3-1 DIVISION 3 - BASES Section 301. Subbase ....................................................................................... 3-3 Section 302. Aggregate Base Course ............................................................... 3-4 Section 303. Open-Graded Drainage Courses .................................................. 3-8 Section 304. Rubblizing Portland Cement Concrete Pavement ...................... 3-14 Section 305. HMA Base Crushing and Shaping .............................................. 3-19 Section 306. Aggregate Surface Course and Maintenance Grav el ................. 3-22 Section 307. Aggregate Shoulders and Approaches ....................................... 3-26 Section 308. Geosynthetics for Base .............................................................. 3-30 3-2 NOTES 3-3 Section 301. Subbase

301.01 Description

This work consists of constructing a granular subbase on a surface approved by the Engineer.

301.02 Materials

Provide material in accordance with the following section: Granular Material Class II ..................................................................... 902

301.03 Construction

Spread the subbase material evenly and compact to at least 95% of the maximum unit weight, at a less -than-optimum moisture content, for its entire thickness. Place the subbase in layers no greater than 18 inches. Where the required depth is more than 18 inches, place the material in layers of equal thickness. Construct the subbase to plan grade within a tolerance of plus 1 inch. Do not place subbase on frozen, soft, unstable, or rutted subgrade. If subbase material becomes mixed with subgrade material, remove, dispose of, and replace the subbase material at no additional cost to the Department.

301.04 Measurement and Payment

Pay Item Pay Unit Subbase, LM ................................................................................... Cubic Yard Subbase, CIP .................................................................................. Cubic Yard

A.Subbase, LM. The Engineer will measure Subbase, LM based on hauling unit dimensions and load count before placement and compaction. The unit price for Subbase, LM includes the cost of providing, hauling, placing, compacting, and grading the material.
B.Subbase, CIP. The Engineer will measure Subbase, CIP by the staked-section method as described in subsection 205.04. The unit price for Subbase, CIP includes the cost of providing, hauling, placing, compacting and grading the material.

Get an email when 301 changes

Michigan revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Michigan Standard Specifications for Construction, 2020 Edition. Pages 176–178 of 1,146. View official source ↗

Ask about this section

Scoped to Michigan 2020 Standard Specifications for Construction, Section 301 — Subbase. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.