2-49 Section 209. Project Cleanup
209.01 Description
This work consists of removing and disposing of debris including fences, fallen timber, logs, guardrail sections and posts, rocks, boulders, and other rubbish from the Contractor’s operations within the project limits in accordance with section 201 and section 205.
209.02 Materials
None specified.
209.03 Construction
Provide project cleanup as an ongoing operation. Perform project cleanup within the right -of-way but over an area no greater than 50 feet beyond the limits of earth disturbance for the length of the project. Fill holes and ruts resulting from construction operations with Department -approved material. Compact and level filler materials and restore ruts and holes to the surrounding contour in accordance with section 816 or as directed by the Engineer. Clean existing culverts, sewer s, or drainage structures that contain sediment or debris from the construction operation.
209.04 Measurement and Payment
Pay Item Pay Unit Project Cleanup ............................................................................... Lump Sum The Department will pay for Project Cleanup upon completion of the cleanup operation. If the contr act does not include a pay item for Project Cleanup , the Department will consider the cost of this work to be included in the contract unit prices for other relevant pay items.