concrete Section 901 Reinforcing Steel 1009.01 Backing Material 1015.04.2 Reflective Sheeting 1015.05 Temporary Pavement Markings 1015.08 Raised Pavement Markers & Adhesive 1015.09 Thermoplastic Pavement Markings 1015.10 Traffic Paint 1015.12 Barricade Warning Lights 1018.13
713.02.1 Temporary Pavement Markings : Temporary pavement
markings shall be a minimum of 4 inches wide.
713.02.2 Reflective Sheeting : Reflective sheeting requirements
for temporary signs, barricades, channelizing devices, drums, and cones shall comply with the following:
713.02.2 1 Temporary Signs and Barricades : On the
mainline of freeways and expressways, fabricate the initial advanced warning construction sign using DOTD Type X (Fluorescent Orange) reflective sheeting. Reflective sheeting for all other temporary signs and barricades shall comply with the requirements of ASTM D 4956, Type III.
713.02.2 2 Vertical Panels : Reflective sheeting for vertical
panels used to channelize or divide traffic shall meet the requirements of ASTM D 4956, Type III.
713.02.2 3 Drums and Supercones : Reflective sheeting for
drums and supercones shall meet the requirements of AS TM D 4956, Type III, and the Supplementary Requirement S2 for Reboundable Sheeting as specified in 1015.05.6 .
713.02.2 4 Traffic Cones : Reflective sheeting for traffic cones
shall meet the requirements of ASTM D4956, Type III or VI.
713.03 FABRICATION. Fabricate temporary signs, barricades, and
related devices according to 729.04 . Label back of signs with name of
713.02 MATERIALS. Materials for temporary signs, barricades,
barriers, and related devices shall comply with the following sections and subsections: Portland Cement Concrete Section 901 Reinforcing Steel 1009.01 Backing Material 1015.04.2 Reflective Sheeting 1015.05 Temporary Pavement Markings 1015.08 Raised Pavement Markers & Adhesive 1015.09 Thermoplastic Pavement Markings 1015.10 Traffic Paint 1015.12 Barricade Warning Lights 1018.13
713.02.1 Temporary Pavement Markings : Temporary pavement
markings shall be a minimum of 4 inches wide.
713.02.2 Reflective Sheeting : Reflective sheeting requirements
for temporary signs, barricades, channelizing devices, drums, and cones shall comply with the following:
713.02.2 1 Temporary Signs and Barricades : On the
mainline of freeways and expressways, fabricate the initial advanced warning construction sign using DOTD Type X (Fluorescent Orange) reflective sheeting. Reflective sheeting for all other temporary signs and barricades shall comply with the requirements of ASTM D 4956, Type III.
713.02.2 2 Vertical Panels : Reflective sheeting for vertical
panels used to channelize or divide traffic shall meet the requirements of ASTM D 4956, Type III.
713.02.2 3 Drums and Supercones : Reflective sheeting for
drums and supercones shall meet the requirements of AS TM D 4956, Type III, and the Supplementary Requirement S2 for Reboundable Sheeting as specified in 1015.05.6 .
713.02.2 4 Traffic Cones : Reflective sheeting for traffic cones
shall meet the requirements of ASTM D4956, Type III or VI.
713.03 FABRICATION. Fabricate temporary signs, barricades, and
related devices according to 729.04 . Label back of signs with name of
713.02 MATERIALS. Materials for temporary signs, barricades,
barriers, and related devices shall comply with the following sections and subsections: Portland Cement Concrete Section 901 Reinforcing Steel 1009.01 Backing Material 1015.04.2 Reflective Sheeting 1015.05 Temporary Pavement Markings 1015.08 Raised Pavement Markers & Adhesive 1015.09 Thermoplastic Pavement Markings 1015.10 Traffic Paint 1015.12 Barricade Warning Lights 1018.13
713.02.1 Temporary Pavement Markings : Temporary pavement
markings shall be a minimum of 4 inches wide.
713.02.2 Reflective Sheeting : Reflective sheeting requirements
for temporary signs, barricades, channelizing devices, drums, and cones shall comply with the following:
713.02.2 1 Temporary Signs and Barricades : On the
mainline of freeways and expressways, fabricate the initial advanced warning construction sign using DOTD Type X (Fluorescent Orange) reflective sheeting. Reflective sheeting for all other temporary signs and barricades shall comply with the requirements of ASTM D 4956, Type III.
713.02.2 2 Vertical Panels : Reflective sheeting for vertical
panels used to channelize or divide traffic shall meet the requirements of ASTM D 4956, Type III.
713.02.2 3 Drums and Supercones : Reflective sheeting for
drums and supercones shall meet the requirements of AS TM D 4956, Type III, and the Supplementary Requirement S2 for Reboundable Sheeting as specified in 1015.05.6 .
713.02.2 4 Traffic Cones : Reflective sheeting for traffic cones
shall meet the requirements of ASTM D4956, Type III or VI.
713.03 FABRICATION. Fabricate temporary signs, barricades, and
related devices according to 729.04 . Label back of signs with name of
713.02 MATERIALS. Materials for temporary signs, barricades,
barriers, and related devices shall comply with the following sections and subsections: Portland Cement Concrete Section 901 Reinforcing Steel 1009.01 Backing Material 1015.04.2 Reflective Sheeting 1015.05 Temporary Pavement Markings 1015.08 Raised Pavement Markers & Adhesive 1015.09 Thermoplastic Pavement Markings 1015.10 Traffic Paint 1015.12 Barricade Warning Lights 1018.13
713.02.1 Temporary Pavement Markings : Temporary pavement
markings shall be a minimum of 4 inches wide.
713.02.2 Reflective Sheeting : Reflective sheeting requirements
for temporary signs, barricades, channelizing devices, drums, and cones shall comply with the following:
713.02.2 1 Temporary Signs and Barricades : On the
mainline of freeways and expressways, fabricate the initial advanced warning construction sign using DOTD Type X (Fluorescent Orange) reflective sheeting. Reflective sheeting for all other temporary signs and barricades shall comply with the requirements of ASTM D 4956, Type III.
713.02.2 2 Vertical Panels : Reflective sheeting for vertical
panels used to channelize or divide traffic shall meet the requirements of ASTM D 4956, Type III.
713.02.2 3 Drums and Supercones : Reflective sheeting for
drums and supercones shall meet the requirements of AS TM D 4956, Type III, and the Supplementary Requirement S2 for Reboundable Sheeting as specified in 1015.05.6 .
713.02.2 4 Traffic Cones : Reflective sheeting for traffic cones
shall meet the requirements of ASTM D4956, Type III or VI.
713.03 FABRICATION. Fabricate temporary signs, barricades, and
related devices according to 729.04 . Label back of signs with name of
713.02 MATERIALS. Materials for temporary signs, barricades,
barriers, and related devices shall comply with the following sections and subsections: Portland Cement Concrete Section 901 Reinforcing Steel 1009.01 Backing Material 1015.04.2 Reflective Sheeting 1015.05 Temporary Pavement Markings 1015.08 Raised Pavement Markers & Adhesive 1015.09 Thermoplastic Pavement Markings 1015.10 Traffic Paint 1015.12 Barricade Warning Lights 1018.13
713.02.1 Temporary Pavement Markings : Temporary pavement
markings shall be a minimum of 4 inches wide.
713.02.2 Reflective Sheeting : Reflective sheeting requirements
for temporary signs, barricades, channelizing devices, drums, and cones shall comply with the following:
713.02.2 1 Temporary Signs and Barricades : On the
mainline of freeways and expressways, fabricate the initial advanced warning construction sign using DOTD Type X (Fluorescent Orange) reflective sheeting. Reflective sheeting for all other temporary signs and barricades shall comply with the requirements of ASTM D 4956, Type III.
713.02.2 2 Vertical Panels : Reflective sheeting for vertical
panels used to channelize or divide traffic shall meet the requirements of ASTM D 4956, Type III.
713.02.2 3 Drums and Supercones : Reflective sheeting for
drums and supercones shall meet the requirements of AS TM D 4956, Type III, and the Supplementary Requirement S2 for Reboundable Sheeting as specified in 1015.05.6 .
713.02.2 4 Traffic Cones : Reflective sheeting for traffic cones
shall meet the requirements of ASTM D4956, Type III or VI.
713.03 FABRICATION. Fabricate temporary signs, barricades, and
related devices according to 729.04 . Label back of signs with name of
713.02 MATERIALS. Materials for temporary signs, barricades,
barriers, and related devices shall comply with the following sections and subsections: Portland Cement Concrete Section 901 Reinforcing Steel 1009.01 Backing Material 1015.04.2 Reflective Sheeting 1015.05 Temporary Pavement Markings 1015.08 Raised Pavement Markers & Adhesive 1015.09 Thermoplastic Pavement Markings 1015.10 Traffic Paint 1015.12 Barricade Warning Lights 1018.13
713.02.1 Temporary Pavement Markings : Temporary pavement
markings shall be a minimum of 4 inches wide.
713.02.2 Reflective Sheeting : Reflective sheeting requirements
for temporary signs, barricades, channelizing devices, drums, and cones shall comply with the following:
713.02.2 1 Temporary Signs and Barricades : On the
mainline of freeways and expressways, fabricate the initial advanced warning construction sign using DOTD Type X (Fluorescent Orange) reflective sheeting. Reflective sheeting for all other temporary signs and barricades shall comply with the requirements of ASTM D 4956, Type III.
713.02.2 2 Vertical Panels : Reflective sheeting for vertical
panels used to channelize or divide traffic shall meet the requirements of ASTM D 4956, Type III.
713.02.2 3 Drums and Supercones : Reflective sheeting for
drums and supercones shall meet the requirements of AS TM D 4956, Type III, and the Supplementary Requirement S2 for Reboundable Sheeting as specified in 1015.05.6 .
713.02.2 4 Traffic Cones : Reflective sheeting for traffic cones
shall meet the requirements of ASTM D4956, Type III or VI.
713.03 FABRICATION. Fabricate temporary signs, barricades, and
related devices according to 729.04 . Label back of signs with name of
713.02 MATERIALS. Materials for temporary signs, barricades,
barriers, and related devices shall comply with the following sections and subsections: Portland Cement Concrete Section 901 Reinforcing Steel 1009.01 Backing Material 1015.04.2 Reflective Sheeting 1015.05 Temporary Pavement Markings 1015.08 Raised Pavement Markers & Adhesive 1015.09 Thermoplastic Pavement Markings 1015.10 Traffic Paint 1015.12 Barricade Warning Lights 1018.13
713.02.1 Temporary Pavement Markings : Temporary pavement
markings shall be a minimum of 4 inches wide.
713.02.2 Reflective Sheeting : Reflective sheeting requirements
for temporary signs, barricades, channelizing devices, drums, and cones shall comply with the following:
713.02.2 1 Temporary Signs and Barricades : On the
mainline of freeways and expressways, fabricate the initial advanced warning construction sign using DOTD Type X (Fluorescent Orange) reflective sheeting. Reflective sheeting for all other temporary signs and barricades shall comply with the requirements of ASTM D 4956, Type III.
713.02.2 2 Vertical Panels : Reflective sheeting for vertical
panels used to channelize or divide traffic shall meet the requirements of ASTM D 4956, Type III.
713.02.2 3 Drums and Supercones : Reflective sheeting for
drums and supercones shall meet the requirements of AS TM D 4956, Type III, and the Supplementary Requirement S2 for Reboundable Sheeting as specified in 1015.05.6 .
713.02.2 4 Traffic Cones : Reflective sheeting for traffic cones
shall meet the requirements of ASTM D4956, Type III or VI.
713.03 FABRICATION. Fabricate temporary signs, barricades, and
related devices according to 729.04 . Label back of signs with name of
713.02 MATERIALS. Materials for temporary signs, barricades,
barriers, and related devices shall comply with the following sections and subsections: Portland Cement Concrete Section 901 Reinforcing Steel 1009.01 Backing Material 1015.04.2 Reflective Sheeting 1015.05 Temporary Pavement Markings 1015.08 Raised Pavement Markers & Adhesive 1015.09 Thermoplastic Pavement Markings 1015.10 Traffic Paint 1015.12 Barricade Warning Lights 1018.13
713.02.1 Temporary Pavement Markings : Temporary pavement
markings shall be a minimum of 4 inches wide.
713.02.2 Reflective Sheeting : Reflective sheeting requirements
for temporary signs, barricades, channelizing devices, drums, and cones shall comply with the following:
713.02.2 1 Temporary Signs and Barricades : On the
mainline of freeways and expressways, fabricate the initial advanced warning construction sign using DOTD Type X (Fluorescent Orange) reflective sheeting. Reflective sheeting for all other temporary signs and barricades shall comply with the requirements of ASTM D 4956, Type III.
713.02.2 2 Vertical Panels : Reflective sheeting for vertical
panels used to channelize or divide traffic shall meet the requirements of ASTM D 4956, Type III.
713.02.2 3 Drums and Supercones : Reflective sheeting for
drums and supercones shall meet the requirements of AS TM D 4956, Type III, and the Supplementary Requirement S2 for Reboundable Sheeting as specified in 1015.05.6 .
713.02.2 4 Traffic Cones : Reflective sheeting for traffic cones
shall meet the requirements of ASTM D4956, Type III or VI.
713.03 FABRICATION. Fabricate temporary signs, barricades, and
related devices according to 729.04 . Label back of signs with name of fabricator, date fabricated and the department project number. Fabricate precast concrete barriers according to Section 805 .
713.04 Temporary Signs and Barricades.
713.04.1 General : When work is in progress, furnish and install
temporary signs, barricades, and related devices on portions of the work covered by the Notice to Proceed or when operations are suspended. During such times that temporary signs, barricades, and related devices are not in place, maintain required traffic control devices. Do not begin construction work until signs, barricades, and ot her traffic control devices have been erected and approved. The contractor’ s Traffic Control Supervisor (TCS) shall coordinate with the engineer before removing or covering any signs that conflict with temporary traffic control signs. When placing signs, coordinate with the engineer in removing Departmental signs, so that appropriate signs are in place at all times. Signing shall remain in place and be maintained by the contractor, supplemented by additional signs as required, throughout the period of work. When erecting previously used signs on a project, the engineer must inspect and approve these signs before erection. Remove all signs with reduced retroreflectivity or excessive color fading from the work zone. In case of a dispute over a rejected used sign, the engineer may take such measurements or review retroreflectivity and color data obtained by the contractor to determine if the sign meets minimum standards for new materials. Replace signs that do not meet the minimum standards for new materials at no direct pay. Rejected signs will be marked on the back “NOT FOR USE ON STATE PROJECTS. ” Remove signs placed by the contractor according to the Traffic Control Plan. The Department will ensure that all permanent highway signs are in place upon completion and prior to final acceptance of the project. On projects where constructing the surface course with asphalt concre te or portland cement concrete, install permanent striping and raised pavement markers (when required) prior to removal of barrica des. Upon removal, signs, barricades, and related devices furnished and placed by the contractor shall remain the contractor’ s property.
713.04.2 Advance Warning Area : When specified, provide Type
C arrow boards for temporary traffic control at locations shown on the plans or as directed. fabricator, date fabricated and the department project number. Fabricate precast concrete barriers according to Section 805 .
713.04 Temporary Signs and Barricades.
713.04.1 General : When work is in progress, furnish and install
temporary signs, barricades, and related devices on portions of the work covered by the Notice to Proceed or when operations are suspended. During such times that temporary signs, barricades, and related devices are not in place, maintain required traffic control devices. Do not begin construction work until signs, barricades, and ot her traffic control devices have been erected and approved. The contractor’ s Traffic Control Supervisor (TCS) shall coordinate with the engineer before removing or covering any signs that conflict with temporary traffic control signs. When placing signs, coordinate with the engineer in removing Departmental signs, so that appropriate signs are in place at all times. Signing shall remain in place and be maintained by the contractor, supplemented by additional signs as required, throughout the period of work. When erecting previously used signs on a project, the engineer must inspect and approve these signs before erection. Remove all signs with reduced retroreflectivity or excessive color fading from the work zone. In case of a dispute over a rejected used sign, the engineer may take such measurements or review retroreflectivity and color data obtained by the contractor to determine if the sign meets minimum standards for new materials. Replace signs that do not meet the minimum standards for new materials at no direct pay. Rejected signs will be marked on the back “NOT FOR USE ON STATE PROJECTS. ” Remove signs placed by the contractor according to the Traffic Control Plan. The Department will ensure that all permanent highway signs are in place upon completion and prior to final acceptance of the project. On projects where constructing the surface course with asphalt concre te or portland cement concrete, install permanent striping and raised pavement markers (when required) prior to removal of barrica des. Upon removal, signs, barricades, and related devices furnished and placed by the contractor shall remain the contractor’ s property.
713.04.2 Advance Warning Area : When specified, provide Type
C arrow boards for temporary traffic control at locations shown on the plans or as directed. fabricator, date fabricated and the department project number. Fabricate precast concrete barriers according to Section 805 .
713.04 Temporary Signs and Barricades.
713.04.1 General : When work is in progress, furnish and install
temporary signs, barricades, and related devices on portions of the work covered by the Notice to Proceed or when operations are suspended. During such times that temporary signs, barricades, and related devices are not in place, maintain required traffic control devices. Do not begin construction work until signs, barricades, and ot her traffic control devices have been erected and approved. The contractor’ s Traffic Control Supervisor (TCS) shall coordinate with the engineer before removing or covering any signs that conflict with temporary traffic control signs. When placing signs, coordinate with the engineer in removing Departmental signs, so that appropriate signs are in place at all times. Signing shall remain in place and be maintained by the contractor, supplemented by additional signs as required, throughout the period of work. When erecting previously used signs on a project, the engineer must inspect and approve these signs before erection. Remove all signs with reduced retroreflectivity or excessive color fading from the work zone. In case of a dispute over a rejected used sign, the engineer may take such measurements or review retroreflectivity and color data obtained by the contractor to determine if the sign meets minimum standards for new materials. Replace signs that do not meet the minimum standards for new materials at no direct pay. Rejected signs will be marked on the back “NOT FOR USE ON STATE PROJECTS. ” Remove signs placed by the contractor according to the Traffic Control Plan. The Department will ensure that all permanent highway signs are in place upon completion and prior to final acceptance of the project. On projects where constructing the surface course with asphalt concre te or portland cement concrete, install permanent striping and raised pavement markers (when required) prior to removal of barrica des. Upon removal, signs, barricades, and related devices furnished and placed by the contractor shall remain the contractor’ s property.
713.04.2 Advance Warning Area : When specified, provide Type
C arrow boards for temporary traffic control at locations shown on the plans or as directed. fabricator, date fabricated and the department project number. Fabricate precast concrete barriers according to Section 805 .
713.04 Temporary Signs and Barricades.
713.04.1 General : When work is in progress, furnish and install
temporary signs, barricades, and related devices on portions of the work covered by the Notice to Proceed or when operations are suspended. During such times that temporary signs, barricades, and related devices are not in place, maintain required traffic control devices. Do not begin construction work until signs, barricades, and ot her traffic control devices have been erected and approved. The contractor’ s Traffic Control Supervisor (TCS) shall coordinate with the engineer before removing or covering any signs that conflict with temporary traffic control signs. When placing signs, coordinate with the engineer in removing Departmental signs, so that appropriate signs are in place at all times. Signing shall remain in place and be maintained by the contractor, supplemented by additional signs as required, throughout the period of work. When erecting previously used signs on a project, the engineer must inspect and approve these signs before erection. Remove all signs with reduced retroreflectivity or excessive color fading from the work zone. In case of a dispute over a rejected used sign, the engineer may take such measurements or review retroreflectivity and color data obtained by the contractor to determine if the sign meets minimum standards for new materials. Replace signs that do not meet the minimum standards for new materials at no direct pay. Rejected signs will be marked on the back “NOT FOR USE ON STATE PROJECTS. ” Remove signs placed by the contractor according to the Traffic Control Plan. The Department will ensure that all permanent highway signs are in place upon completion and prior to final acceptance of the project. On projects where constructing the surface course with asphalt concre te or portland cement concrete, install permanent striping and raised pavement markers (when required) prior to removal of barrica des. Upon removal, signs, barricades, and related devices furnished and placed by the contractor shall remain the contractor’ s property.
713.04.2 Advance Warning Area : When specified, provide Type
C arrow boards for temporary traffic control at locations shown on the plans or as directed.
713.04.3 Sign Supports : Mount signs a minimum of 5 feet above
the higher of the roadway or the ground clearance. In urban areas, mount the signs a minimum of 7 feet above the roadway.
713.05 PORTABLE CHANGEABLE MESSAGE SIGNS. Furnish,
operate, and maintain solar powered portable changeable message signs at all locations designated on the plans or as directed. The portable changeable message sign shall be in good operational condition when delivered to the job site. The engineer will inspect the signs; if they are found to be in good operational condition with all working parts functioning, the signs will be approved for use on the project. The message sign shall consist of three separate lines. Each line shall consist of eight characters. Each character shall nominally be 18 inches in height. The width shall be adequate to meet the below legibility requireme nts. Each character shall be a 5 x 7 LED module or hybrid LED disk. Characters shall be separated at a distance such that the legibili ty requirements are maintained. All internally illuminated portions of the sign shall be amber in color. Externally illuminated surfaces meant for message display shall be fluorescent yellow. Non-illuminated surfaces on the front panel shall be flat black in color. The sign shall be clearly visible under all conditions and all lanes of travel from a distance of 1000 feet perpendicular to the sign center. The sign shall maintain this legibility throughout the entire project. The contrac tor shall be responsible for maintaining this minimum legibility. Determination of legibility distance shall rest solely with the engineer. Use the portable changeable message sign in conjunction with other traffic signs and devices in accordance with the plans, project specifications, and as directed by the engineer. Messages shall be approved by the engineer. Store the signs in an approved secure storage area when not in use. Perform all maintenance operations recommended by the manufacturer and keep adequate records of such operations. Keep the signs clean and in good repair at all times.
713.04.3 Sign Supports : Mount signs a minimum of 5 feet above
the higher of the roadway or the ground clearance. In urban areas, mount the signs a minimum of 7 feet above the roadway.
713.05 PORTABLE CHANGEABLE MESSAGE SIGNS. Furnish,
operate, and maintain solar powered portable changeable message signs at all locations designated on the plans or as directed. The portable changeable message sign shall be in good operational condition when delivered to the job site. The engineer will inspect the signs; if they are found to be in good operational condition with all working parts functioning, the signs will be approved for use on the project. The message sign shall consist of three separate lines. Each line shall consist of eight characters. Each character shall nominally be 18 inches in height. The width shall be adequate to meet the below legibility requireme nts. Each character shall be a 5 x 7 LED module or hybrid LED disk. Characters shall be separated at a distance such that the legibili ty requirements are maintained. All internally illuminated portions of the sign shall be amber in color. Externally illuminated surfaces meant for message display shall be fluorescent yellow. Non-illuminated surfaces on the front panel shall be flat black in color. The sign shall be clearly visible under all conditions and all lanes of travel from a distance of 1000 feet perpendicular to the sign center. The sign shall maintain this legibility throughout the entire project. The contrac tor shall be responsible for maintaining this minimum legibility. Determination of legibility distance shall rest solely with the engineer. Use the portable changeable message sign in conjunction with other traffic signs and devices in accordance with the plans, project specifications, and as directed by the engineer. Messages shall be approved by the engineer. Store the signs in an approved secure storage area when not in use. Perform all maintenance operations recommended by the manufacturer and keep adequate records of such operations. Keep the signs clean and in good repair at all times.
713.04.3 Sign Supports : Mount signs a minimum of 5 feet above
the higher of the roadway or the ground clearance. In urban areas, mount the signs a minimum of 7 feet above the roadway.
713.05 PORTABLE CHANGEABLE MESSAGE SIGNS. Furnish,
operate, and maintain solar powered portable changeable message signs at all locations designated on the plans or as directed. The portable changeable message sign shall be in good operational condition when delivered to the job site. The engineer will inspect the signs; if they are found to be in good operational condition with all working parts functioning, the signs will be approved for use on the project. The message sign shall consist of three separate lines. Each line shall consist of eight characters. Each character shall nominally be 18 inches in height. The width shall be adequate to meet the below legibility requireme nts. Each character shall be a 5 x 7 LED module or hybrid LED disk. Characters shall be separated at a distance such that the legibili ty requirements are maintained. All internally illuminated portions of the sign shall be amber in color. Externally illuminated surfaces meant for message display shall be fluorescent yellow. Non-illuminated surfaces on the front panel shall be flat black in color. The sign shall be clearly visible under all conditions and all lanes of travel from a distance of 1000 feet perpendicular to the sign center. The sign shall maintain this legibility throughout the entire project. The contrac tor shall be responsible for maintaining this minimum legibility. Determination of legibility distance shall rest solely with the engineer. Use the portable changeable message sign in conjunction with other traffic signs and devices in accordance with the plans, project specifications, and as directed by the engineer. Messages shall be approved by the engineer. Store the signs in an approved secure storage area when not in use. Perform all maintenance operations recommended by the manufacturer and keep adequate records of such operations. Keep the signs clean and in good repair at all times.
713.06 TEMPORARY PRECAST CO NCRETE BARRIERS. Barrier
units shall be furnished by the contractor unless specified otherwise. Each barrier unit shall be 15 feet in length. When the barrier units are furnished by the Department, the units will be furnished at no cost to the contractor. The contractor shall load the barrier units at the location specified, deliver the units to the construction site, and place them as required. The contractor shall relocate barrier units as required during construction. Furnish connecting pins and plastic reflectors at no additional cost to the Departm ent. Reflectors shall have 7.0 square inches minimum reflectiv e area. Install a maximum of 15 feet apart (each side) and in accordance with the manufacturer’ s recommendations. Replace damaged pins or reflectors as directed by the engineer. After completion of the work, barrier units furnished by the Department shall be removed, transported by the contractor to the location specified, and unloaded as directed. All costs of loading, transporting, and unloading the barrier units shall be included in the contract price for this item. Barrier units furnished by the contractor shall, upon removal, remain the contractor’s property. Satisfactorily repair or replace damaged barrier units at no direct pay.
713.07 PAVEMENT MARKINGS. Color, width, and type of temporary
pavement markings shall be in accordance with Table 713 -1 and the MUTCD. Temporary pavement markings shall be in place by the end of each day’s operation. Apply temporary striping tape by approved methods to the satisfaction of the engineer. Apply thermoplastic pavement markings in accordance with
732.03 Apply painted traffic striping in accordance with Section 737 .
713.06 TEMPORARY PRECAST CO NCRETE BARRIERS. Barrier
units shall be furnished by the contractor unless specified otherwise. Each barrier unit shall be 15 feet in length. When the barrier units are furnished by the Department, the units will be furnished at no cost to the contractor. The contractor shall load the barrier units at the location specified, deliver the units to the construction site, and place them as required. The contractor shall relocate barrier units as required during construction. Furnish connecting pins and plastic reflectors at no additional cost to the Departm ent. Reflectors shall have 7.0 square inches minimum reflectiv e area. Install a maximum of 15 feet apart (each side) and in accordance with the manufacturer’ s recommendations. Replace damaged pins or reflectors as directed by the engineer. After completion of the work, barrier units furnished by the Department shall be removed, transported by the contractor to the location specified, and unloaded as directed. All costs of loading, transporting, and unloading the barrier units shall be included in the contract price for this item. Barrier units furnished by the contractor shall, upon removal, remain the contractor’s property. Satisfactorily repair or replace damaged barrier units at no direct pay.
713.07 PAVEMENT MARKINGS. Color, width, and type of temporary
pavement markings shall be in accordance with Table 713 -1 and the MUTCD. Temporary pavement markings shall be in place by the end of each day’s operation. Apply temporary striping tape by approved methods to the satisfaction of the engineer. Apply thermoplastic pavement markings in accordance with
732.03 Apply painted traffic striping in accordance with Section 737 .
713.06 TEMPORARY PRECAST CO NCRETE BARRIERS. Barrier
units shall be furnished by the contractor unless specified otherwise. Each barrier unit shall be 15 feet in length. When the barrier units are furnished by the Department, the units will be furnished at no cost to the contractor. The contractor shall load the barrier units at the location specified, deliver the units to the construction site, and place them as required. The contractor shall relocate barrier units as required during construction. Furnish connecting pins and plastic reflectors at no additional cost to the Departm ent. Reflectors shall have 7.0 square inches minimum reflectiv e area. Install a maximum of 15 feet apart (each side) and in accordance with the manufacturer’ s recommendations. Replace damaged pins or reflectors as directed by the engineer. After completion of the work, barrier units furnished by the Department shall be removed, transported by the contractor to the location specified, and unloaded as directed. All costs of loading, transporting, and unloading the barrier units shall be included in the contract price for this item. Barrier units furnished by the contractor shall, upon removal, remain the contractor’s property. Satisfactorily repair or replace damaged barrier units at no direct pay.
713.07 PAVEMENT MARKINGS. Color, width, and type of temporary
pavement markings shall be in accordance with Table 713 -1 and the MUTCD. Temporary pavement markings shall be in place by the end of each day’s operation. Apply temporary striping tape by approved methods to the satisfaction of the engineer. Apply thermoplastic pavement markings in accordance with
732.03 Apply painted traffic striping in accordance with Section 737 .
Table 713-1 Temporary Pavement Marking 1, 2, 3 Two-lane Highways Undivided Multilane Highways Divided Multilane Highways S H O R T T E R M All ADT’s with time <7 days Lane lines 4 -ft tape on 40-ft centers; with no passing zone markings. “Do Not Pass” and “Pass With Care” signs as required Lane lines 4 -ft tape on 40 -ft centers; dbl yellow centerline Lane lines 4 -ft tape on 40 -ft centers All ADT’s with time >7 days and ≤ 30 days Lane lines 4 -ft tape on 40 -ft centers with no passing zone markings and no edgelines. “Do Not Pass” and “Pass With Care” signs as required Lane lines 4 -ft tape on 40 -ft centers; dbl yellow centerline and edgelines Lane lines 4 -ft tape on 40 -ft centers and edgelines L O N G T E R M All ADT’s with time >30 days Standard 10-ft lane lines, no-passing zone markings; when pavement width is ≥22 ft , edge lines Standard 10-ft lane lines, centerlines, edge lines Standard 10-ft lane lines, centerlines, edge lines 1 No-passing zones shall be delineated as indicated whenever a project is open to traffic. 2 On all Asphalt Surface Treatments that are open to traffic and used as a final wearing course or as an interlayer, temporary pavement markings (tabs) on 20-foot centers shall be used in lieu of the 4-foot tape on 40-foot centers. 3 A $150 per day penalty will be assessed the contractor if Table 713-1 is not adhered to.
713.07.1 Short -term Pavement Markings : Provide short -term
pavement markings on all pavement surfaces under traffic. Table 713-1 Temporary Pavement Marking 1, 2, 3 Two-lane Highways Undivided Multilane Highways Divided Multilane Highways S H O R T T E R M All ADT’s with time <7 days Lane lines 4 -ft tape on 40-ft centers; with no passing zone markings. “Do Not Pass” and “Pass With Care” signs as required Lane lines 4 -ft tape on 40 -ft centers; dbl yellow centerline Lane lines 4 -ft tape on 40 -ft centers All ADT’s with time >7 days and ≤ 30 days Lane lines 4 -ft tape on 40 -ft centers with no passing zone markings and no edgelines. “Do Not Pass” and “Pass With Care” signs as required Lane lines 4 -ft tape on 40 -ft centers; dbl yellow centerline and edgelines Lane lines 4 -ft tape on 40 -ft centers and edgelines L O N G T E R M All ADT’s with time >30 days Standard 10-ft lane lines, no-passing zone markings; when pavement width is ≥22 ft , edge lines Standard 10-ft lane lines, centerlines, edge lines Standard 10-ft lane lines, centerlines, edge lines 1 No-passing zones shall be delineated as indicated whenever a project is open to traffic. 2 On all Asphalt Surface Treatments that are open to traffic and used as a final wearing course or as an interlayer, temporary pavement markings (tabs) on 20-foot centers shall be used in lieu of the 4-foot tape on 40-foot centers. 3 A $150 per day penalty will be assessed the contractor if Table 713-1 is not adhered to.
713.07.1 Short -term Pavement Markings : Provide short -term
pavement markings on all pavement surfaces under traffic. Install tempora ry striping tape a minimum of 4 feet long on a maximum of 40 -foot centers on centerlines of two-lane highways and lane lines of multilane highways. When short -term pavement markings require no- passing zone markings or double yellow centerlines on undivided multilane highways, use any of the temporary pavement markings listed in 713.02 . Removal of short -term pavement markings only required on the final surface.
713.07.2 Long -term Pavement Markings : Provide long-term
pavement markings on all surfaces not covered by an additional surface within two weeks. Long -term pavement markings shall include, but are not limited to, standard lane and centerline markings, edge lines, no passing zone markings on two -lane h ighways, stop bars, and legend and symbol markings as shown on the permanent pavement marking details. Layout work for exact location of markings will only be required on the final wearing surface . These markings include all of the pavement markings listed in 713.02 . Long -term markings do not include the installation of raised pavement markers.
713.07.3 Final Surface : On the final surface of portland cement
concrete pave ment or asphalt concrete pavement, place temporary markings with sufficient accuracy to avoid conflict with permanent striping. Temporary pavement markings on the final surface shall be any of the pavement markings listed in 713.02 . Place permanent markings over traffic paint on final surfaces provided the temporary markings have been placed in the final configuration and the painted lines are not flaking or showing signs of deterioration. When required, remove temporary pavement markings in accordance with the requirements for the type of permanent marking being used. No objectionable staining of pavement surface as a result of the removal procedure will be allowed.
713.07.4 Temporary Reflectorized Raised Pavement Markers :
When required, install temporary reflectorized raised pavement markers in accordance with Section 731 .
713.07.5 Pavement Markings for Asphalt Surface Treatment :
The type of markings shall be in accordance with Table 713-1. Put short - term temporary pavement markings in place at the end of each day’s operation. Put long -term temporary pavement markings in place as soon as practical after expiration of the four -day maintenance period following the Install tempora ry striping tape a minimum of 4 feet long on a maximum of 40 -foot centers on centerlines of two-lane highways and lane lines of multilane highways. When short -term pavement markings require no- passing zone markings or double yellow centerlines on undivided multilane highways, use any of the temporary pavement markings listed in 713.02 . Removal of short -term pavement markings only required on the final surface.
713.07.2 Long -term Pavement Markings : Provide long-term
pavement markings on all surfaces not covered by an additional surface within two weeks. Long -term pavement markings shall include, but are not limited to, standard lane and centerline markings, edge lines, no passing zone markings on two -lane h ighways, stop bars, and legend and symbol markings as shown on the permanent pavement marking details. Layout work for exact location of markings will only be required on the final wearing surface . These markings include all of the pavement markings listed in 713.02 . Long -term markings do not include the installation of raised pavement markers.
713.07.3 Final Surface : On the final surface of portland cement
concrete pave ment or asphalt concrete pavement, place temporary markings with sufficient accuracy to avoid conflict with permanent striping. Temporary pavement markings on the final surface shall be any of the pavement markings listed in 713.02 . Place permanent markings over traffic paint on final surfaces provided the temporary markings have been placed in the final configuration and the painted lines are not flaking or showing signs of deterioration. When required, remove temporary pavement markings in accordance with the requirements for the type of permanent marking being used. No objectionable staining of pavement surface as a result of the removal procedure will be allowed.
713.07.4 Temporary Reflectorized Raised Pavement Markers :
When required, install temporary reflectorized raised pavement markers in accordance with Section 731 .
713.07.5 Pavement Markings for Asphalt Surface Treatment :
The type of markings shall be in accordance with Table 713-1. Put short - term temporary pavement markings in place at the end of each day’s operation. Put long -term temporary pavement markings in place as soon as practical after expiration of the four -day maintenance period following the Install tempora ry striping tape a minimum of 4 feet long on a maximum of 40 -foot centers on centerlines of two-lane highways and lane lines of multilane highways. When short -term pavement markings require no- passing zone markings or double yellow centerlines on undivided multilane highways, use any of the temporary pavement markings listed in 713.02 . Removal of short -term pavement markings only required on the final surface.
713.07.2 Long -term Pavement Markings : Provide long-term
pavement markings on all surfaces not covered by an additional surface within two weeks. Long -term pavement markings shall include, but are not limited to, standard lane and centerline markings, edge lines, no passing zone markings on two -lane h ighways, stop bars, and legend and symbol markings as shown on the permanent pavement marking details. Layout work for exact location of markings will only be required on the final wearing surface . These markings include all of the pavement markings listed in 713.02 . Long -term markings do not include the installation of raised pavement markers.
713.07.3 Final Surface : On the final surface of portland cement
concrete pave ment or asphalt concrete pavement, place temporary markings with sufficient accuracy to avoid conflict with permanent striping. Temporary pavement markings on the final surface shall be any of the pavement markings listed in 713.02 . Place permanent markings over traffic paint on final surfaces provided the temporary markings have been placed in the final configuration and the painted lines are not flaking or showing signs of deterioration. When required, remove temporary pavement markings in accordance with the requirements for the type of permanent marking being used. No objectionable staining of pavement surface as a result of the removal procedure will be allowed.
713.07.4 Temporary Reflectorized Raised Pavement Markers :
When required, install temporary reflectorized raised pavement markers in accordance with Section 731 .
713.07.5 Pavement Markings for Asphalt Surface Treatment :
The type of markings shall be in accordance with Table 713-1. Put short - term temporary pavement markings in place at the end of each day’s operation. Put long -term temporary pavement markings in place as soon as practical after expiration of the four -day maintenance period following the Install tempora ry striping tape a minimum of 4 feet long on a maximum of 40 -foot centers on centerlines of two-lane highways and lane lines of multilane highways. When short -term pavement markings require no- passing zone markings or double yellow centerlines on undivided multilane highways, use any of the temporary pavement markings listed in 713.02 . Removal of short -term pavement markings only required on the final surface.
713.07.2 Long -term Pavement Markings : Provide long-term
pavement markings on all surfaces not covered by an additional surface within two weeks. Long -term pavement markings shall include, but are not limited to, standard lane and centerline markings, edge lines, no passing zone markings on two -lane h ighways, stop bars, and legend and symbol markings as shown on the permanent pavement marking details. Layout work for exact location of markings will only be required on the final wearing surface . These markings include all of the pavement markings listed in 713.02 . Long -term markings do not include the installation of raised pavement markers.
713.07.3 Final Surface : On the final surface of portland cement
concrete pave ment or asphalt concrete pavement, place temporary markings with sufficient accuracy to avoid conflict with permanent striping. Temporary pavement markings on the final surface shall be any of the pavement markings listed in 713.02 . Place permanent markings over traffic paint on final surfaces provided the temporary markings have been placed in the final configuration and the painted lines are not flaking or showing signs of deterioration. When required, remove temporary pavement markings in accordance with the requirements for the type of permanent marking being used. No objectionable staining of pavement surface as a result of the removal procedure will be allowed.
713.07.4 Temporary Reflectorized Raised Pavement Markers :
When required, install temporary reflectorized raised pavement markers in accordance with Section 731 .
713.07.5 Pavement Markings for Asphalt Surface Treatment :
The type of markings shall be in accordance with Table 713-1. Put short - term temporary pavement markings in place at the end of each day’s operation. Put long -term temporary pavement markings in place as soon as practical after expiration of the four -day maintenance period following the Install tempora ry striping tape a minimum of 4 feet long on a maximum of 40 -foot centers on centerlines of two-lane highways and lane lines of multilane highways. When short -term pavement markings require no- passing zone markings or double yellow centerlines on undivided multilane highways, use any of the temporary pavement markings listed in 713.02 . Removal of short -term pavement markings only required on the final surface.
713.07.2 Long -term Pavement Markings : Provide long-term
pavement markings on all surfaces not covered by an additional surface within two weeks. Long -term pavement markings shall include, but are not limited to, standard lane and centerline markings, edge lines, no passing zone markings on two -lane h ighways, stop bars, and legend and symbol markings as shown on the permanent pavement marking details. Layout work for exact location of markings will only be required on the final wearing surface . These markings include all of the pavement markings listed in 713.02 . Long -term markings do not include the installation of raised pavement markers.
713.07.3 Final Surface : On the final surface of portland cement
concrete pave ment or asphalt concrete pavement, place temporary markings with sufficient accuracy to avoid conflict with permanent striping. Temporary pavement markings on the final surface shall be any of the pavement markings listed in 713.02 . Place permanent markings over traffic paint on final surfaces provided the temporary markings have been placed in the final configuration and the painted lines are not flaking or showing signs of deterioration. When required, remove temporary pavement markings in accordance with the requirements for the type of permanent marking being used. No objectionable staining of pavement surface as a result of the removal procedure will be allowed.
713.07.4 Temporary Reflectorized Raised Pavement Markers :
When required, install temporary reflectorized raised pavement markers in accordance with Section 731 .
713.07.5 Pavement Markings for Asphalt Surface Treatment :
The type of markings shall be in accordance with Table 713-1. Put short - term temporary pavement markings in place at the end of each day’s operation. Put long -term temporary pavement markings in place as soon as practical after expiration of the four -day maintenance period following the asphalt surface treatment operation. On the final wearing course, place permanent markings within two weeks following completion of the long-term temporary pavement mar kings. When used on the final wearing course, painted traffic striping shall be in accordance with Section 737 . Install temporary raised markers on centerlines of two-lane highways and lane lines of multilane highways in accordance with 1015.08.3 . “No passing zone” markings shall be any of the temporary pavement markings listed in
713.02 .
Install the temporary raised pavement markers in accordance with the manufacturers’ recommendations or as directed by the engineer. Place temporary raised markers consisting of flexibl e reflective tabs at 20 -foot intervals on the centerline of the roadway. Install the markers so that the reflective faces of the markers are perpendicular to a line parallel to the roadway centerline. If directed by the engineer, remove the temporary raised pavement markers after permanent striping has been accomplished. Repair damage to the pavement surface at no direct pay.
713.08 Portable Work Zone T Raffic Control Devic Es.
All Category I, II, and III portable work zone traffic control devices, as described below, shall be crashworthy as determined by evaluations through the National Cooperative Highway Research Program (NCHRP) 350 for Test Level 3 (TL -3) or the American Association of State Transportation Officials (AASHTO) M anual for Assessing Safety Hardware (MASH) .
713.08.1 Category I Devices : Category I devices are low -mass,
single -piece traffic cones, tubular markers, single -piece drums, and flexible delineators. By definition, they are considered crashworthy devices meeting NCHRP Report 350 or MASH criteria. Drum and light combinations with Type A or C warning lights and va ndal resistant fastener hardware are included as Category I devices. In lieu of testing for crashworthiness, acceptance of Category I devices for compliance with NCHRP 350 or MASH will be allowed based on self -certification by the supplier. The supplier shall certify that the product is crashworthy in accordance with the evaluation criteria of NCHRP 350 or MASH. This certification may be a one -page affidavit signed by the supplier, with supporting documentation kept on file to be furnished if requested. asphalt surface treatment operation. On the final wearing course, place permanent markings within two weeks following completion of the long-term temporary pavement mar kings. When used on the final wearing course, painted traffic striping shall be in accordance with Section 737 . Install temporary raised markers on centerlines of two-lane highways and lane lines of multilane highways in accordance with 1015.08.3 . “No passing zone” markings shall be any of the temporary pavement markings listed in
713.02 .
Install the temporary raised pavement markers in accordance with the manufacturers’ recommendations or as directed by the engineer. Place temporary raised markers consisting of flexibl e reflective tabs at 20 -foot intervals on the centerline of the roadway. Install the markers so that the reflective faces of the markers are perpendicular to a line parallel to the roadway centerline. If directed by the engineer, remove the temporary raised pavement markers after permanent striping has been accomplished. Repair damage to the pavement surface at no direct pay.
713.08 Portable Work Zone T Raffic Control Devic Es.
All Category I, II, and III portable work zone traffic control devices, as described below, shall be crashworthy as determined by evaluations through the National Cooperative Highway Research Program (NCHRP) 350 for Test Level 3 (TL -3) or the American Association of State Transportation Officials (AASHTO) M anual for Assessing Safety Hardware (MASH) .
713.08.1 Category I Devices : Category I devices are low -mass,
single -piece traffic cones, tubular markers, single -piece drums, and flexible delineators. By definition, they are considered crashworthy devices meeting NCHRP Report 350 or MASH criteria. Drum and light combinations with Type A or C warning lights and va ndal resistant fastener hardware are included as Category I devices. In lieu of testing for crashworthiness, acceptance of Category I devices for compliance with NCHRP 350 or MASH will be allowed based on self -certification by the supplier. The supplier shall certify that the product is crashworthy in accordance with the evaluation criteria of NCHRP 350 or MASH. This certification may be a one -page affidavit signed by the supplier, with supporting documentation kept on file to be furnished if requested. asphalt surface treatment operation. On the final wearing course, place permanent markings within two weeks following completion of the long-term temporary pavement mar kings. When used on the final wearing course, painted traffic striping shall be in accordance with Section 737 . Install temporary raised markers on centerlines of two-lane highways and lane lines of multilane highways in accordance with 1015.08.3 . “No passing zone” markings shall be any of the temporary pavement markings listed in
713.02 .
Install the temporary raised pavement markers in accordance with the manufacturers’ recommendations or as directed by the engineer. Place temporary raised markers consisting of flexibl e reflective tabs at 20 -foot intervals on the centerline of the roadway. Install the markers so that the reflective faces of the markers are perpendicular to a line parallel to the roadway centerline. If directed by the engineer, remove the temporary raised pavement markers after permanent striping has been accomplished. Repair damage to the pavement surface at no direct pay.
713.08 Portable Work Zone T Raffic Control Devic Es.
All Category I, II, and III portable work zone traffic control devices, as described below, shall be crashworthy as determined by evaluations through the National Cooperative Highway Research Program (NCHRP) 350 for Test Level 3 (TL -3) or the American Association of State Transportation Officials (AASHTO) M anual for Assessing Safety Hardware (MASH) .
713.08.1 Category I Devices : Category I devices are low -mass,
single -piece traffic cones, tubular markers, single -piece drums, and flexible delineators. By definition, they are considered crashworthy devices meeting NCHRP Report 350 or MASH criteria. Drum and light combinations with Type A or C warning lights and va ndal resistant fastener hardware are included as Category I devices. In lieu of testing for crashworthiness, acceptance of Category I devices for compliance with NCHRP 350 or MASH will be allowed based on self -certification by the supplier. The supplier shall certify that the product is crashworthy in accordance with the evaluation criteria of NCHRP 350 or MASH. This certification may be a one -page affidavit signed by the supplier, with supporting documentation kept on file to be furnished if requested.
713.08.2 Category II Devices : Category II devices include other
low mass traffic control devices such as portable barricades either with or without lights or signs, portable sign stands, temporary sign posts, portable vertical panel assemblies, and drums with li ghts not meeting the drum and light combination requirements for Category I. Individual crash testing is required for Category II devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category II devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has be en crash tested and meets the NCHRP 350 or MASH requirements.
713.08.3 Category III Devices : Category III devices include
massive devices such as temporary concrete barriers, water filled barriers, and temporary attenuators. Individual crash testing is required for Category III devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category III devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has been crash tested and meets the NCHRP 350 or MASH requirements.
713.09 Traffic Control Mana Gement.
713.09.1 Authorization : Prior to commencing work requiring
traffic control management, submit to the engineer proof of the Traffic Control Supervisor’s (TCS) and Traffic Control Technician’s (TCT) current authorizations.
713.09.1 1 Traffic Control Supervisor (TCS) Authorization:
The Depar tment will accept the TCS authorization of other approved agencies or firms only if all of the following minimum TCS requirements are met:
713.08.2 Category II Devices : Category II devices include other
low mass traffic control devices such as portable barricades either with or without lights or signs, portable sign stands, temporary sign posts, portable vertical panel assemblies, and drums with li ghts not meeting the drum and light combination requirements for Category I. Individual crash testing is required for Category II devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category II devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has be en crash tested and meets the NCHRP 350 or MASH requirements.
713.08.3 Category III Devices : Category III devices include
massive devices such as temporary concrete barriers, water filled barriers, and temporary attenuators. Individual crash testing is required for Category III devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category III devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has been crash tested and meets the NCHRP 350 or MASH requirements.
713.09 Traffic Control Mana Gement.
713.09.1 Authorization : Prior to commencing work requiring
traffic control management, submit to the engineer proof of the Traffic Control Supervisor’s (TCS) and Traffic Control Technician’s (TCT) current authorizations.
713.09.1 1 Traffic Control Supervisor (TCS) Authorization:
The Depar tment will accept the TCS authorization of other approved agencies or firms only if all of the following minimum TCS requirements are met:
713.08.2 Category II Devices : Category II devices include other
low mass traffic control devices such as portable barricades either with or without lights or signs, portable sign stands, temporary sign posts, portable vertical panel assemblies, and drums with li ghts not meeting the drum and light combination requirements for Category I. Individual crash testing is required for Category II devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category II devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has be en crash tested and meets the NCHRP 350 or MASH requirements.
713.08.3 Category III Devices : Category III devices include
massive devices such as temporary concrete barriers, water filled barriers, and temporary attenuators. Individual crash testing is required for Category III devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category III devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has been crash tested and meets the NCHRP 350 or MASH requirements.
713.09 Traffic Control Mana Gement.
713.09.1 Authorization : Prior to commencing work requiring
traffic control management, submit to the engineer proof of the Traffic Control Supervisor’s (TCS) and Traffic Control Technician’s (TCT) current authorizations.
713.09.1 1 Traffic Control Supervisor (TCS) Authorization:
The Depar tment will accept the TCS authorization of other approved agencies or firms only if all of the following minimum TCS requirements are met:
713.08.2 Category II Devices : Category II devices include other
low mass traffic control devices such as portable barricades either with or without lights or signs, portable sign stands, temporary sign posts, portable vertical panel assemblies, and drums with li ghts not meeting the drum and light combination requirements for Category I. Individual crash testing is required for Category II devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category II devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has be en crash tested and meets the NCHRP 350 or MASH requirements.
713.08.3 Category III Devices : Category III devices include
massive devices such as temporary concrete barriers, water filled barriers, and temporary attenuators. Individual crash testing is required for Category III devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category III devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has been crash tested and meets the NCHRP 350 or MASH requirements.
713.09 Traffic Control Mana Gement.
713.09.1 Authorization : Prior to commencing work requiring
traffic control management, submit to the engineer proof of the Traffic Control Supervisor’s (TCS) and Traffic Control Technician’s (TCT) current authorizations.
713.09.1 1 Traffic Control Supervisor (TCS) Authorization:
The Depar tment will accept the TCS authorization of other approved agencies or firms only if all of the following minimum TCS requirements are met:
713.08.2 Category II Devices : Category II devices include other
low mass traffic control devices such as portable barricades either with or without lights or signs, portable sign stands, temporary sign posts, portable vertical panel assemblies, and drums with li ghts not meeting the drum and light combination requirements for Category I. Individual crash testing is required for Category II devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category II devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has be en crash tested and meets the NCHRP 350 or MASH requirements.
713.08.3 Category III Devices : Category III devices include
massive devices such as temporary concrete barriers, water filled barriers, and temporary attenuators. Individual crash testing is required for Category III devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category III devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has been crash tested and meets the NCHRP 350 or MASH requirements.
713.09 Traffic Control Mana Gement.
713.09.1 Authorization : Prior to commencing work requiring
traffic control management, submit to the engineer proof of the Traffic Control Supervisor’s (TCS) and Traffic Control Technician’s (TCT) current authorizations.
713.09.1 1 Traffic Control Supervisor (TCS) Authorization:
The Depar tment will accept the TCS authorization of other approved agencies or firms only if all of the following minimum TCS requirements are met:
713.08.2 Category II Devices : Category II devices include other
low mass traffic control devices such as portable barricades either with or without lights or signs, portable sign stands, temporary sign posts, portable vertical panel assemblies, and drums with li ghts not meeting the drum and light combination requirements for Category I. Individual crash testing is required for Category II devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category II devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has be en crash tested and meets the NCHRP 350 or MASH requirements.
713.08.3 Category III Devices : Category III devices include
massive devices such as temporary concrete barriers, water filled barriers, and temporary attenuators. Individual crash testing is required for Category III devices. FHWA letters of approval shall serve as verification that these devices comply with the crash testing requirements of NCHRP Report 350 or MASH. Provide for the engineer a listing of all the Category III devices to be used on the project prior to installation including a reference to the FHWA Work Zone letter number for each device. Also certify that each device has been crash tested and meets the NCHRP 350 or MASH requirements.
713.09 Traffic Control Mana Gement.
713.09.1 Authorization : Prior to commencing work requiring
traffic control management, submit to the engineer proof of the Traffic Control Supervisor’s (TCS) and Traffic Control Technician’s (TCT) current authorizations.
713.09.1 1 Traffic Control Supervisor (TCS) Authorization:
The Depar tment will accept the TCS authorization of other approved agencies or firms only if all of the following minimum TCS requirements are met:
713.09.1 2 Traffic Control Technician (TCT) Authorization:
The Department will accept the TCT authorization of other approved agencies or firms only if all of the following minimum requirements are met:
713.09.2 Traffic Control Supervisor (TCS) Duties : The TCS
shall be responsible for traffic control management. The TCS shall be available to the engineer to address traffic control management issues as needed. The following is a listing of the TCS’s primary duties:
713.09.1 2 Traffic Control Technician (TCT) Authorization:
The Department will accept the TCT authorization of other approved agencies or firms only if all of the following minimum requirements are met:
713.09.2 Traffic Control Supervisor (TCS) Duties : The TCS
shall be responsible for traffic control management. The TCS shall be available to the engineer to address traffic control management issues as needed. The following is a listing of the TCS’s primary duties:
713.09.1 2 Traffic Control Technician (TCT) Authorization:
The Department will accept the TCT authorization of other approved agencies or firms only if all of the following minimum requirements are met:
713.09.2 Traffic Control Supervisor (TCS) Duties : The TCS
shall be responsible for traffic control management. The TCS shall be available to the engineer to address traffic control management issues as needed. The following is a listing of the TCS’s primary duties:
713.09.3 Traffic Control Plan Revisions: Make requests for
revision in the traffic control plan in writing to the engineer a minimum of 14 calendar days in advance of the needed revision. If the requested revision falls within the scope of the existing contract drawings, the engineer may approve the revision. If the engineer determines that the requested revision is outside the scope of the contract drawings, the contractor will be required to submit a change order request. The change order drawings shall conform to the following:
713.09.3 Traffic Control Plan Revisions: Make requests for
revision in the traffic control plan in writing to the engineer a minimum of 14 calendar days in advance of the needed revision. If the requested revision falls within the scope of the existing contract drawings, the engineer may approve the revision. If the engineer determines that the requested revision is outside the scope of the contract drawings, the contractor will be required to submit a change order request. The change order drawings shall conform to the following:
713.09.4 Traffic Control Diary : The TCS shall maintain a project
traffic control diary using the Department’s Site Manager Program. As a requirement of 713.09.2 .8, keep the traffic control diary current on a daily basis and electronically sign each daily entry. A date stamp is required on each diary, so it is imperative to complete these diaries in a time ly manner. Completion and maintaining of the daily diaries in accordance with the plans and specifications is subject to the LA R.S. 14:133 “Filing or Maintaining False Public Records.” Photographs and videotapes may be used to supplement the written tex t.
713.09.4 Traffic Control Diary : The TCS shall maintain a project
traffic control diary using the Department’s Site Manager Program. As a requirement of 713.09.2 .8, keep the traffic control diary current on a daily basis and electronically sign each daily entry. A date stamp is required on each diary, so it is imperative to complete these diaries in a time ly manner. Completion and maintaining of the daily diaries in accordance with the plans and specifications is subject to the LA R.S. 14:133 “Filing or Maintaining False Public Records.” Photographs and videotapes may be used to supplement the written tex t. Make the traffic control diary available at all times for inspection by the engineer. Review the diary with the engineer on a weekly basis and submit a copy to the engineer on a monthly basis . Failure to complete the diary on a daily basis or make the diary available for review shall result in a deduction from payments for the work of $150 per calendar day as stipulated damages for each day the diary is not completed or maintained. On days when the Department’s Site Manager Program is unavailable, either due to location or operation, the TCS shall make arrangements with the approval of the Project Engineer to submit the traffic control diaries daily. Failure to submit the monthly copy of the diary to the engineer shall result in the withholding of the next partial payment until the past due diaries are submitted. Submitted diaries that indicate that contemporary daily record keeping has not been maintained, as determined by the engineer, the Department’s Work Zone Engineer, or the Department’s State wide Traffic Control Specialist shall result in a deduction of $150 for each such deficiency as stipulated damages from payments for the work. The lack of a weekly review by the engin eer shall not relieve the contractor from the assessment of stipulated damages for its failure to maintain a daily traffic control diary. The traffic control diary is part of pay item 713 and shall become the property of the Department at the completion of the project. The contractor, with the approval of the engineer, the Department’s Work Zone Engineer, or the Department’s Statewide Traffic Control Specialist, may cease the requirement for a traffic control diary when:
713.09.5 Inspection of Traffic Control : The TCS s hall be
responsible for the inspection of all traffic control devices every calendar Make the traffic control diary available at all times for inspection by the engineer. Review the diary with the engineer on a weekly basis and submit a copy to the engineer on a monthly basis . Failure to complete the diary on a daily basis or make the diary available for review shall result in a deduction from payments for the work of $150 per calendar day as stipulated damages for each day the diary is not completed or maintained. On days when the Department’s Site Manager Program is unavailable, either due to location or operation, the TCS shall make arrangements with the approval of the Project Engineer to submit the traffic control diaries daily. Failure to submit the monthly copy of the diary to the engineer shall result in the withholding of the next partial payment until the past due diaries are submitted. Submitted diaries that indicate that contemporary daily record keeping has not been maintained, as determined by the engineer, the Department’s Work Zone Engineer, or the Department’s State wide Traffic Control Specialist shall result in a deduction of $150 for each such deficiency as stipulated damages from payments for the work. The lack of a weekly review by the engin eer shall not relieve the contractor from the assessment of stipulated damages for its failure to maintain a daily traffic control diary. The traffic control diary is part of pay item 713 and shall become the property of the Department at the completion of the project. The contractor, with the approval of the engineer, the Department’s Work Zone Engineer, or the Department’s Statewide Traffic Control Specialist, may cease the requirement for a traffic control diary when:
713.09.5 Inspection of Traffic Control : The TCS s hall be
responsible for the inspection of all traffic control devices every calendar day that traffic control devices are in use. This inspection may be delegated to the TCT, except for the conditions described in 713.09.2 .1 above, where the TCS shall conduct the inspections himself. Regardless, the TCS shall be stationed within one hour of the jobsite. Use the Quality Guidelines for Work Zone Traffic Control Devices standard by the American Traffic Safety Services Association (ATSSA) to evaluate the condition of the traffic control devices to determine if the y are acceptable for use. Provide for the immediate repair, cleaning, or replacement of any traffic control devices not functioning as required to ensure the safety of the motorist and construction personnel and/or not meeting the ATSSA standard. Conduct inspection of the traffic control devices by the TCS at the beginning and end of each workday, and as scheduled or directed by the engineer during the workday. Inspect the traffic control devices by the TCS on weekends, holidays, or other non-work days at least once per day. Inspect traffic control devices by the TCS at least once a week during nighttime periods and the same night after any modifications or changes have been made in the traffic control devices.
713.09.6 Failure to Comply : The engineer, the Department’s Work
Zone Engineer, or the Department’s Statewide Traffic Control Specialist may suspend all or part of the contractor’s operation(s) for failure to comply with the approved “Traffic Control Plan” or failure to correct unsafe traffic condition s within a reasonable period of time after such notification is given to the contractor in writing. If major traffic control deficiencies require immediate corrective action for the safety of the travelling public, the engineer, the Department’s Work Zone Engineer, or the Department’s Statewide Traffic Control Specialist may completely suspend the contractor’s operations. This suspension can either be spoken or written, but if spoken, shall be followed up in writing as soon as practical. The Department r eserves the right to revoke or de -certify the TCS for gross neglect of these duties. At this point, the TCS shall retake a Department approved TCS course and shall be subject to a 90 -day probationary period at the discretion of the Department. In the even t that the contractor does not take appropriate action to bring the deficient traffic control into compliance with the approved traffic control plan or to correct the unsafe traffic conditions, the Department may proceed with the corrective action using its own forces, and such costs will be deducted from payments owed to the contractor. day that traffic control devices are in use. This inspection may be delegated to the TCT, except for the conditions described in 713.09.2 .1 above, where the TCS shall conduct the inspections himself. Regardless, the TCS shall be stationed within one hour of the jobsite. Use the Quality Guidelines for Work Zone Traffic Control Devices standard by the American Traffic Safety Services Association (ATSSA) to evaluate the condition of the traffic control devices to determine if the y are acceptable for use. Provide for the immediate repair, cleaning, or replacement of any traffic control devices not functioning as required to ensure the safety of the motorist and construction personnel and/or not meeting the ATSSA standard. Conduct inspection of the traffic control devices by the TCS at the beginning and end of each workday, and as scheduled or directed by the engineer during the workday. Inspect the traffic control devices by the TCS on weekends, holidays, or other non-work days at least once per day. Inspect traffic control devices by the TCS at least once a week during nighttime periods and the same night after any modifications or changes have been made in the traffic control devices.
713.09.6 Failure to Comply : The engineer, the Department’s Work
Zone Engineer, or the Department’s Statewide Traffic Control Specialist may suspend all or part of the contractor’s operation(s) for failure to comply with the approved “Traffic Control Plan” or failure to correct unsafe traffic condition s within a reasonable period of time after such notification is given to the contractor in writing. If major traffic control deficiencies require immediate corrective action for the safety of the travelling public, the engineer, the Department’s Work Zone Engineer, or the Department’s Statewide Traffic Control Specialist may completely suspend the contractor’s operations. This suspension can either be spoken or written, but if spoken, shall be followed up in writing as soon as practical. The Department r eserves the right to revoke or de -certify the TCS for gross neglect of these duties. At this point, the TCS shall retake a Department approved TCS course and shall be subject to a 90 -day probationary period at the discretion of the Department. In the even t that the contractor does not take appropriate action to bring the deficient traffic control into compliance with the approved traffic control plan or to correct the unsafe traffic conditions, the Department may proceed with the corrective action using its own forces, and such costs will be deducted from payments owed to the contractor. If the contractor’s operations are suspended, the normal assessment of contract time will not cease for the period required to correct these unsafe conditions and traffic control deficiencies. The contractor will not be relieved of the responsibility to provide traffic control safety to the traveling public when a project is under full or partial project suspension. When a project is under suspension due to the contractor’s failure to comply with this section, or when the contract is under stipulated damages, continue to provide traffic control management. No additional measurement or payment will be made. If suspensions or partial suspensions are requested by the contractor, the additional traffic control management costs will be at no expense to the Department .
713.09.7 Engineer Modifications : The provisions included in the
plans and specifications for handling and controlling traffic during construction may be chan ged by the engineer, with the approval of the DOTD District Traffic Operations Engineer, due to actual field conditions encountered. Such changes will be made by written instruction to the contractor and be considered an amendment of the plans and specifi cations as of the date of the change.
713.10 Nighttime Constructi On Operations.
713.10.1 Description: This work consists of furnishing, installing,
operating, maintaining, moving, and removing portable light towers and equipment -mounted fixtures for nighttime construction operations. Nighttime construction operations are defined as work performed after sunset and before sunrise.
713.10.2 Equipment Requirements: Materials and equipment
shall be in good operating condition and in compliance with applicable OSHA, NEC, and NEMA codes. The contractor shall furnish, to the engineer, two light meters capable of measuring the level of illuminance. These light meters will be used by the engineer to check the adequacy of illumination throughout the nighttime construction operations. The light meters will become the property of the contractor after final acceptance. Suitable brackets and hardware shall be provided to mount lighting fixtures on equipment and machinery. Mountings shall be designed so that light fixtures can be positioned as necessary to reduce glare and provide the required illumination. Mounting brackets and fixtures shall not interfere with the equipment operator or any overhead structures and shall be securely connected to the fixtures to ensure minimum vibration. If the contractor’s operations are suspended, the normal assessment of contract time will not cease for the period required to correct these unsafe conditions and traffic control deficiencies. The contractor will not be relieved of the responsibility to provide traffic control safety to the traveling public when a project is under full or partial project suspension. When a project is under suspension due to the contractor’s failure to comply with this section, or when the contract is under stipulated damages, continue to provide traffic control management. No additional measurement or payment will be made. If suspensions or partial suspensions are requested by the contractor, the additional traffic control management costs will be at no expense to the Department .
713.09.7 Engineer Modifications : The provisions included in the
plans and specifications for handling and controlling traffic during construction may be chan ged by the engineer, with the approval of the DOTD District Traffic Operations Engineer, due to actual field conditions encountered. Such changes will be made by written instruction to the contractor and be considered an amendment of the plans and specifi cations as of the date of the change.
713.10 Nighttime Constructi On Operations.
713.10.1 Description: This work consists of furnishing, installing,
operating, maintaining, moving, and removing portable light towers and equipment -mounted fixtures for nighttime construction operations. Nighttime construction operations are defined as work performed after sunset and before sunrise.
713.10.2 Equipment Requirements: Materials and equipment
shall be in good operating condition and in compliance with applicable OSHA, NEC, and NEMA codes. The contractor shall furnish, to the engineer, two light meters capable of measuring the level of illuminance. These light meters will be used by the engineer to check the adequacy of illumination throughout the nighttime construction operations. The light meters will become the property of the contractor after final acceptance. Suitable brackets and hardware shall be provided to mount lighting fixtures on equipment and machinery. Mountings shall be designed so that light fixtures can be positioned as necessary to reduce glare and provide the required illumination. Mounting brackets and fixtures shall not interfere with the equipment operator or any overhead structures and shall be securely connected to the fixtures to ensure minimum vibration. If the contractor’s operations are suspended, the normal assessment of contract time will not cease for the period required to correct these unsafe conditions and traffic control deficiencies. The contractor will not be relieved of the responsibility to provide traffic control safety to the traveling public when a project is under full or partial project suspension. When a project is under suspension due to the contractor’s failure to comply with this section, or when the contract is under stipulated damages, continue to provide traffic control management. No additional measurement or payment will be made. If suspensions or partial suspensions are requested by the contractor, the additional traffic control management costs will be at no expense to the Department .
713.09.7 Engineer Modifications : The provisions included in the
plans and specifications for handling and controlling traffic during construction may be chan ged by the engineer, with the approval of the DOTD District Traffic Operations Engineer, due to actual field conditions encountered. Such changes will be made by written instruction to the contractor and be considered an amendment of the plans and specifi cations as of the date of the change.
713.10 Nighttime Constructi On Operations.
713.10.1 Description: This work consists of furnishing, installing,
operating, maintaining, moving, and removing portable light towers and equipment -mounted fixtures for nighttime construction operations. Nighttime construction operations are defined as work performed after sunset and before sunrise.
713.10.2 Equipment Requirements: Materials and equipment
shall be in good operating condition and in compliance with applicable OSHA, NEC, and NEMA codes. The contractor shall furnish, to the engineer, two light meters capable of measuring the level of illuminance. These light meters will be used by the engineer to check the adequacy of illumination throughout the nighttime construction operations. The light meters will become the property of the contractor after final acceptance. Suitable brackets and hardware shall be provided to mount lighting fixtures on equipment and machinery. Mountings shall be designed so that light fixtures can be positioned as necessary to reduce glare and provide the required illumination. Mounting brackets and fixtures shall not interfere with the equipment operator or any overhead structures and shall be securely connected to the fixtures to ensure minimum vibration. If the contractor’s operations are suspended, the normal assessment of contract time will not cease for the period required to correct these unsafe conditions and traffic control deficiencies. The contractor will not be relieved of the responsibility to provide traffic control safety to the traveling public when a project is under full or partial project suspension. When a project is under suspension due to the contractor’s failure to comply with this section, or when the contract is under stipulated damages, continue to provide traffic control management. No additional measurement or payment will be made. If suspensions or partial suspensions are requested by the contractor, the additional traffic control management costs will be at no expense to the Department .
713.09.7 Engineer Modifications : The provisions included in the
plans and specifications for handling and controlling traffic during construction may be chan ged by the engineer, with the approval of the DOTD District Traffic Operations Engineer, due to actual field conditions encountered. Such changes will be made by written instruction to the contractor and be considered an amendment of the plans and specifi cations as of the date of the change.
713.10 Nighttime Constructi On Operations.
713.10.1 Description: This work consists of furnishing, installing,
operating, maintaining, moving, and removing portable light towers and equipment -mounted fixtures for nighttime construction operations. Nighttime construction operations are defined as work performed after sunset and before sunrise.
713.10.2 Equipment Requirements: Materials and equipment
shall be in good operating condition and in compliance with applicable OSHA, NEC, and NEMA codes. The contractor shall furnish, to the engineer, two light meters capable of measuring the level of illuminance. These light meters will be used by the engineer to check the adequacy of illumination throughout the nighttime construction operations. The light meters will become the property of the contractor after final acceptance. Suitable brackets and hardware shall be provided to mount lighting fixtures on equipment and machinery. Mountings shall be designed so that light fixtures can be positioned as necessary to reduce glare and provide the required illumination. Mounting brackets and fixtures shall not interfere with the equipment operator or any overhead structures and shall be securely connected to the fixtures to ensure minimum vibration. If the contractor’s operations are suspended, the normal assessment of contract time will not cease for the period required to correct these unsafe conditions and traffic control deficiencies. The contractor will not be relieved of the responsibility to provide traffic control safety to the traveling public when a project is under full or partial project suspension. When a project is under suspension due to the contractor’s failure to comply with this section, or when the contract is under stipulated damages, continue to provide traffic control management. No additional measurement or payment will be made. If suspensions or partial suspensions are requested by the contractor, the additional traffic control management costs will be at no expense to the Department .
713.09.7 Engineer Modifications : The provisions included in the
plans and specifications for handling and controlling traffic during construction may be chan ged by the engineer, with the approval of the DOTD District Traffic Operations Engineer, due to actual field conditions encountered. Such changes will be made by written instruction to the contractor and be considered an amendment of the plans and specifi cations as of the date of the change.
713.10 Nighttime Constructi On Operations.
713.10.1 Description: This work consists of furnishing, installing,
operating, maintaining, moving, and removing portable light towers and equipment -mounted fixtures for nighttime construction operations. Nighttime construction operations are defined as work performed after sunset and before sunrise.
713.10.2 Equipment Requirements: Materials and equipment
shall be in good operating condition and in compliance with applicable OSHA, NEC, and NEMA codes. The contractor shall furnish, to the engineer, two light meters capable of measuring the level of illuminance. These light meters will be used by the engineer to check the adequacy of illumination throughout the nighttime construction operations. The light meters will become the property of the contractor after final acceptance. Suitable brackets and hardware shall be provided to mount lighting fixtures on equipment and machinery. Mountings shall be designed so that light fixtures can be positioned as necessary to reduce glare and provide the required illumination. Mounting brackets and fixtures shall not interfere with the equipment operator or any overhead structures and shall be securely connected to the fixtures to ensure minimum vibration. Equipment -mounted systems shall be attached to construction equipment to provide Level II and Level III illuminance. Equipment mounted lighting shall be designed and positioned to be operated independently of general illumination. Portable systems may consist of ground -mounted, trailer -mounted, or equipment mounted light towers. Portable light towers shall be sturdy and free-standing without the aid of guy wires or bracing. Towers shall be capable of being moved as necessary to keep pace with the construction operation. Extreme caution shall be used when moving portable light towers in the vicinity of overhead utilities. Portable lighting systems shall be positioned to minimize the risk of being impacted by traffic on the roadway or by construction equipment. Conventional vehicle headlights shall not be permitted as the sole means of illumination while working. All motorized vehicles shall be equipped with conventional vehicle headlights to permit safe movement in non- illuminated areas. Use of strobe lights on vehicles and equipment is prohibited. Use of flashing lights shall be kept to a minimum to prevent motorist distraction. Flashing lights shall not be used behind barrier protection systems. Switches shall be provided to adequately control the various lights. All wiring shall be weatherproof and installed according to local, state, federal, and OSHA requirements. Ground fault circuit interrupters shall be provided for electrical outlets used for electrical tools and extension cords. The contractor shall provide sufficient fuel, spare lamps, generators , and qualified personnel to ensure that all required lights operate continuously during nighttime construction operations. In the event of any failure of the lighting system, the construction operation shall be discontinued until the required level of illumination is restored. In residential areas, generator systems shall be selected to comply with local noise ordinances. A supply of emergency flares shall be maintained by the contractor for use in the event of emergency or unanticipated situations.
713.10.3 Illumination Requirements: All operations that are
performed during nighttime hours shall be properly illuminated to allow for the safe performance and inspection of the work. Work area is defined as a minimum of 50 feet ahead and behind the employee, where work is to be performed. A minimum of 5 foot-candles (54 lux) shall be maintained throughout the work area during nighttime construction operations, and during the setup and removal of lane or roadway closures. Equipment -mounted systems shall be attached to construction equipment to provide Level II and Level III illuminance. Equipment mounted lighting shall be designed and positioned to be operated independently of general illumination. Portable systems may consist of ground -mounted, trailer -mounted, or equipment mounted light towers. Portable light towers shall be sturdy and free-standing without the aid of guy wires or bracing. Towers shall be capable of being moved as necessary to keep pace with the construction operation. Extreme caution shall be used when moving portable light towers in the vicinity of overhead utilities. Portable lighting systems shall be positioned to minimize the risk of being impacted by traffic on the roadway or by construction equipment. Conventional vehicle headlights shall not be permitted as the sole means of illumination while working. All motorized vehicles shall be equipped with conventional vehicle headlights to permit safe movement in non- illuminated areas. Use of strobe lights on vehicles and equipment is prohibited. Use of flashing lights shall be kept to a minimum to prevent motorist distraction. Flashing lights shall not be used behind barrier protection systems. Switches shall be provided to adequately control the various lights. All wiring shall be weatherproof and installed according to local, state, federal, and OSHA requirements. Ground fault circuit interrupters shall be provided for electrical outlets used for electrical tools and extension cords. The contractor shall provide sufficient fuel, spare lamps, generators , and qualified personnel to ensure that all required lights operate continuously during nighttime construction operations. In the event of any failure of the lighting system, the construction operation shall be discontinued until the required level of illumination is restored. In residential areas, generator systems shall be selected to comply with local noise ordinances. A supply of emergency flares shall be maintained by the contractor for use in the event of emergency or unanticipated situations.
713.10.3 Illumination Requirements: All operations that are
performed during nighttime hours shall be properly illuminated to allow for the safe performance and inspection of the work. Work area is defined as a minimum of 50 feet ahead and behind the employee, where work is to be performed. A minimum of 5 foot-candles (54 lux) shall be maintained throughout the work area during nighttime construction operations, and during the setup and removal of lane or roadway closures. Lighting shall be adequate to meet the required level of illuminance and uniformity over the work area as follows:
713.10.3 1 Level I (5 foot -candles, 54 lux): This level of
illuminance shall be provided for all work areas of general construction operations, such as excavation and embankment; cleaning and sweeping; landscaping; planting and seeding. Stockpiles shall also be illuminated to Level I to enhance safety and improve work efficiency.
713.10.3 2 Level II (10 foot -candles, 108 lux): This level of
illuminance is required for areas on or around construction equipment such as that used for drainage installations, striping, base course construction, milling, asphalt paving operations, and concrete placement and removal. This level is necessary for safe operation of equipment and for obtaining an acceptable level of accuracy.
713.10.3 3 Level III (20 foot -candles, 215 lux): This level of
illuminance is required for tasks requiring a higher level of visual performance or for tasks with a higher level of difficulty. Such tasks include, pavement or structural crack filling, joint repair, joint cleaning, joint sealing, pavement patching and repairs, saw-cutting, installation of signal equipment or other electrical/mechanical equipment, and other tasks involving fine details or intricate parts and equipment.
713.10.4 Glare Control: All lighting provided under this item shall
be designed, installed, and operated to avoid glare interference with roadway traffic or discomfort for residences adjoining the roadway. The contractor shall locate, aim, and adjust the lights to provide the required level of illuminance and uniformity in the work area without the creation of objectionable glare. The engineer shall determi ne when glare exceeds acceptable levels, either for traffic or adjoining residences. The contractor shall provide shields, visors, or louvers on luminaries as necessary to reduce objectionable levels of glare. At a minimum, the following requirements shall be met to avoid objectionable glare to oncoming traffic:
713.10.3 1 Level I (5 foot -candles, 54 lux): This level of
illuminance shall be provided for all work areas of general construction operations, such as excavation and embankment; cleaning and sweeping; landscaping; planting and seeding. Stockpiles shall also be illuminated to Level I to enhance safety and improve work efficiency.
713.10.3 2 Level II (10 foot -candles, 108 lux): This level of
illuminance is required for areas on or around construction equipment such as that used for drainage installations, striping, base course construction, milling, asphalt paving operations, and concrete placement and removal. This level is necessary for safe operation of equipment and for obtaining an acceptable level of accuracy.
713.10.3 3 Level III (20 foot -candles, 215 lux): This level of
illuminance is required for tasks requiring a higher level of visual performance or for tasks with a higher level of difficulty. Such tasks include, pavement or structural crack filling, joint repair, joint cleaning, joint sealing, pavement patching and repairs, saw-cutting, installation of signal equipment or other electrical/mechanical equipment, and other tasks involving fine details or intricate parts and equipment.
713.10.4 Glare Control: All lighting provided under this item shall
be designed, installed, and operated to avoid glare interference with roadway traffic or discomfort for residences adjoining the roadway. The contractor shall locate, aim, and adjust the lights to provide the required level of illuminance and uniformity in the work area without the creation of objectionable glare. The engineer shall determi ne when glare exceeds acceptable levels, either for traffic or adjoining residences. The contractor shall provide shields, visors, or louvers on luminaries as necessary to reduce objectionable levels of glare. At a minimum, the following requirements shall be met to avoid objectionable glare to oncoming traffic:
713.10.3 1 Level I (5 foot -candles, 54 lux): This level of
illuminance shall be provided for all work areas of general construction operations, such as excavation and embankment; cleaning and sweeping; landscaping; planting and seeding. Stockpiles shall also be illuminated to Level I to enhance safety and improve work efficiency.
713.10.3 2 Level II (10 foot -candles, 108 lux): This level of
illuminance is required for areas on or around construction equipment such as that used for drainage installations, striping, base course construction, milling, asphalt paving operations, and concrete placement and removal. This level is necessary for safe operation of equipment and for obtaining an acceptable level of accuracy.
713.10.3 3 Level III (20 foot -candles, 215 lux): This level of
illuminance is required for tasks requiring a higher level of visual performance or for tasks with a higher level of difficulty. Such tasks include, pavement or structural crack filling, joint repair, joint cleaning, joint sealing, pavement patching and repairs, saw-cutting, installation of signal equipment or other electrical/mechanical equipment, and other tasks involving fine details or intricate parts and equipment.
713.10.4 Glare Control: All lighting provided under this item shall
be designed, installed, and operated to avoid glare interference with roadway traffic or discomfort for residences adjoining the roadway. The contractor shall locate, aim, and adjust the lights to provide the required level of illuminance and uniformity in the work area without the creation of objectionable glare. The engineer shall determi ne when glare exceeds acceptable levels, either for traffic or adjoining residences. The contractor shall provide shields, visors, or louvers on luminaries as necessary to reduce objectionable levels of glare. At a minimum, the following requirements shall be met to avoid objectionable glare to oncoming traffic:
713.10.3 1 Level I (5 foot -candles, 54 lux): This level of
illuminance shall be provided for all work areas of general construction operations, such as excavation and embankment; cleaning and sweeping; landscaping; planting and seeding. Stockpiles shall also be illuminated to Level I to enhance safety and improve work efficiency.
713.10.3 2 Level II (10 foot -candles, 108 lux): This level of
illuminance is required for areas on or around construction equipment such as that used for drainage installations, striping, base course construction, milling, asphalt paving operations, and concrete placement and removal. This level is necessary for safe operation of equipment and for obtaining an acceptable level of accuracy.
713.10.3 3 Level III (20 foot -candles, 215 lux): This level of
illuminance is required for tasks requiring a higher level of visual performance or for tasks with a higher level of difficulty. Such tasks include, pavement or structural crack filling, joint repair, joint cleaning, joint sealing, pavement patching and repairs, saw-cutting, installation of signal equipment or other electrical/mechanical equipment, and other tasks involving fine details or intricate parts and equipment.
713.10.4 Glare Control: All lighting provided under this item shall
be designed, installed, and operated to avoid glare interference with roadway traffic or discomfort for residences adjoining the roadway. The contractor shall locate, aim, and adjust the lights to provide the required level of illuminance and uniformity in the work area without the creation of objectionable glare. The engineer shall determi ne when glare exceeds acceptable levels, either for traffic or adjoining residences. The contractor shall provide shields, visors, or louvers on luminaries as necessary to reduce objectionable levels of glare. At a minimum, the following requirements shall be met to avoid objectionable glare to oncoming traffic:
713.10.3 1 Level I (5 foot -candles, 54 lux): This level of
illuminance shall be provided for all work areas of general construction operations, such as excavation and embankment; cleaning and sweeping; landscaping; planting and seeding. Stockpiles shall also be illuminated to Level I to enhance safety and improve work efficiency.
713.10.3 2 Level II (10 foot -candles, 108 lux): This level of
illuminance is required for areas on or around construction equipment such as that used for drainage installations, striping, base course construction, milling, asphalt paving operations, and concrete placement and removal. This level is necessary for safe operation of equipment and for obtaining an acceptable level of accuracy.
713.10.3 3 Level III (20 foot -candles, 215 lux): This level of
illuminance is required for tasks requiring a higher level of visual performance or for tasks with a higher level of difficulty. Such tasks include, pavement or structural crack filling, joint repair, joint cleaning, joint sealing, pavement patching and repairs, saw-cutting, installation of signal equipment or other electrical/mechanical equipment, and other tasks involving fine details or intricate parts and equipment.
713.10.4 Glare Control: All lighting provided under this item shall
be designed, installed, and operated to avoid glare interference with roadway traffic or discomfort for residences adjoining the roadway. The contractor shall locate, aim, and adjust the lights to provide the required level of illuminance and uniformity in the work area without the creation of objectionable glare. The engineer shall determi ne when glare exceeds acceptable levels, either for traffic or adjoining residences. The contractor shall provide shields, visors, or louvers on luminaries as necessary to reduce objectionable levels of glare. At a minimum, the following requirements shall be met to avoid objectionable glare to oncoming traffic:
713.10.5 Operational Requirements: Thirty days prior to the
start of night time operations, the contractor shall submit a lighting plan to the engineer for acceptance. The contractor shall select appropriate lighting systems and design a lighting plan to achieve the required illuminance levels. The lighting plan shall include location of lights necessary for every aspect of work; description of light equipment to be used; description of power source; attachment and mounting details for lights to be attached to equipment; technical details pertaining to the lighting fixtures; details on hoods, louvers, shields, or other glare control methods; and lighting calculations confirming that the illumination requirements will be met by the layout plan. Lighting inspection will include (1) light meter measurements to determine illumination levels, (2) subjective observation of the lighting setup to evaluate glare potential for drivers and workers, and (3) a physical check of the lighting equipment to ensure that it complies with the specification requirements included in the contractor’s lighting plan. Prior to the first night of operation, the engineer will check the adequacy of the installed lighting using a light meter. A summary of these measurements will be noted in the inspection records to provide a basis for comparing subsequent measurements. If the required illuminance levels are not met, the contractor shall make the necessary adjustments before any work proceeds. Operational checks shall be made when construction phasing changes and lighting plan changes are required to accommodate different phases of construction. Periodic checks will be made throughout the duration of nighttime operations. If the required illuminance levels are not met, the contractor shall make the necessary adjustments to the lighting plan before work continues. During construction operations, in the event of any failure of the lighting system, the operations shall be discontinued until the required level of illumination is restored.
713.11 Measurement.
713.11.1 Temporary Signs and Barricades : When the contract
does not include a pay item for “Temporary Signs and Barricades,” the provision of temporary construction signs, barricades, and related devices will be considered by the Department to be for the convenience of the contractor and will not be measured for payment.
713.10.5 Operational Requirements: Thirty days prior to the
start of night time operations, the contractor shall submit a lighting plan to the engineer for acceptance. The contractor shall select appropriate lighting systems and design a lighting plan to achieve the required illuminance levels. The lighting plan shall include location of lights necessary for every aspect of work; description of light equipment to be used; description of power source; attachment and mounting details for lights to be attached to equipment; technical details pertaining to the lighting fixtures; details on hoods, louvers, shields, or other glare control methods; and lighting calculations confirming that the illumination requirements will be met by the layout plan. Lighting inspection will include (1) light meter measurements to determine illumination levels, (2) subjective observation of the lighting setup to evaluate glare potential for drivers and workers, and (3) a physical check of the lighting equipment to ensure that it complies with the specification requirements included in the contractor’s lighting plan. Prior to the first night of operation, the engineer will check the adequacy of the installed lighting using a light meter. A summary of these measurements will be noted in the inspection records to provide a basis for comparing subsequent measurements. If the required illuminance levels are not met, the contractor shall make the necessary adjustments before any work proceeds. Operational checks shall be made when construction phasing changes and lighting plan changes are required to accommodate different phases of construction. Periodic checks will be made throughout the duration of nighttime operations. If the required illuminance levels are not met, the contractor shall make the necessary adjustments to the lighting plan before work continues. During construction operations, in the event of any failure of the lighting system, the operations shall be discontinued until the required level of illumination is restored.
713.11 Measurement.
713.11.1 Temporary Signs and Barricades : When the contract
does not include a pay item for “Temporary Signs and Barricades,” the provision of temporary construction signs, barricades, and related devices will be considered by the Department to be for the convenience of the contractor and will not be measured for payment.
713.10.5 Operational Requirements: Thirty days prior to the
start of night time operations, the contractor shall submit a lighting plan to the engineer for acceptance. The contractor shall select appropriate lighting systems and design a lighting plan to achieve the required illuminance levels. The lighting plan shall include location of lights necessary for every aspect of work; description of light equipment to be used; description of power source; attachment and mounting details for lights to be attached to equipment; technical details pertaining to the lighting fixtures; details on hoods, louvers, shields, or other glare control methods; and lighting calculations confirming that the illumination requirements will be met by the layout plan. Lighting inspection will include (1) light meter measurements to determine illumination levels, (2) subjective observation of the lighting setup to evaluate glare potential for drivers and workers, and (3) a physical check of the lighting equipment to ensure that it complies with the specification requirements included in the contractor’s lighting plan. Prior to the first night of operation, the engineer will check the adequacy of the installed lighting using a light meter. A summary of these measurements will be noted in the inspection records to provide a basis for comparing subsequent measurements. If the required illuminance levels are not met, the contractor shall make the necessary adjustments before any work proceeds. Operational checks shall be made when construction phasing changes and lighting plan changes are required to accommodate different phases of construction. Periodic checks will be made throughout the duration of nighttime operations. If the required illuminance levels are not met, the contractor shall make the necessary adjustments to the lighting plan before work continues. During construction operations, in the event of any failure of the lighting system, the operations shall be discontinued until the required level of illumination is restored.
713.11 Measurement.
713.11.1 Temporary Signs and Barricades : When the contract
does not include a pay item for “Temporary Signs and Barricades,” the provision of temporary construction signs, barricades, and related devices will be considered by the Department to be for the convenience of the contractor and will not be measured for payment.
713.10.5 Operational Requirements: Thirty days prior to the
start of night time operations, the contractor shall submit a lighting plan to the engineer for acceptance. The contractor shall select appropriate lighting systems and design a lighting plan to achieve the required illuminance levels. The lighting plan shall include location of lights necessary for every aspect of work; description of light equipment to be used; description of power source; attachment and mounting details for lights to be attached to equipment; technical details pertaining to the lighting fixtures; details on hoods, louvers, shields, or other glare control methods; and lighting calculations confirming that the illumination requirements will be met by the layout plan. Lighting inspection will include (1) light meter measurements to determine illumination levels, (2) subjective observation of the lighting setup to evaluate glare potential for drivers and workers, and (3) a physical check of the lighting equipment to ensure that it complies with the specification requirements included in the contractor’s lighting plan. Prior to the first night of operation, the engineer will check the adequacy of the installed lighting using a light meter. A summary of these measurements will be noted in the inspection records to provide a basis for comparing subsequent measurements. If the required illuminance levels are not met, the contractor shall make the necessary adjustments before any work proceeds. Operational checks shall be made when construction phasing changes and lighting plan changes are required to accommodate different phases of construction. Periodic checks will be made throughout the duration of nighttime operations. If the required illuminance levels are not met, the contractor shall make the necessary adjustments to the lighting plan before work continues. During construction operations, in the event of any failure of the lighting system, the operations shall be discontinued until the required level of illumination is restored.
713.11 Measurement.
713.11.1 Temporary Signs and Barricades : When the contract
does not include a pay item for “Temporary Signs and Barricades,” the provision of temporary construction signs, barricades, and related devices will be considered by the Department to be for the convenience of the contractor and will not be measured for payment. When including a pay item for “Temporary Signs and Barricades” in the contract, the furnishing, erecting, maintaining, and subsequent removing of temporary construction signs, barricades, and related devices will be measured on a lump sum basis. Flashing arrow boards will not be measured for separate payment, but will be included in the contract lump sum price for Temporary Signs and Barricades.
713.11.2 Temporary Pavement Markings : When the contract
does not include a pay item for Temporary Pavement Markings, provision of these markings will be con sidered by the Department to be for the convenience of the contractor and will not be measured for payment. When the contract includes an item for Temporary Pavement Markings, these markings’ acceptable furnishing, placing, maintenance, and subsequent rem oval will be measured by the linear foot or mile, as specified. When measuring by the linear foot of striping, measurement will be made for the material placed. Gaps will be excluded. When measuring by the mile of single strip per roadway per application, no deduction will be made for the standard design gaps in broken line striping; however, deductions will be made for the length of other gaps or omitted sections. Temporary pavement legends and symbols will be measured per each legend or symbol. Temporary reflectorized raised pavement markers will be measured per each marker furnished, placed, and accepted. Removal of temporary reflectorized raised pavement markers will not be measured for payment.
713.11.3 Temporary Precast Concrete Barriers : When the
contract does not include a pay item for Temporary Precast Concrete Barriers, the provision of these barriers will be considered by the Department to be for the convenience of the contractor and will not be measured for payment. Temporary Precast Concrete Barriers furnished by the contractor will be measured per each unit installed, which includes construction, delivery, furnishing, installing, maintaining, and removing each unit from the job site a single time. Temporary Precast Concrete Barriers (Department furnished) will be measured per each unit installed which includes collecting from the location specified, transporting, and delivering to the project site, and all costs of handling, maintaining, and returning each unit to the location specified or as directed. When including a pay item for “Temporary Signs and Barricades” in the contract, the furnishing, erecting, maintaining, and subsequent removing of temporary construction signs, barricades, and related devices will be measured on a lump sum basis. Flashing arrow boards will not be measured for separate payment, but will be included in the contract lump sum price for Temporary Signs and Barricades.
713.11.2 Temporary Pavement Markings : When the contract
does not include a pay item for Temporary Pavement Markings, provision of these markings will be con sidered by the Department to be for the convenience of the contractor and will not be measured for payment. When the contract includes an item for Temporary Pavement Markings, these markings’ acceptable furnishing, placing, maintenance, and subsequent rem oval will be measured by the linear foot or mile, as specified. When measuring by the linear foot of striping, measurement will be made for the material placed. Gaps will be excluded. When measuring by the mile of single strip per roadway per application, no deduction will be made for the standard design gaps in broken line striping; however, deductions will be made for the length of other gaps or omitted sections. Temporary pavement legends and symbols will be measured per each legend or symbol. Temporary reflectorized raised pavement markers will be measured per each marker furnished, placed, and accepted. Removal of temporary reflectorized raised pavement markers will not be measured for payment.
713.11.3 Temporary Precast Concrete Barriers : When the
contract does not include a pay item for Temporary Precast Concrete Barriers, the provision of these barriers will be considered by the Department to be for the convenience of the contractor and will not be measured for payment. Temporary Precast Concrete Barriers furnished by the contractor will be measured per each unit installed, which includes construction, delivery, furnishing, installing, maintaining, and removing each unit from the job site a single time. Temporary Precast Concrete Barriers (Department furnished) will be measured per each unit installed which includes collecting from the location specified, transporting, and delivering to the project site, and all costs of handling, maintaining, and returning each unit to the location specified or as directed. When including a pay item for “Temporary Signs and Barricades” in the contract, the furnishing, erecting, maintaining, and subsequent removing of temporary construction signs, barricades, and related devices will be measured on a lump sum basis. Flashing arrow boards will not be measured for separate payment, but will be included in the contract lump sum price for Temporary Signs and Barricades.
713.11.2 Temporary Pavement Markings : When the contract
does not include a pay item for Temporary Pavement Markings, provision of these markings will be con sidered by the Department to be for the convenience of the contractor and will not be measured for payment. When the contract includes an item for Temporary Pavement Markings, these markings’ acceptable furnishing, placing, maintenance, and subsequent rem oval will be measured by the linear foot or mile, as specified. When measuring by the linear foot of striping, measurement will be made for the material placed. Gaps will be excluded. When measuring by the mile of single strip per roadway per application, no deduction will be made for the standard design gaps in broken line striping; however, deductions will be made for the length of other gaps or omitted sections. Temporary pavement legends and symbols will be measured per each legend or symbol. Temporary reflectorized raised pavement markers will be measured per each marker furnished, placed, and accepted. Removal of temporary reflectorized raised pavement markers will not be measured for payment.
713.11.3 Temporary Precast Concrete Barriers : When the
contract does not include a pay item for Temporary Precast Concrete Barriers, the provision of these barriers will be considered by the Department to be for the convenience of the contractor and will not be measured for payment. Temporary Precast Concrete Barriers furnished by the contractor will be measured per each unit installed, which includes construction, delivery, furnishing, installing, maintaining, and removing each unit from the job site a single time. Temporary Precast Concrete Barriers (Department furnished) will be measured per each unit installed which includes collecting from the location specified, transporting, and delivering to the project site, and all costs of handling, maintaining, and returning each unit to the location specified or as directed. Further movements of barriers for subsequent construction phases will be measured per movement of each barrier.
713.11.4 Traffic Control Management : Traffic control
management will not be measured for payment.
713.11.5 Nighttime Construction Operations: Nighttime
construction operations will not be measured for payment.
713.12 PAYMENT. Payment for temporary construction signs,
barricades, and related devices will be at the contract lump sum price in accordance with the payment schedule of Table 713-2. Table 713 -2 Payment Schedule Temporary Signs, Barricades and Related Devices Percent of Total Contract Amount Earned Allowable Percent of Lump Sum Price for Temporary Signs and Barricades Initial Erection 40 25 60 50 80 75 95 100 100 Payment for temporary pavement markings will be made at the respective contract unit prices. Payment for temporary precast concrete barriers will be made at the contract unit price per each. The concrete in temporary precast barriers furnished by the contractor will be identified by lots and shall be subject to pay adjustments in accordance with Table 901-6 and Note 1 therein. Size, sampling, and testing of each concrete lot shall be in accordance with the Materials Sampling Manual. Payment for additional movements of temporary concrete barriers will be made per movement of each barrier when required in the plans and directed by the engineer. Payment for portable changeable message signs will be made at the contract unit price per each during the life of the contract . Payment will be made under: Further movements of barriers for subsequent construction phases will be measured per movement of each barrier.
713.11.4 Traffic Control Management : Traffic control
management will not be measured for payment.
713.11.5 Nighttime Construction Operations: Nighttime
construction operations will not be measured for payment.
713.12 PAYMENT. Payment for temporary construction signs,
barricades, and related devices will be at the contract lump sum price in accordance with the payment schedule of Table 713-2. Table 713 -2 Payment Schedule Temporary Signs, Barricades and Related Devices Percent of Total Contract Amount Earned Allowable Percent of Lump Sum Price for Temporary Signs and Barricades Initial Erection 40 25 60 50 80 75 95 100 100 Payment for temporary pavement markings will be made at the respective contract unit prices. Payment for temporary precast concrete barriers will be made at the contract unit price per each. The concrete in temporary precast barriers furnished by the contractor will be identified by lots and shall be subject to pay adjustments in accordance with Table 901-6 and Note 1 therein. Size, sampling, and testing of each concrete lot shall be in accordance with the Materials Sampling Manual. Payment for additional movements of temporary concrete barriers will be made per movement of each barrier when required in the plans and directed by the engineer. Payment for portable changeable message signs will be made at the contract unit price per each during the life of the contract . Payment will be made under: Further movements of barriers for subsequent construction phases will be measured per movement of each barrier.
713.11.4 Traffic Control Management : Traffic control
management will not be measured for payment.
713.11.5 Nighttime Construction Operations: Nighttime
construction operations will not be measured for payment.
713.12 PAYMENT. Payment for temporary construction signs,
barricades, and related devices will be at the contract lump sum price in accordance with the payment schedule of Table 713-2. Table 713 -2 Payment Schedule Temporary Signs, Barricades and Related Devices Percent of Total Contract Amount Earned Allowable Percent of Lump Sum Price for Temporary Signs and Barricades Initial Erection 40 25 60 50 80 75 95 100 100 Payment for temporary pavement markings will be made at the respective contract unit prices. Payment for temporary precast concrete barriers will be made at the contract unit price per each. The concrete in temporary precast barriers furnished by the contractor will be identified by lots and shall be subject to pay adjustments in accordance with Table 901-6 and Note 1 therein. Size, sampling, and testing of each concrete lot shall be in accordance with the Materials Sampling Manual. Payment for additional movements of temporary concrete barriers will be made per movement of each barrier when required in the plans and directed by the engineer. Payment for portable changeable message signs will be made at the contract unit price per each during the life of the contract . Payment will be made under: Further movements of barriers for subsequent construction phases will be measured per movement of each barrier.
713.11.4 Traffic Control Management : Traffic control
management will not be measured for payment.
713.11.5 Nighttime Construction Operations: Nighttime
construction operations will not be measured for payment.
713.12 PAYMENT. Payment for temporary construction signs,
barricades, and related devices will be at the contract lump sum price in accordance with the payment schedule of Table 713-2. Table 713 -2 Payment Schedule Temporary Signs, Barricades and Related Devices Percent of Total Contract Amount Earned Allowable Percent of Lump Sum Price for Temporary Signs and Barricades Initial Erection 40 25 60 50 80 75 95 100 100 Payment for temporary pavement markings will be made at the respective contract unit prices. Payment for temporary precast concrete barriers will be made at the contract unit price per each. The concrete in temporary precast barriers furnished by the contractor will be identified by lots and shall be subject to pay adjustments in accordance with Table 901-6 and Note 1 therein. Size, sampling, and testing of each concrete lot shall be in accordance with the Materials Sampling Manual. Payment for additional movements of temporary concrete barriers will be made per movement of each barrier when required in the plans and directed by the engineer. Payment for portable changeable message signs will be made at the contract unit price per each during the life of the contract . Payment will be made under: Item No. Pay Item Pay Unit 713-01 Temporary Signs and Barricades Lump Sum 713-02 Temporary Pavement Markings Linear Foot 713-03 Temporary Pavement Markings (Broken Line) Mile 713-04 Temporary Pavement Markings (Solid Line) Mile 713-05 Temporary Pavement Legends and Symbols Each 713-06 Temporary Reflectorized Raised Pavement Markers Each 713-07 Temporary Precast Concrete Barrier (Contractor Furnished) Each 713-08 Temporary Precast Concrete Barrier (Department Furnished) Each 713-09 Temporary Portable Barrier Each 713-10 Temporary Precast Concrete Barrier Movement Each 713-11 Portable Changeable Message Signs Each Section 714 Sodding
714.01 DESCRIPTION. Furnish, haul, plant, roll, water, and maintain
live grass sod at locations shown on the plans or as directed.
714.02 MATERIALS. Use approved sod consisting of either field grown
grass or nursery grown grass delivered in rolls or slabs. Field grown sod shall be Bermuda grass, carpet grass, or other approved grass native to the sodded area. Nursery grown sod shall be Centipede, Tifway Bermuda, Nomow Bermuda, Common Bermuda, or St. Augustine grass. Fertilizer shall comply with 1004.01 and agricultural lime shall comply with 1004.02 . Sod shall be free from noxious weeds or other vege tation. Obtain water from any source. Do not use brackish, chemically contaminated, or oily water.
714.03 GENERAL CONSTRUCTION REQUIREMENTS. Cut sod
with approved sod cutters. Mow the designated area when necessary. Cut sod to a minimum soil depth of 11/2 inches for field grown grass and 1 inch for nursery grown grass. Cut to a uniform width and in convenient lengths for handling. Retain soil on roots of sod when excavating, hauling, and planting. Obtain the services of an established soil testing entity to coordinate soil sampling, perform testing and analyses, and prepare recommendations for materials and procedures to be used during the pre- planting phase of new turf establishment. When practical, perform soil testing early enough to permit agricultural lime or other additives (if required) to be applied sufficiently in advance of planting so that the soil pH adjustment will occur before planting. Test and analyze samples to determine pH and fertility conditions. Use the test results and recommendations to determine the quantities of agricultural lime and fertilizer required for pre-planting applications. Furnish a copy of the test report with recommendations to the engineer. Testing will be at no direct pay. Consider probable time of application when making agricultural lime recommendations. Do not use sod cut more than 48 hours before placing unless authorized. Inferior appearing sod will not be accepted.