SECTION 620 - MOBILIZATION AND REQUISITE WORK
620.01 Description. Mobilization consists of moving all labor, equipment, supplies, and
incidentals to the project site. It also includes all mobilization pre-construction costs that are necessary direct costs to th e project and are of a general nature rather than directly attributable to other pay items. Requisite work consists of the preparation for and the performance of construction necessary as a requisite to the performance of other items of work and the cost of such work when no other provisions are made in the contract for payment therefore. Such work shall include, but is not limited to, all obliga tions, preparation, construction and all other costs of requisite work for which no compensation is provided in other items of work.
620.02 Blank.
620.03 Blank.
620.04 Method of Measurement.
620.04.1 Mobilization. Measurement for payment will be in accordance with the
following schedule:
620.04.2 Requisite Work . For monthly estimates, the Engineer will estimate the
percentage of requisite work completed. Upon satisfactory completion of all requisite work, measurement will be considered as 100 percent.
620.05 Basis of Payment. Mobilization and requisite work will be paid for at the contract