Jacked or Bored Pipe
728.01 DESCRIPTION. Furnish and install pipe in embankments at the
locations shown on the plans by jacking or boring in accordance with these specifications.
728.02 MATERIALS. Pipe materials shall comply with 701.02 and
1018.03 Pipe joints shall comply with 701.06 . Corrugated metal pipe to
be jacked or bored shall have corrugated bands a minimum of 24 inches wide with four lines of approved gasket material. Secure these bands by a minimum of four galvanized steel rods and lugs in accordance with the plans and as directed.
728.03 CONSTRUCTION REQUIRE MENTS. In general, jack pipes
30 inches diameter and greater and bore pipes less than 30 inches diameter. Begin the work at the outfall end of pipe when possible. When the grade at the jacking or boring end is below ground surface, excavate suitable pits or trenches for conducting operations and placing joints of pipe. Provide adequate sheeting and bracing to prevent earth caving. For pipe with bell joints, if the outside diameter of the pipe bell exceeds the outside diameter of the pipe barrel by more than 1 inch , either case the pipe or pressure grout its full length. Furnish and install an approved type and size casing, in accordance with these specifications. Pressure grout with approved materials placed by approved methods. The method used shall not weaken or damage the embankment. Provide for approval a plan showing the proposed procedure, including backstop or jacking frame arrangement, pipe guides, position of jacks, and jacking head. Approval of this plan shall not relieve the contractor from responsibility for obtaining the desired result.
728.03.1 Jacking : Provide heavy duty jacks suitable for forcing pipe
through the embankment. Apply equal pressure to all jacks and transmit the pressure to the pipe end through a jacking head. Design the jacking head so that pressure is uniformly applied around the ring of the pipe. Provide a backstop or jacking frame to adequately resist pressure of the jacks under load. Set pipe on guides properly fastened together to support Jacked or Bored Pipe
728.01 DESCRIPTION. Furnish and install pipe in embankments at the
locations shown on the plans by jacking or boring in accordance with these specifications.
728.02 MATERIALS. Pipe materials shall comply with 701.02 and
1018.03 Pipe joints shall comply with 701.06 . Corrugated metal pipe to
be jacked or bored shall have corrugated bands a minimum of 24 inches wide with four lines of approved gasket material. Secure these bands by a minimum of four galvanized steel rods and lugs in accordance with the plans and as directed.
728.03 CONSTRUCTION REQUIRE MENTS. In general, jack pipes
30 inches diameter and greater and bore pipes less than 30 inches diameter. Begin the work at the outfall end of pipe when possible. When the grade at the jacking or boring end is below ground surface, excavate suitable pits or trenches for conducting operations and placing joints of pipe. Provide adequate sheeting and bracing to prevent earth caving. For pipe with bell joints, if the outside diameter of the pipe bell exceeds the outside diameter of the pipe barrel by more than 1 inch , either case the pipe or pressure grout its full length. Furnish and install an approved type and size casing, in accordance with these specifications. Pressure grout with approved materials placed by approved methods. The method used shall not weaken or damage the embankment. Provide for approval a plan showing the proposed procedure, including backstop or jacking frame arrangement, pipe guides, position of jacks, and jacking head. Approval of this plan shall not relieve the contractor from responsibility for obtaining the desired result.
728.03.1 Jacking : Provide heavy duty jacks suitable for forcing pipe
through the embankment. Apply equal pressure to all jacks and transmit the pressure to the pipe end through a jacking head. Design the jacking head so that pressure is uniformly applied around the ring of the pipe. Provide a backstop or jacking frame to adequately resist pressure of the jacks under load. Set pipe on guides properly fastened together to support Jacked or Bored Pipe
728.01 DESCRIPTION. Furnish and install pipe in embankments at the
locations shown on the plans by jacking or boring in accordance with these specifications.
728.02 MATERIALS. Pipe materials shall comply with 701.02 and
1018.03 Pipe joints shall comply with 701.06 . Corrugated metal pipe to
be jacked or bored shall have corrugated bands a minimum of 24 inches wide with four lines of approved gasket material. Secure these bands by a minimum of four galvanized steel rods and lugs in accordance with the plans and as directed.
728.03 CONSTRUCTION REQUIRE MENTS. In general, jack pipes
30 inches diameter and greater and bore pipes less than 30 inches diameter. Begin the work at the outfall end of pipe when possible. When the grade at the jacking or boring end is below ground surface, excavate suitable pits or trenches for conducting operations and placing joints of pipe. Provide adequate sheeting and bracing to prevent earth caving. For pipe with bell joints, if the outside diameter of the pipe bell exceeds the outside diameter of the pipe barrel by more than 1 inch , either case the pipe or pressure grout its full length. Furnish and install an approved type and size casing, in accordance with these specifications. Pressure grout with approved materials placed by approved methods. The method used shall not weaken or damage the embankment. Provide for approval a plan showing the proposed procedure, including backstop or jacking frame arrangement, pipe guides, position of jacks, and jacking head. Approval of this plan shall not relieve the contractor from responsibility for obtaining the desired result.
728.03.1 Jacking : Provide heavy duty jacks suitable for forcing pipe
through the embankment. Apply equal pressure to all jacks and transmit the pressure to the pipe end through a jacking head. Design the jacking head so that pressure is uniformly applied around the ring of the pipe. Provide a backstop or jacking frame to adequately resist pressure of the jacks under load. Set pipe on guides properly fastened together to support Jacked or Bored Pipe
728.01 DESCRIPTION. Furnish and install pipe in embankments at the
locations shown on the plans by jacking or boring in accordance with these specifications.
728.02 MATERIALS. Pipe materials shall comply with 701.02 and
1018.03 Pipe joints shall comply with 701.06 . Corrugated metal pipe to
be jacked or bored shall have corrugated bands a minimum of 24 inches wide with four lines of approved gasket material. Secure these bands by a minimum of four galvanized steel rods and lugs in accordance with the plans and as directed.
728.03 CONSTRUCTION REQUIRE MENTS. In general, jack pipes
30 inches diameter and greater and bore pipes less than 30 inches diameter. Begin the work at the outfall end of pipe when possible. When the grade at the jacking or boring end is below ground surface, excavate suitable pits or trenches for conducting operations and placing joints of pipe. Provide adequate sheeting and bracing to prevent earth caving. For pipe with bell joints, if the outside diameter of the pipe bell exceeds the outside diameter of the pipe barrel by more than 1 inch , either case the pipe or pressure grout its full length. Furnish and install an approved type and size casing, in accordance with these specifications. Pressure grout with approved materials placed by approved methods. The method used shall not weaken or damage the embankment. Provide for approval a plan showing the proposed procedure, including backstop or jacking frame arrangement, pipe guides, position of jacks, and jacking head. Approval of this plan shall not relieve the contractor from responsibility for obtaining the desired result.
728.03.1 Jacking : Provide heavy duty jacks suitable for forcing pipe
through the embankment. Apply equal pressure to all jacks and transmit the pressure to the pipe end through a jacking head. Design the jacking head so that pressure is uniformly applied around the ring of the pipe. Provide a backstop or jacking frame to adequately resist pressure of the jacks under load. Set pipe on guides properly fastened together to support the pipe in the proper direction at correct grade. Provide suitable cushioning material, such as plywood, between sections of concrete pipe. Excavate material ahead of the pipe and remove through the pipe. Do not extend excavation more than 24 inches beyond the forward end of pipe. When the character of embankment material dictates, reduce the excavation distance to prevent the embankment from being damaged. Dispose of excavated material in accordance with 202.02 . When excavating on the underside of pipe, conform to the contour and grade of the pipe for at least one -third the circumference of pipe. Provide a clearance of not more than 2 inches for the upper half of pipe, tapered to zero at the point where excavation conforms to the contour of pipe. Construct a steel cutting edge around the forward end of pipe that will transmit pressures uniformly around the ring of the pipe. Continue jacking without interruption to prevent pipe from becoming firmly set in the embankment. Do not allow pipe to vary horizontally or vertically by more than 1/4 inch per 10 feet from established line and grade. Any variation shall be regular; no abrupt changes in direction will be permitted. Remove and replace any pipe damaged or misaligned in jacking operations at no direct pay.
728.03.2 Boring : Bore mechanically, using a pilot hole
approximately 2 inches in diameter. Extend the pilot hole through the embankment and check for line and grade before boring begins. Maintain the same line and grade variations as specified for jacking. Use the pilot hole as the centerline of the larger diameter hole to be bored. Use water and other fluids with boring operations only to lubricate cuttings. Jetting will not be permitted. In unconsolidated soil formations, a gel-forming colloidal drilling fluid consisting of at least 10 percent high-grade bentonite may be used to consolidate cuttings of the bit, seal walls, and provide support of the hole, and furnish lubrication for subsequent removal of cuttings and installation of pipe. Remedy overcutting in excess of 1 inch by pressure grouting the entire length of the installation. Join pipe in accordance with Section 701 .
728.04 MEASUREMENT. Quantities of jacked or bored pipe for
payment will be the design lengt hs in linear feet as shown on the plans. Design quantities will be adjusted if the engineer makes changes to adjust to field conditions, if plan errors are proven, or if design changes are made. the pipe in the proper direction at correct grade. Provide suitable cushioning material, such as plywood, between sections of concrete pipe. Excavate material ahead of the pipe and remove through the pipe. Do not extend excavation more than 24 inches beyond the forward end of pipe. When the character of embankment material dictates, reduce the excavation distance to prevent the embankment from being damaged. Dispose of excavated material in accordance with 202.02 . When excavating on the underside of pipe, conform to the contour and grade of the pipe for at least one -third the circumference of pipe. Provide a clearance of not more than 2 inches for the upper half of pipe, tapered to zero at the point where excavation conforms to the contour of pipe. Construct a steel cutting edge around the forward end of pipe that will transmit pressures uniformly around the ring of the pipe. Continue jacking without interruption to prevent pipe from becoming firmly set in the embankment. Do not allow pipe to vary horizontally or vertically by more than 1/4 inch per 10 feet from established line and grade. Any variation shall be regular; no abrupt changes in direction will be permitted. Remove and replace any pipe damaged or misaligned in jacking operations at no direct pay.
728.03.2 Boring : Bore mechanically, using a pilot hole
approximately 2 inches in diameter. Extend the pilot hole through the embankment and check for line and grade before boring begins. Maintain the same line and grade variations as specified for jacking. Use the pilot hole as the centerline of the larger diameter hole to be bored. Use water and other fluids with boring operations only to lubricate cuttings. Jetting will not be permitted. In unconsolidated soil formations, a gel-forming colloidal drilling fluid consisting of at least 10 percent high-grade bentonite may be used to consolidate cuttings of the bit, seal walls, and provide support of the hole, and furnish lubrication for subsequent removal of cuttings and installation of pipe. Remedy overcutting in excess of 1 inch by pressure grouting the entire length of the installation. Join pipe in accordance with Section 701 .
728.04 MEASUREMENT. Quantities of jacked or bored pipe for
payment will be the design lengt hs in linear feet as shown on the plans. Design quantities will be adjusted if the engineer makes changes to adjust to field conditions, if plan errors are proven, or if design changes are made. the pipe in the proper direction at correct grade. Provide suitable cushioning material, such as plywood, between sections of concrete pipe. Excavate material ahead of the pipe and remove through the pipe. Do not extend excavation more than 24 inches beyond the forward end of pipe. When the character of embankment material dictates, reduce the excavation distance to prevent the embankment from being damaged. Dispose of excavated material in accordance with 202.02 . When excavating on the underside of pipe, conform to the contour and grade of the pipe for at least one -third the circumference of pipe. Provide a clearance of not more than 2 inches for the upper half of pipe, tapered to zero at the point where excavation conforms to the contour of pipe. Construct a steel cutting edge around the forward end of pipe that will transmit pressures uniformly around the ring of the pipe. Continue jacking without interruption to prevent pipe from becoming firmly set in the embankment. Do not allow pipe to vary horizontally or vertically by more than 1/4 inch per 10 feet from established line and grade. Any variation shall be regular; no abrupt changes in direction will be permitted. Remove and replace any pipe damaged or misaligned in jacking operations at no direct pay.
728.03.2 Boring : Bore mechanically, using a pilot hole
approximately 2 inches in diameter. Extend the pilot hole through the embankment and check for line and grade before boring begins. Maintain the same line and grade variations as specified for jacking. Use the pilot hole as the centerline of the larger diameter hole to be bored. Use water and other fluids with boring operations only to lubricate cuttings. Jetting will not be permitted. In unconsolidated soil formations, a gel-forming colloidal drilling fluid consisting of at least 10 percent high-grade bentonite may be used to consolidate cuttings of the bit, seal walls, and provide support of the hole, and furnish lubrication for subsequent removal of cuttings and installation of pipe. Remedy overcutting in excess of 1 inch by pressure grouting the entire length of the installation. Join pipe in accordance with Section 701 .
728.04 MEASUREMENT. Quantities of jacked or bored pipe for
payment will be the design lengt hs in linear feet as shown on the plans. Design quantities will be adjusted if the engineer makes changes to adjust to field conditions, if plan errors are proven, or if design changes are made. Required excavation, sheeting, bracing, falsework, casing, joint materials, and grouting will not be measured for payment.
728.05 PAYMENT. Payment for jacked or bored pipe will be made at
the contract unit price per linear foot , which includes all labor, materials, equipment, tools, and incidentals necessary to complete the work. Payment will be made under: Item No. Pay Item Pay Unit 728-01 Jacked or Bored Pipe Linear Foot Required excavation, sheeting, bracing, falsework, casing, joint materials, and grouting will not be measured for payment.
728.05 PAYMENT. Payment for jacked or bored pipe will be made at
the contract unit price per linear foot , which includes all labor, materials, equipment, tools, and incidentals necessary to complete the work. Payment will be made under: Item No. Pay Item Pay Unit 728-01 Jacked or Bored Pipe Linear Foot Section 729 Permanent Signs
729.01 DESCRIPTION. Furnish and install traffic signs, dead end road
installations, markers and delineators, with accessories, posts , and overhead spans of specified materials, sizes, shapes, weights , and designs. In general, the work and materials comply with the MUTCD as modified by these specifications or as shown on the plans. Fabricate signs in an approved plant. The term “legend” shall mean border strip, letters, numerals, and symbols which convey the message on signs.
729.02 MATERIALS. Other than recycled aluminum sign panels and
blanks, all materials shall be new stock conforming to the following:
729.02.1 Sign and Marker Sheeting : Sheeting material for sign
panels, delineators, barricades, and other markers shall comply with Section 1015 . All permanent signs shall meet the requirements of DO TD Type X.
729.02.2 Ferrous Metal: Ferrous metals shall comp ly with
1015.02.1 Reinforcing steel shall comply with Section 1009 . Ferrous
metal, except reinforcing steel, shall be galvanized in accordance with Section 811 .
729.02.3 Aluminum: Aluminum alloys for structural members shall
comply with 1015.02. 2. Aluminum sign panels shall comply with
1015.04.1 .
729.02.4 Fittings: Structural bolts, nuts, washers , and miscellaneous
hardware shall compl y with 1015.02.3 .
729.02.5 Guard Rail: Guard rail materials for dead end road
installations shall comply with Section 1010 .
729.02.6 Timber : Treated piling and timber for barricades in dead
end road installat ions shall comply with Section 1014 .
729.02.7 Concrete : Concrete shall be Class M complying with
Section 901 .