2-1 Division 2 – Earthwork
Section 201. Clearing ........................................................................................ 2-3 Section 202. Removing Trees, Stumps, and Corduroy ...................................... 2-7 Section 203. Removing Drainage Structures, Culverts, and Sewers ................. 2-9 Section 204. Removing Miscellaneous Structures and Materials .................... 2-12 Section 205. Roadway Earthwork ................................................................... 2-18 Section 206. Excavation and Backfill for Structures ........................................ 2-36 Section 207. Obliterating Roadway ................................................................. 2-40 Section 208. Soil Erosion and Sedimentation Control ..................................... 2-41 Section 209. Project Cleanup .......................................................................... 2-49
2-2 Notes
2-3 Section 201. Clearing
201.01. Description This work consists of clearing, selectively thinning, clearing for fence, and applying growth preventive material if required. 201.02. Materials Provide materials in accordance with the following section : Growth Preventive Material .............................................................. 917 The M DARD must certify the applicator that is used to apply growth preventive material . Provide certificat ion to the Engineer prior to the application. 201.03. Construction
2-4 Salvage marketable timber in accordance with the following:
2-5 The plans will show or the Engineer will direct trees and areas of
undergrowth for removal by selective thinning. The Engineer will not consider this work complete until the Engineer’s acceptance of the project. Perform selective thinning in accordance with the following:
2-6 areas designated on the plans is included in the unit price for related pay
items unless clearing is a separate pay item. If the Engineer directs clearing not shown on the plans beyond 10 feet outside the limits of earth disturbance in non -State -provided borrow areas, or in clear vision areas, and the contract provides no separate pay item for Clearing , the Department will pay for this clearing as extra work. If the Engineer directs the Contractor to return to perform additional clearing of areas less than ½ acre after the Engineer accepted the clearing of an area, the Department will pay for this clearing as extra work.