232Fertilizer for Woody Plant Material

MS · 2017 Standard Specifications✓ Full text on BuildSpecBook pages 193–193 Save this section

Ask about Section 232

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

SECTION 232 - FERTILIZER FOR WOODY PLANT MATERIAL

232.01 Description. This work consists of furnishing, transporting, and placing

fertilizer under or around the roots of trees, shrubs, liner plants, and other plant materials in accordance with the requirements shown on the plans and in these specifications.

232.02 Materials. The fertilizer for woody plant materials shall meet the requirements

of Subsection 715.08.

232.03 Construction Requirements. Unless otherwise specifi ed, the Contractor will

have the option of using fertilizer packets or tablets. A one-ounce packet is equivalent to four five-gram tablets; two ten-gram tablets; or one twenty-one-gram tablet. The required number and size of packets or tablets for each type of plant material will be specified on the plans. When using packets, they shall be placed beneath the roots in the backfill material during the planting operation. Care shall be taken to ensure that packets remain unopened and lie in a horizontal position. When using tablets, the plant shall be positioned in the plant hole and backfilled no higher than halfway up the root ball. The sp ecified number of tablets, designated on the plans or determined by the Engineer, shall be spaced approximately equal distances around and immediately adjacent to the root ba ll. The backfilling operation shall then be completed in accordance with the planting specifications.

232.04 Method of Measurement. Fertilizer for woody plant material will be measured

by the thousand tablets or packets. Fertilizer tablets, placed as specified and accepted, will be measured in place by the

Get an email when 232 changes

Mississippi revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Road and Bridge Construction, 2017 Edition. Pages 193–193 of 1,113. View official source ↗