609 — SHOULDER EDGE DROP OFF GRADING ADJUSTMENT 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS. CATEGORY 600 SHOULDERS SECTION 609 — SHOULDER EDGE DROP OFF GRADING ADJUSTMENT

609.01 Description

Construct the area adjacent to the outside edge of the shoulder to eliminate the shoulder edge drop off.

609.02 Materials

Refer to 605.02, 701.02, 705.02, 708.02, 709.02, and the following: Crusher Run Aggregate CR-6 901.01 Salvaged Topsoil 920.01.01 Furnished Topsoil 920.01.02 Asphalt Millings or Grindings Size of individual particles shall be less than 2 in. as determined visually.

609.03 Construction

When the outside edge of the shoulder is greater than 2-1/2 in. above the existing groundline, place a wedge of topsoil installed as specified in Section 701, or crusher run aggregate CR-6, or asphalt millings or grindings, in designated areas as specified or as directed. Grade the topsoil, or crusher run aggregate CR-6, or asphalt millings or grindings, to a slope of 4:1 or as directed. Compact the material as specified or as directed. Immediately after grading topsoil, perform either of the following as specified or as directed:

a.Perform Turfgrass Establishment as specified in Section 705 and immediately install Type A or Type E Soil Stabilization Matting as specified in Section 709.
b.Perform Turfgrass Sod Establishment as specified in Section 708. Complete the grading adjustment and install all materials by the end of the day that the drop off is created and prior to opening to traffic. The material, lines and grades, and the cross section shall be as specified. 609 — SHOULDER EDGE DROP OFF GRADING ADJUSTMENT 2026 STANDARD SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS.

609.04 Measurement and Payment

The payment will be full compensation for all material, labor, equipment, tools, disposal fees and incidentals necessary to complete the work.

609.04.01 Placing Salvaged Topsoil for Grading Adjustment or Placing Furnished Topsoil for

Grading Adjustment will be measured and paid for at the Contract unit price per square yard, or as specified.

609.04.02 Crusher Run Aggregate CR-6 or Asphalt Millings or Grindings for Shoulder Edge Drop

Off will be measured and paid for at the Contract unit price per square yard, or per ton.

609.04.03 Turfgrass Sod Establishment or Turfgrass Establishment will be measured and paid for

at the Contract unit price per square yard.

609.04.04 Type A Soil Stabilization Matting or Type E Soil Stabilization Matting will be

measured and paid for at the Contract unit price per square yard.

Get an email when 609 changes

Maryland revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Construction and Materials, 2026 Edition. Pages 795–796 of 1,138. View official source ↗

Ask about this section

Scoped to Maryland Standard Specifications for Construction and Materials, Section 609 — Shoulder Edge Drop Off Grading Adjustment. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.