B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Traffic Control

725DESCRIPTION

LA · 2016 Standard SpecificationsBook pages 502503View official source ↗

Temporary Detour Roads

725.01 DESCRIPTION. Furnish construct, maintain, and subsequentl y

remove temporary detour roads . Plan details and specified materials for temporary detour roads indicate minimum requirements. Other approved designs and materials may be used at the option of the contractor.

725.02 MATERIALS. Materials for detour roads, except low profile

runarounds, shall comply with applicable sections of these specifications. Temporary culvert pipe shall be one of the types listed in Section 701 . Temporary fencing shall be of a type acceptable to the engineer. Temporary pavement markings shall comply with 1015.08 .

725.03 Construction Require Ments.

725.03.1 General : Perform all necessary additional clearing and

grubbing, and provide all necessary temporary fencing and culverts for detours. Place construction signs, warning devices, and pavement markings f or detours in accordance with Section 713 prior to opening to traffic. Maintain detours in a satisfactory condition.

725.03.2 Detour Roads : Furnish all embankment mater ial for

detours and compact embankments by approved methods to the satisfaction of the engineer. When embankment is placed against slopes of existing embankments, remove from such slopes all grass, weeds, trash, brush, and other objectionable material and construct slopes to form steps as directed. Perform base and wearing surface construction in accordance with applicable sections of these specifications. Place temporary pavement markings complying with Section 713 on detours surfaced with asphalt concrete or portland cement concrete. Place these markings before the detour is opened to traffic. Remove existing markings in tie-in areas. Include temporary pavement markings to make tie- ins to existing striping in the cost of these markings.

725.03.3 Low Profile Runaround : Surface low profile runaround

type detour roads with approved aggregate. Place aggregate surfacing to a minimum depth of 4 inches and a minimum width of 20 feet. Obtain the Temporary Detour Roads

725.01 DESCRIPTION. Furnish construct, maintain, and subsequentl y

remove temporary detour roads . Plan details and specified materials for temporary detour roads indicate minimum requirements. Other approved designs and materials may be used at the option of the contractor.

725.02 MATERIALS. Materials for detour roads, except low profile

runarounds, shall comply with applicable sections of these specifications. Temporary culvert pipe shall be one of the types listed in Section 701 . Temporary fencing shall be of a type acceptable to the engineer. Temporary pavement markings shall comply with 1015.08 .

725.03 Construction Require Ments.

725.03.1 General : Perform all necessary additional clearing and

grubbing, and provide all necessary temporary fencing and culverts for detours. Place construction signs, warning devices, and pavement markings f or detours in accordance with Section 713 prior to opening to traffic. Maintain detours in a satisfactory condition.

725.03.2 Detour Roads : Furnish all embankment mater ial for

detours and compact embankments by approved methods to the satisfaction of the engineer. When embankment is placed against slopes of existing embankments, remove from such slopes all grass, weeds, trash, brush, and other objectionable material and construct slopes to form steps as directed. Perform base and wearing surface construction in accordance with applicable sections of these specifications. Place temporary pavement markings complying with Section 713 on detours surfaced with asphalt concrete or portland cement concrete. Place these markings before the detour is opened to traffic. Remove existing markings in tie-in areas. Include temporary pavement markings to make tie- ins to existing striping in the cost of these markings.

725.03.3 Low Profile Runaround : Surface low profile runaround

type detour roads with approved aggregate. Place aggregate surfacing to a minimum depth of 4 inches and a minimum width of 20 feet. Obtain the Temporary Detour Roads

725.01 DESCRIPTION. Furnish construct, maintain, and subsequentl y

remove temporary detour roads . Plan details and specified materials for temporary detour roads indicate minimum requirements. Other approved designs and materials may be used at the option of the contractor.

725.02 MATERIALS. Materials for detour roads, except low profile

runarounds, shall comply with applicable sections of these specifications. Temporary culvert pipe shall be one of the types listed in Section 701 . Temporary fencing shall be of a type acceptable to the engineer. Temporary pavement markings shall comply with 1015.08 .

725.03 Construction Require Ments.

725.03.1 General : Perform all necessary additional clearing and

grubbing, and provide all necessary temporary fencing and culverts for detours. Place construction signs, warning devices, and pavement markings f or detours in accordance with Section 713 prior to opening to traffic. Maintain detours in a satisfactory condition.

725.03.2 Detour Roads : Furnish all embankment mater ial for

detours and compact embankments by approved methods to the satisfaction of the engineer. When embankment is placed against slopes of existing embankments, remove from such slopes all grass, weeds, trash, brush, and other objectionable material and construct slopes to form steps as directed. Perform base and wearing surface construction in accordance with applicable sections of these specifications. Place temporary pavement markings complying with Section 713 on detours surfaced with asphalt concrete or portland cement concrete. Place these markings before the detour is opened to traffic. Remove existing markings in tie-in areas. Include temporary pavement markings to make tie- ins to existing striping in the cost of these markings.

725.03.3 Low Profile Runaround : Surface low profile runaround

type detour roads with approved aggregate. Place aggregate surfacing to a minimum depth of 4 inches and a minimum width of 20 feet. Obtain the Temporary Detour Roads

725.01 DESCRIPTION. Furnish construct, maintain, and subsequentl y

remove temporary detour roads . Plan details and specified materials for temporary detour roads indicate minimum requirements. Other approved designs and materials may be used at the option of the contractor.

725.02 MATERIALS. Materials for detour roads, except low profile

runarounds, shall comply with applicable sections of these specifications. Temporary culvert pipe shall be one of the types listed in Section 701 . Temporary fencing shall be of a type acceptable to the engineer. Temporary pavement markings shall comply with 1015.08 .

725.03 Construction Require Ments.

725.03.1 General : Perform all necessary additional clearing and

grubbing, and provide all necessary temporary fencing and culverts for detours. Place construction signs, warning devices, and pavement markings f or detours in accordance with Section 713 prior to opening to traffic. Maintain detours in a satisfactory condition.

725.03.2 Detour Roads : Furnish all embankment mater ial for

detours and compact embankments by approved methods to the satisfaction of the engineer. When embankment is placed against slopes of existing embankments, remove from such slopes all grass, weeds, trash, brush, and other objectionable material and construct slopes to form steps as directed. Perform base and wearing surface construction in accordance with applicable sections of these specifications. Place temporary pavement markings complying with Section 713 on detours surfaced with asphalt concrete or portland cement concrete. Place these markings before the detour is opened to traffic. Remove existing markings in tie-in areas. Include temporary pavement markings to make tie- ins to existing striping in the cost of these markings.

725.03.3 Low Profile Runaround : Surface low profile runaround

type detour roads with approved aggregate. Place aggregate surfacing to a minimum depth of 4 inches and a minimum width of 20 feet. Obtain the Temporary Detour Roads

725.01 DESCRIPTION. Furnish construct, maintain, and subsequentl y

remove temporary detour roads . Plan details and specified materials for temporary detour roads indicate minimum requirements. Other approved designs and materials may be used at the option of the contractor.

725.02 MATERIALS. Materials for detour roads, except low profile

runarounds, shall comply with applicable sections of these specifications. Temporary culvert pipe shall be one of the types listed in Section 701 . Temporary fencing shall be of a type acceptable to the engineer. Temporary pavement markings shall comply with 1015.08 .

725.03 Construction Require Ments.

725.03.1 General : Perform all necessary additional clearing and

grubbing, and provide all necessary temporary fencing and culverts for detours. Place construction signs, warning devices, and pavement markings f or detours in accordance with Section 713 prior to opening to traffic. Maintain detours in a satisfactory condition.

725.03.2 Detour Roads : Furnish all embankment mater ial for

detours and compact embankments by approved methods to the satisfaction of the engineer. When embankment is placed against slopes of existing embankments, remove from such slopes all grass, weeds, trash, brush, and other objectionable material and construct slopes to form steps as directed. Perform base and wearing surface construction in accordance with applicable sections of these specifications. Place temporary pavement markings complying with Section 713 on detours surfaced with asphalt concrete or portland cement concrete. Place these markings before the detour is opened to traffic. Remove existing markings in tie-in areas. Include temporary pavement markings to make tie- ins to existing striping in the cost of these markings.

725.03.3 Low Profile Runaround : Surface low profile runaround

type detour roads with approved aggregate. Place aggregate surfacing to a minimum depth of 4 inches and a minimum width of 20 feet. Obtain the Temporary Detour Roads

725.01 DESCRIPTION. Furnish construct, maintain, and subsequentl y

remove temporary detour roads . Plan details and specified materials for temporary detour roads indicate minimum requirements. Other approved designs and materials may be used at the option of the contractor.

725.02 MATERIALS. Materials for detour roads, except low profile

runarounds, shall comply with applicable sections of these specifications. Temporary culvert pipe shall be one of the types listed in Section 701 . Temporary fencing shall be of a type acceptable to the engineer. Temporary pavement markings shall comply with 1015.08 .

725.03 Construction Require Ments.

725.03.1 General : Perform all necessary additional clearing and

grubbing, and provide all necessary temporary fencing and culverts for detours. Place construction signs, warning devices, and pavement markings f or detours in accordance with Section 713 prior to opening to traffic. Maintain detours in a satisfactory condition.

725.03.2 Detour Roads : Furnish all embankment mater ial for

detours and compact embankments by approved methods to the satisfaction of the engineer. When embankment is placed against slopes of existing embankments, remove from such slopes all grass, weeds, trash, brush, and other objectionable material and construct slopes to form steps as directed. Perform base and wearing surface construction in accordance with applicable sections of these specifications. Place temporary pavement markings complying with Section 713 on detours surfaced with asphalt concrete or portland cement concrete. Place these markings before the detour is opened to traffic. Remove existing markings in tie-in areas. Include temporary pavement markings to make tie- ins to existing striping in the cost of these markings.

725.03.3 Low Profile Runaround : Surface low profile runaround

type detour roads with approved aggregate. Place aggregate surfacing to a minimum depth of 4 inches and a minimum width of 20 feet. Obtain the engineer’s approval of alignment and grade of runaround type detour roads. Provide satisfactory drainage for low profile detours.

725.03.4 Detour Bridging : Construct and remove temporary detour

bridging in accordance with Section 817 .

725.04 REMOVAL OF DETOURS. Upon completion of permanent

construction and diversion of traffic thereto, remove detour roads, temporary fencing and culverts, eliminate construction scars, and seed and fertilize to restore the area to its original condition as directed. When not covered under other items, replace permanent fencing in kind as directed. Remove temporary markings on existing surfaces in accordance with Section 713 .

725.05 Measurement.

725.05.1 Detour Roads : Temporary detour roads will be measured

by the square yard of completed detour road surfacing.

725.05.2 Low Profile Runaround : Low profile runarounds will be

measured per each runaround.

725.05.3 Incidentals : Additional clearing and grubbing, temporary

fencing and culverts, will not be measured for payment. When the contr act does not include items for “ Temporary Pavement Markings, ” these markings will be included in the items for “Temporary Detour Roads.”

725.06 PAYMENT. Payment for temporary detour roads furnished,

constructed, maintained, and subsequently removed will be made at the contract unit prices under: Item No. Pay Item Pay Unit 725-01 Temporary Detour Roads Square Yard 725-02 Low Profile Runaround Each engineer’s approval of alignment and grade of runaround type detour roads. Provide satisfactory drainage for low profile detours.

725.03.4 Detour Bridging : Construct and remove temporary detour

bridging in accordance with Section 817 .

725.04 REMOVAL OF DETOURS. Upon completion of permanent

construction and diversion of traffic thereto, remove detour roads, temporary fencing and culverts, eliminate construction scars, and seed and fertilize to restore the area to its original condition as directed. When not covered under other items, replace permanent fencing in kind as directed. Remove temporary markings on existing surfaces in accordance with Section 713 .

725.05 Measurement.

725.05.1 Detour Roads : Temporary detour roads will be measured

by the square yard of completed detour road surfacing.

725.05.2 Low Profile Runaround : Low profile runarounds will be

measured per each runaround.

725.05.3 Incidentals : Additional clearing and grubbing, temporary

fencing and culverts, will not be measured for payment. When the contr act does not include items for “ Temporary Pavement Markings, ” these markings will be included in the items for “Temporary Detour Roads.”

725.06 PAYMENT. Payment for temporary detour roads furnished,

constructed, maintained, and subsequently removed will be made at the contract unit prices under: Item No. Pay Item Pay Unit 725-01 Temporary Detour Roads Square Yard 725-02 Low Profile Runaround Each engineer’s approval of alignment and grade of runaround type detour roads. Provide satisfactory drainage for low profile detours.

725.03.4 Detour Bridging : Construct and remove temporary detour

bridging in accordance with Section 817 .

725.04 REMOVAL OF DETOURS. Upon completion of permanent

construction and diversion of traffic thereto, remove detour roads, temporary fencing and culverts, eliminate construction scars, and seed and fertilize to restore the area to its original condition as directed. When not covered under other items, replace permanent fencing in kind as directed. Remove temporary markings on existing surfaces in accordance with Section 713 .

725.05 Measurement.

725.05.1 Detour Roads : Temporary detour roads will be measured

by the square yard of completed detour road surfacing.

725.05.2 Low Profile Runaround : Low profile runarounds will be

measured per each runaround.

725.05.3 Incidentals : Additional clearing and grubbing, temporary

fencing and culverts, will not be measured for payment. When the contr act does not include items for “ Temporary Pavement Markings, ” these markings will be included in the items for “Temporary Detour Roads.”

725.06 PAYMENT. Payment for temporary detour roads furnished,

constructed, maintained, and subsequently removed will be made at the contract unit prices under: Item No. Pay Item Pay Unit 725-01 Temporary Detour Roads Square Yard 725-02 Low Profile Runaround Each engineer’s approval of alignment and grade of runaround type detour roads. Provide satisfactory drainage for low profile detours.

725.03.4 Detour Bridging : Construct and remove temporary detour

bridging in accordance with Section 817 .

725.04 REMOVAL OF DETOURS. Upon completion of permanent

construction and diversion of traffic thereto, remove detour roads, temporary fencing and culverts, eliminate construction scars, and seed and fertilize to restore the area to its original condition as directed. When not covered under other items, replace permanent fencing in kind as directed. Remove temporary markings on existing surfaces in accordance with Section 713 .

725.05 Measurement.

725.05.1 Detour Roads : Temporary detour roads will be measured

by the square yard of completed detour road surfacing.

725.05.2 Low Profile Runaround : Low profile runarounds will be

measured per each runaround.

725.05.3 Incidentals : Additional clearing and grubbing, temporary

fencing and culverts, will not be measured for payment. When the contr act does not include items for “ Temporary Pavement Markings, ” these markings will be included in the items for “Temporary Detour Roads.”

725.06 PAYMENT. Payment for temporary detour roads furnished,

constructed, maintained, and subsequently removed will be made at the contract unit prices under: Item No. Pay Item Pay Unit 725-01 Temporary Detour Roads Square Yard 725-02 Low Profile Runaround Each engineer’s approval of alignment and grade of runaround type detour roads. Provide satisfactory drainage for low profile detours.

725.03.4 Detour Bridging : Construct and remove temporary detour

bridging in accordance with Section 817 .

725.04 REMOVAL OF DETOURS. Upon completion of permanent

construction and diversion of traffic thereto, remove detour roads, temporary fencing and culverts, eliminate construction scars, and seed and fertilize to restore the area to its original condition as directed. When not covered under other items, replace permanent fencing in kind as directed. Remove temporary markings on existing surfaces in accordance with Section 713 .

725.05 Measurement.

725.05.1 Detour Roads : Temporary detour roads will be measured

by the square yard of completed detour road surfacing.

725.05.2 Low Profile Runaround : Low profile runarounds will be

measured per each runaround.

725.05.3 Incidentals : Additional clearing and grubbing, temporary

fencing and culverts, will not be measured for payment. When the contr act does not include items for “ Temporary Pavement Markings, ” these markings will be included in the items for “Temporary Detour Roads.”

725.06 PAYMENT. Payment for temporary detour roads furnished,

constructed, maintained, and subsequently removed will be made at the contract unit prices under: Item No. Pay Item Pay Unit 725-01 Temporary Detour Roads Square Yard 725-02 Low Profile Runaround Each engineer’s approval of alignment and grade of runaround type detour roads. Provide satisfactory drainage for low profile detours.

725.03.4 Detour Bridging : Construct and remove temporary detour

bridging in accordance with Section 817 .

725.04 REMOVAL OF DETOURS. Upon completion of permanent

construction and diversion of traffic thereto, remove detour roads, temporary fencing and culverts, eliminate construction scars, and seed and fertilize to restore the area to its original condition as directed. When not covered under other items, replace permanent fencing in kind as directed. Remove temporary markings on existing surfaces in accordance with Section 713 .

725.05 Measurement.

725.05.1 Detour Roads : Temporary detour roads will be measured

by the square yard of completed detour road surfacing.

725.05.2 Low Profile Runaround : Low profile runarounds will be

measured per each runaround.

725.05.3 Incidentals : Additional clearing and grubbing, temporary

fencing and culverts, will not be measured for payment. When the contr act does not include items for “ Temporary Pavement Markings, ” these markings will be included in the items for “Temporary Detour Roads.”

725.06 PAYMENT. Payment for temporary detour roads furnished,

constructed, maintained, and subsequently removed will be made at the contract unit prices under: Item No. Pay Item Pay Unit 725-01 Temporary Detour Roads Square Yard 725-02 Low Profile Runaround Each engineer’s approval of alignment and grade of runaround type detour roads. Provide satisfactory drainage for low profile detours.

725.03.4 Detour Bridging : Construct and remove temporary detour

bridging in accordance with Section 817 .

725.04 REMOVAL OF DETOURS. Upon completion of permanent

construction and diversion of traffic thereto, remove detour roads, temporary fencing and culverts, eliminate construction scars, and seed and fertilize to restore the area to its original condition as directed. When not covered under other items, replace permanent fencing in kind as directed. Remove temporary markings on existing surfaces in accordance with Section 713 .

725.05 Measurement.

725.05.1 Detour Roads : Temporary detour roads will be measured

by the square yard of completed detour road surfacing.

725.05.2 Low Profile Runaround : Low profile runarounds will be

measured per each runaround.

725.05.3 Incidentals : Additional clearing and grubbing, temporary

fencing and culverts, will not be measured for payment. When the contr act does not include items for “ Temporary Pavement Markings, ” these markings will be included in the items for “Temporary Detour Roads.”

725.06 PAYMENT. Payment for temporary detour roads furnished,

constructed, maintained, and subsequently removed will be made at the contract unit prices under: Item No. Pay Item Pay Unit 725-01 Temporary Detour Roads Square Yard 725-02 Low Profile Runaround Each engineer’s approval of alignment and grade of runaround type detour roads. Provide satisfactory drainage for low profile detours.

725.03.4 Detour Bridging : Construct and remove temporary detour

bridging in accordance with Section 817 .

725.04 REMOVAL OF DETOURS. Upon completion of permanent

construction and diversion of traffic thereto, remove detour roads, temporary fencing and culverts, eliminate construction scars, and seed and fertilize to restore the area to its original condition as directed. When not covered under other items, replace permanent fencing in kind as directed. Remove temporary markings on existing surfaces in accordance with Section 713 .

725.05 Measurement.

725.05.1 Detour Roads : Temporary detour roads will be measured

by the square yard of completed detour road surfacing.

725.05.2 Low Profile Runaround : Low profile runarounds will be

measured per each runaround.

725.05.3 Incidentals : Additional clearing and grubbing, temporary

fencing and culverts, will not be measured for payment. When the contr act does not include items for “ Temporary Pavement Markings, ” these markings will be included in the items for “Temporary Detour Roads.”

725.06 PAYMENT. Payment for temporary detour roads furnished,

constructed, maintained, and subsequently removed will be made at the contract unit prices under: Item No. Pay Item Pay Unit 725-01 Temporary Detour Roads Square Yard 725-02 Low Profile Runaround Each Section 726 Bedding Material

726.01 DESCRIPTION. Furnish and place aggregate bedding material

on geotextile fabric for drainage structures .

726.02 MATERIALS. Materials shall comply with the following

subsections: Plastic Soil Blanket 203.10 Bedding Material 1003.10 Geotextile Fabric 1019.01

726.03 PLACEMENT OF BEDDING . Place geotextile fabric in

accordance with plan details prior to placing bedding material. Properly proportion and mix bedding materials prior to placement in the foundation. Take care to prevent damage to geotextile fabric during placement of bedding material. Place, shape, and uniformly compact bedding material to the satisfaction of the engineer. Overlap or sew adjacent rolls of geotextile fabric. When rolls are overlapped , overlap a minimum of 18 inches , including the ends of the rolls. Assure that the top layer of the fabric is parallel with adjacent rolls and in the direction of bedding materials placement. When rolls are sewn, join adjacent rolls by sewing with thread made of polyester or a material with equivalent strength and durability. When field sewing, employ the J-seam or “Butterfly” seam with the two pieces of geotextile fabric mated together and turned in order to sew through four layers of fabric. Sew with 2 rows of Type 401, two-threaded locking chain stitch. Submit factory seams other than specified to the Materials and Testing Section for approval. When the ground is covered with water or supersaturated soil, sew the fabric. Remove damaged fabric and replace with new fabric or cover with a second layer of fabric extending two feet in each direction from the damaged area. Use material excavated below the established grade of the structure or dispose of it in accordance with Section 203 . Place a plastic soil blanket in accordance with 203.10 at structure ends when bedding material is exposed.

Source: Louisiana Standard Specifications for Roads and Bridges, 2016 Edition. Pages 502503 of 1,145.