717Flexible Joint Systems

MO · 2026 (Oct) Standard Specifications✓ Full text on BuildSpecBook pages 463–468 Save this section

Ask about Section 717

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

717 FLEXIBLE J OINT SYSTEMS

717.10.1 Description. This work shall consist of furnishing and installing a preformed compression seal for

joints as shown on the plans or as directed by the engineer. Structural steel for the joints shall be furnished and installed as shown on the plans.

.2 Material. All material shall be in accordance with Division 1000, Material Details, and specifically as

follows: Item Section Preformed Compression Seals 1073

.3 Construction Requirements

.3.1 Shop Drawings. Shop drawings for structural steel for expansion joint systems shall be prepared in

accordance with Sec 1080. The dimensions of the seal shall be shown on the shop drawings for the armored joint. Shop drawings will not be required when the seal is placed against concrete or existing steel armor.

.3.2 Installation. The preformed compression seal shall be installed in joints in one continuous piece

without field splices. Factory splicing will be permitted for joints in excess of 53 feet. The area of steel armor to come in contact with preformed compression seal lubricant adhesive shall be sand blasted prior to installing the seal. Sand blasting will be considered acceptable when the steel surfaces have been cleaned to an SSPC-SP10 degree of cleanliness. Clean-up and disposal of blast material shall be in accordance with Sec 202.3.1.3. The lubricant adhesive shall be applied in a continuous film to the sides of the seal and to the joint surfaces just prior to placing the seal in the joint. The seal shall be installed with an installation tool recommended by the manufacturer, in a manner that prevents the seal from being damaged and from being in tension. Twisting, curling and nicking the seal will be prohibited. Lubricant adhesive on top of the installed seal shall be removed before drying. Unless the installation tool is capable of installing the seal without elongation prior to placement, the seal shall be pre-cut to the exact length for the joint plus ends as shown in the contract documents. The pre- cut seal shall be installed and measured for stretch. The seal shall be removed and reinstalled if the seal stretch length exceeds five percent of the pre-cut length.

.4 Method of Measurement. Final measurement will not be made except for authorized changes during

construction or where significant errors are found in the contract quantity. Where required, the preformed compression seal will be measured to the nearest linear foot based on measurement from roadway face of curb to roadway face of curb along the centerline of the joint. The revision or correction will be computed and added to or deducted from the contract quantity. No measurement will be made of portions of the joint that extend past the roadway face of curbs.

.5. Basis of Payment. Preformed compression seals, including all material, coating, equipment, labor,

fabrication, installation and any other incidental work necessary to complete this work, will be paid for at the contract unit price. SECTION 717.20 STRIP SEAL.

717.20.1 Description. This work shall consist of furnishing and installing a watertight strip seal for joints as

shown on the plans or as directed by the engineer. The structural steel for the joints shall be furnished and installed as shown on the plans.

.2 Material. All material shall be in accordance with Division 1000, Material Details, and specifically as

follows: Item Section Strip Seal 1073 463

.3 Construction Requirements

.3.1 Shop Drawings. Shop drawings for structural steel for expansion joint systems shall be prepared in

accordance with Sec 1080. The drawings shall show in detail the type, size, location of anchors, and sequence of installation. The dimensions of the seal shall be shown on the shop drawings for the armored joint. The cavity in the steel armor (also known as an extrusion) shall be of a dimensional tolerance that prevents the lug of the strip seal gland from slipping loose. The upper lip of the extrusion shall extend over the bottom lip to avoid pinching the gland when the expansion joint system is in a closed position. Shop drawings will not be required when the seal is placed in existing steel extrusions.

.3.2 Installation. The area of steel armor to come in contact with strip seal lubricant adhesive shall be

sand blasted prior to installing the seal. Sand blasting will be considered acceptable when the steel surfaces have been cleaned to an SSPC-SP10 degree of cleanliness. Clean-up and disposal of blast material shall be in accordance with Sec 202.3.1.3. The strip seal shall be made watertight with a lubricant adhesive for bonding the neoprene gland to the steel extrusion as recommended by the manufacturer. The contractor shall obtain the services of a qualified technical representative, approved by the manufacturer of the expansion system and acceptable to the engineer, to assist during the installation. The installation shall not occur without the technical representative being present.

.4 Method of Measurement. Final measurement will not be made except for authorized changes during

construction, or where appreciable errors are found in the contract quantity. Where required, the strip seal will be measured to the nearest linear foot, based on measurement from the roadway face of curb to roadway face of curb along the centerline of the joint. The revision or correction will be computed and added to or deducted from the contract quantity. Portions of the joint that extend past the roadway face of curbs will not be measured for payment.

.5. Basis of Payment. Strip seals, including all material, coating, equipment, labor, fabrication,

installation, technical assistance, and any other incidental work necessary to complete this work, will be paid for at the contract unit price. SECTION 717.30 SILICONE EXPANSION J OINT SEALANT.

717.30.1 Description. This work shall consist of furnishing and installing the backer rod and silicone expansion

joint sealant for joints as shown on the plans or as directed by the engineer. Structural steel for the joints shall be furnished and installed as shown on the plans.

.2 Material. All material shall be in accordance with Division 1000, Material Details, and specifically as

follows: Item Section Silicone Expansion Joint Sealant 1057

.3 Construction Requirements. The contractor shall furnish to the engineer the manufacturer's written

product information, installation procedures and instructional information at least two weeks prior to installation. The contractor shall obtain the services of a qualified technical representative approved by the manufacturer of the expansion system and acceptable to the engineer, to assist during the installation. The contractor, the technical representative and the engineer shall meet to review and clarify installation procedures and requirements prior to starting the work. The start of surface preparations and sealant installation shall not occur without the technical representative being present. The technical representative shall be present for at least one day at the start of surface preparations and sealant installation.

.3.1 Shop Drawings. Shop drawings for structural steel for expansion joint systems shall be prepared in

accordance with Sec 1080. The dimensions of the seal shall be shown on the drawings for the armored joint. Shop drawings will not be required when the sealant is placed against concrete or existing steel armor.

.3.2 Surface Preparation. The concrete or steel surface shall be prepared for priming and sealant

placement. New Portland cement concrete shall be fully cured and allowed to dry a minimum of seven days. The joint shall be cleaned of all gravel, loose material and other contaminates before sand blasting. Areas that 464 will be in contact with the sealant shall be sand blasted with a clean, hard aggregate that will leave little to no dust residue. Sand blasted concrete surfaces will be considered acceptable when areas that will be in contact with the sealant have a roughened surface with clean, exposed aggregate. The surface shall be free of foreign matter or plastic residue. Sand blasted steel surfaces will be considered acceptable when the steel surfaces have been cleaned to an SSPC-SP10 degree of cleanliness. Clean-up and disposal of blast material shall be in accordance with Sec 202.3.1.3. After sand blasting is completed, the joint shall be cleaned of debris using oil- free and water-free compressed air or a vacuum, either being at least 90 psi.

.3.3 Priming. Priming shall immediately follow sand blasting and cleaning and will only be permitted to

proceed when the air and substrate temperatures are at least 40 F and rising. Sand blasting, priming and sealing shall be performed on the same day. The entire sand blasted surface shall be primed. Application and drying times for primers shall be in accordance with the manufacturer’s recommendations. All leftover primer shall be properly disposed.

.3.4 J oint Installation. The backer rod shall be installed as specified on the plans and in accordance with

the manufacturer’s recommendations. All voids in the installed backer rod shall be filled to prevent sealant leakage.

.3.5 Sealant Placement. The sealant thickness and recess depth shall be as shown in the contract

documents and shall be measured during installation at approximately 2 foot intervals. Adjustments to correct sealant thickness to within ± 1/8-inch tolerance shall be made before the sealant begins to set. Sealant placement will only be permitted when the air and substrate temperatures are above 40 F, below 90 F and 5 F above the dew point. The joint surfaces shall be kept clean and dry during sealing. The joint shall remain clean and dry during the sealing operation. Sealing shall be performed using a pneumatic gun in accordance with the manufacturer’s recommendations. End of seal treatment at vertical faces of curbs, sidewalks or parapets shall be as recommended by the manufacturer and as shown in the contract documents. Sealant placed incorrectly shall be removed and replaced at the contractor's expense.

.4 Method of Measurement. Final measurement will not be made except for authorized changes during

construction, or where appreciable errors are found in the contract quantity. Where required, the silicone expansion joint sealant will be measured to the nearest linear foot based on measurement from the roadway face of curb to roadway face of curb along the centerline of the joint. The revision or correction will be computed and added to or deducted from the contract quantity. Portions of the joint that extend past the roadway face of curbs will not be measured for payment.

.5 Basis of Payment. Silicone expansion joint sealant, including all materials, coating, equipment, labor,

fabrication, installation, technical assistance and any other incidental work necessary to complete this work, will be paid for at the contract unit price. SECTION 717.40 SILICONE J OINT SEALANT FOR SAW CUT AND FORMED J OINTS.

717.40.1 Description. This work shall consist of sealing the saw cut and formed joints as shown in the contract

documents.

.2 Material. All material shall be in accordance with Division 1000, Material Details, and specifically as

follows: Item Section Silicone Joint Sealant for Saw Cut and Formed Joints 1057

.3 Construction Requirements

.3.1 Saw Cut J oints. Joints shall be sawed as shown on the plans as soon as the concrete has hardened

sufficiently to permit sawing of a neat straight joint with minimal raveling, and before uncontrolled shrinkage cracking occurs. All joints shall be sawed to the required dimension and cleaned by sand blasting, wire brushing or other methods approved by the engineer in accordance with the manufacturer’s recommendations. Joint interfaces shall be fully cured and dry,, or free of moisture at the time of installation. All loose particles shall be 465 removed by oil-free and water-free compressed air or a vacuum of at least 90 psi before the application of the backer rod and sealant.

.3.2 Formed J oints. Any joints 0.25 inch or greater shall be cleaned and packed with backer rod and

silicone joint sealant. Any joints less than 0.25 inch shall be cleaned and caulked with silicone joint sealant as shown on the plans. All joint interfaces shall be cleaned by grinding, saw cutting, sand blasting, wire brushing or other methods approved by the engineer in accordance with the manufacturer’s recommendations. New Portland cement concrete shall be fully cured and allowed to dry a minimum of seven days. The joint interfaces shall be free of moisture at the time of installation. All loose particles shall be removed by oil-free and water-free compressed air or vacuum of at least 90 psi before the application of the backer rod and sealant.

.3.3 J oint Backer Rod. The backer rod shall be used in the joint slot to ensure the sealant adheres to the

sidewalls or interface of the joint. All joint areas requiring a backer rod shall be packed with a closed-cell, expanded polyethylene foam to obtain the appropriate depth of the sealant. The backer rod shall be slightly oversized for the joint width, and shall be resilient, compressible in nature, nonabsorbent, non-shrinking and compatible with the sealant.

.3.4 Sealant Placement. Sealant shall be placed in the proper configuration as shown on the plans. Joint

sealer shall be protected from dust and other foreign matter until cured to a tack-free condition. The sealant shall fill the joint from the bottom to slightly below the surface currently being applied. Immediately after placement and before a skin forms, the sealant shall be tooled to force the sealant against the joint face and to recess the bead approximately 1/8 inch.

.3.5 Clean-up and disposal of blast material shall be in accordance with Sec 202.3.1.3

.4 Method of Measurement. No measurements will be made

.5 Basis of Payment. No direct payment will be made for this work

SECTION 717.50 OPEN CELL FOAM J OINT.

717.50.1 Description. This work shall consist of furnishing and installing an open cell foam joint system as

shown on the plans, as directed by the engineer and in accordance with the manufacturer’s requirements.

.2 Material. All material shall be in accordance with Division 1000, Material Details, and specifically as

follows: Item Section Open Cell Foam Joints 1073

.3 Construction Requirements. The contractor shall have a manufacturer’s representative on site for the

joint installation. The representative shall be responsible for ensuring the surface preparation and joint installation are done in accordance with the manufacturer’s requirements.

.3.1 Shop Drawings. Shop drawings for structural steel for expansion joint systems shall be prepared in

accordance with Sec 1080. The dimensions of the open cell foam shall be shown on the shop drawings for the armored joint. Shop drawings will not be required when the open cell foam is placed against concrete or existing steel armor.

.3.2 Field Splices. The Open Cell Foam shall be installed in one continuous piece without field splices,

unless otherwise specified on the plans or directed to by the engineer. Open Cell Foam shall be spliced with silicone called for in Sec 1057 and in accordance with the manufacturers recommendations

.4 Method of Measurement. Final measurement will not be made except for authorized changes during

construction or where significant errors are found in the contract quantity. Where required, the open cell foam joint will be measured to the nearest linear foot based on measurement from roadway face of curb to roadway face of curb along the centerline of the joint. The revision or correction will be computed and added to or 466 deducted from the contract quantity. No measurement will be made of portions of the joint that extend past the roadway face of curbs.

.5 Basis of Payment. Open cell foam joint, including all material, coating, equipment, labor, fabrication,

installation and any other incidental work necessary to complete this work, will be paid for at the contract unit price. SECTION 717.60 PREFORMED SILICONE OR EPDM EXPANSION J OINTS.

717.60.1 Description. This work shall consist of furnishing and installing a preformed silicone or EPDM

expansion joint seal for joints as shown on the plans or as directed by the engineer and in accordance with the manufacturer’s requirements.

.2 Material. All material shall be in accordance with Division 1000, Material Details, and specifically as

follows: Item Section Preformed Silicone or EPDM Expansion Joints 1073

.3 Construction Requirements. The contractor shall furnish to the engineer the manufacturer's written

product information, installation procedures and instructional information at least two weeks prior to installation. The contractor shall obtain the services of a qualified technical representative approved by the manufacturer of the expansion joint seal and acceptable to the engineer, to assist during the installation. The contractor, the technical representative and the engineer shall meet to review and clarify installation procedures and requirements prior to starting the work. The start of surface preparations and seal installation shall not occur without the technical representative being present. The technical representative shall be present for at least one day at the start of surface preparations and seal installation.

.3.1 Shop Drawings. Shop drawings for structural steel for expansion joint systems shall be prepared in

accordance with Sec 1080. The dimensions of the preformed silicone or EPDM seal shall be shown on the shop drawings for the armored joint. Shop drawings will not be required when the preformed silicone or EPDM seal is placed against concrete or existing steel armor.

.3.2 Surface Preparation. The concrete or steel surface shall be prepared for priming and seal

placement. New Portland cement concrete shall be fully cured and allowed to dry a minimum of seven days. The joint shall be cleaned of all gravel, loose material and other contaminates before sand blasting. Areas that will be in contact with the sealant shall be sand blasted with a clean, hard aggregate that will leave little to no dust residue. Sand blasted concrete surfaces will be considered acceptable when areas that will be in contact with the sealant have a roughened surface with clean, exposed aggregate. The surface shall be free of foreign matter or plastic residue. Sand blasted steel surfaces will be considered acceptable when the steel surfaces have been cleaned to an SSPC-SP10 degree of cleanliness. Clean-up and disposal of blast material shall be in accordance with Sec 202.3.1.3. After sand blasting is completed, the joint shall be cleaned of debris using oil- free and water-free compressed air or a vacuum, either being at least 90 psi. Using a rag saturated in denatured alcohol, wipe clean both vertical faces of the expansion joint opening.

.3.3 Priming. Priming shall immediately follow sand blasting and cleaning and will only be permitted to

proceed when the air and substrate temperatures are at least 40° F and rising. Sand blasting, priming and installing the seal shall be performed on the same day. The entire sand blasted surface shall be primed. Application and drying times for primers shall be in accordance with the manufacturer’s recommendations. All leftover primer shall be properly disposed.

.3.4 Installation. The preformed silicone or EPDM expansion joint seal shall be installed in joints in one

continuous piece without field splices. The locking adhesive and seal shall be applied in accordance with the manufacturer’s recommendations, in a manner that prevents the seal from being damaged and from being in tension. Twisting, curling and nicking the seal will be prohibited. Unless the installation tool is capable of installing the seal without elongation prior to placement, the seal shall be pre-cut to the exact length for the joint plus ends as shown in the contract documents or as directed by the engineer. The pre-cut seal shall be installed 467 and measured for stretch. The seal shall be removed and reinstalled if the seal stretch length exceeds five percent of the pre-cut length at the contractor’s expense.

.4 Method of Measurement. Final measurement will not be made except for authorized changes during

construction or where significant errors are found in the contract quantity. Where required, the preformed silicone or EPDM expansion joint will be measured to the nearest linear foot based on measurement from roadway face of curb to roadway face of curb along the centerline of the joint. The revision or correction will be computed and added to or deducted from the contract quantity. No measurement will be made of portions of the joint that extend past the roadway face of curbs.

.5 Basis of Payment. Preformed silicone or EPDM expansion joint, including all material, coating,

equipment, labor, fabrication, installation and any other incidental work necessary to complete this work, will be paid for at the contract unit price.

Referenced in this section

Get an email when 717 changes

Missouri revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Missouri Standard Specifications for Highway Construction, 2026 (Oct) Edition. Pages 463–468 of 874. View official source ↗

Ask about this section

Scoped to Missouri Missouri Standard Specifications for Highway Construction, Section 717 — Flexible Joint Systems. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.