SECTION 656--DYNAMIC MESSAGE SIGN
656.01 Description. This work consists of furnishing, installing and integrating a
stationary electronic Dynamic Message Sign (DMS) assembly. The Contractor shall supply a complete operating Light Emitting Diode (LED) sign including the sign housing, sign controller unit (SCU), roadside DMS controller cabinet, all cabling, conduits, electrical service, surge suppression and a ll hardware associated with a complete installation in accordance with these specifications. The DMS assemblies will provide MDOT personnel with a means to visually communicate with motorists regarding incidents, accidents, special events, travel times, etc., that may impact travel on the roadway network.
656.02 Materials.
656.02.1 Types of DMS. Each DMS shall be one of the following types:
DMS Type 1 shall be full a color high resolution matrix sign. The display and pixel spacing shall be capable of displaying three lines of text with 21 characters per line such that each character shall each have a nominal height of 18 inches. The pixel pitch shall be 20mm (0.78”) or less. The signs housing shall be a walk-in enclosure. DMS Type 2 shall be a full color high resolution matrix sign. The display and pixel spacing shall be capable of displaying three lines of text with 21 characters per line such that each character shall have a nominal height of 18 inches. The pixel pitch shall be 20mm (0.78”) or less. The signs housing shall be either a front access or rear access enclosure. A walk- in enclosure is not required for a Type 2 DMS but is allowed if preferred by the vendor. DMS Type 3 shall be a full color high resolution matrix sign. The display and pixel spacing shall be capable of displaying two lines of text with 9 characters per line such that each character shall each have a nominal height of 12 inches. The pixel pitch shall be 20mm (0.78”) or less. The signs housing shall be e ither a front access or rear access enclosure. A walk-in enclosure is not required for a Type 3 DMS but is allowed if preferred by the vendor.
656.02.2 DMS Components. Each DMS shall include the following main components:
656.02.3 References. This specification incorporate nonnative references to other
standards as listed below. If a conflict exis ts between the standards referenced and this specification, this specification shall govern.
656.02.4 Glossary of DMS Terms. The definitions of the terms used within this
specification are those terms defined in NEMA TS-4.
656.02.5 Environmental Requirements. Each DMS shall meet all of the performance
and testing requirements as outline in Section 2 of NEMA TS-4 standard in addition to the following minimum requirements: SPD shall be installed at each of the following locations:
656.02.6 Mechanical Construction. Each DMS shall meet all of the performance and
testing requirements as outlined in Section 3 of NEMA TS-4 standard in addition to the following requirements:
656.02.6 1--Vents and Filters. Each DMS vent and air filters shall meet the following
requirements:
656.02.6 2--Ventilation System . Each DMS shall incorporate a ventilation system
meeting the following requirements:
656.02.6 3--Sign Face Material. The sign face material shall be replaceable.
656.02.6 4--Sign Housing Construction. The DMS housing shall meet the following
requirements:
656.02.6 5--Access Door. Walk in DMS housing shall include an access door meeting the
following requirements:
656.02.7 Controller to Sign Interface. Each DMS shall meet all of the performance and
testing requirements as outline in Section 4 of NEMA TS-4 standard.
656.02.8 Display Properties. Each DMS shall meet all of the performance and testing
requirements as outlined in Section 5 of NEMA TS-4 standard for outdoor sign using light emitting pixels in addition to the following. DMS pixel shall be manufactured using LEDs. Each pixel shall contain the quantity of discrete LEDs needed to output white colored light at a minimum luminous intensity of 12,400 candelas per square meter when measured using a photometric meter through the DMS front face panel assembly. Each pixel shall be capable of displaying amber colored light with a minimum luminous intensity of 7,440 candelas per square meter when measured using a photometric meter through the DMS front face panel assembly. Each pixel shall consist of a minimum of one (1) independent string of discrete LEDs for each color. All pixels shall contain an equal quantity of LED strings. Pixels shall be replaceable either individually or in groupings. Groupings with three or more pixels shall be permitted only if bench level repairs and replacements to individual pixels are possible. The failure of an LED in one string within a pixel shall not affect the operation of any other string or pixel.
656.02.9 Optical Components. Each DMS shall meet all of the performance and testing
requirements as outlined in Section 6 of NEMA TS-4 standard in addition to the following LED requirements. LEDs used to form each pixel shall meet the following minimum requirements. DMS pixels shall be constructed with discrete LEDs manufactured by Avago Technologies (formerly Agilent Technologies), Toshiba Corporation, or Nichia Corporation, OSRAM, EOI, or a manufacturer submitted and approved in writing by the Department. LED lenses shall be UV light resistant. All LEDs shall be water resistant having a nominal viewing cone of 30 degrees with a half- power angle of 15 degrees measured from the longitudinal axis of the LED. Viewing cone tolerances shall be as specified in the LED manufacturer’s product specifications and shall not exceed +/- 5 degrees. Using optical enhancing lenses with 15 degrees LED’s will not conform to 30 degree half-power viewing cone specification. Red LEDs shall utilize AlInGaP semiconductor technology and shall emit red light that has a peak wavelength of 615-635 nm. Green LEDs shall utilize InGaN semiconductor technology and shall emit green light that has a peak wavelength of 520-535 nm. Blue LEDs shall utilize InGaN semiconductor technology and shall emit blue light that has a peak wavelength of 464-470 nm. The various LED color and intensity bins shall be distributed evenly throughout the sign and shall be consistent from pixel to pixel. The LED manufacturer shall assure color uniformity and consistency on the LED display face within 30 degree cone of vision. Inconsistent color shifts of intensity will be cause for rejection. The LEDs shall be rated by the LED manufacturer to have a minimum lifetime of 100,000 hours of continuous operation while mainta ining a minimum of 70% of the original brightness.
656.02.10 DMS Controller Cabinet. Each DMS controller cabinet shall meet all of the
performance and testing requirements as outlined in Section 7 of NEMA TS-4 standard.
656.02.11 Electronics and Electrical. Each DMS shall meet all of the performance and
testing requirements as outlined in Section 8 of NEMA TS-4 standard in addition to the following requirements:
656.02.11 1--Brightness Controls. The DMS light sensing and dimming control shall
meet the following minimum requirements.
656.02.11 2--Communication Interfaces. The DMS controller shall support two Central
Communication Ports (CCPs). One CCP shall be an Ethernet port, and the second CCP shall be a serial RS232 port.
656.02.11 3--NTCIP Protocol and Command Sets. As a minimum, the DMS hardware
and software shall support the following NTCIP objects. This specification references several standards through their NTCIP designated names and numbers. Each NTCIP Component covered by these project specifications shall implement the most recent version of the st andard that is available as of project advertisement date, including any and all prepared Amendments to these standards as of the same date. Profile Implementation Confor mance Specifications (PICS) for each NTCIP standard required shall be submitted for review and approval to the Department.
656.02.11 3.1--Ethernet Interface. Communication interfaces using Ethernet shall
conform at a minimum with all mandatory objects of all mandatory Conformance Groups of the following standards:
656.02.11 3.2--RS-232 Interface. Communication interfaces using RS-232 shall conform
at a minimum with all standards:
656.02.11 3.3--Subnet Level. For each communication interface, the Subnet Level shall
meet the following minimum requirements. NTCIP Components may support additional Subnet Profiles at the manufacturer's option. At any one time, only one Subnet Profile shall be active on a given communication interface. The NTCIP Component shall be configurable to allow the field technician to activate the desired Subnet Profile.
656.02.11 3.4--Transport Level. For each communication interface, the Transport Level
shall meet the following minimum requirements. Communication interfaces may support additional Transport Profiles at the manufacturer's option. Response datagrams shall use the same Transport Profile used in the request. Each communication interface shall support the receipt of diagrams conforming to any of the identified Transport Profiles at any time.
656.02.11 3.5--Application Level. For each communication interface, the Application
Level shall meet the following minimum requirements. All communication interfaces shall comply with NTCIP 1101 and shall meet the requirements for Conformance Level 1 (NOTE -See Amendment to standard). Optionally, the NTCIP Component may support Simple Network Management Protocol (SNMP) traps. A communication interface may support additional Application Profiles at the manufacturer's option. Responses shall use the same Application Profile used by the request. Each communication interface shall support the receipt of Application data packets at any time allowed by the subject standards.
656.02.11 3.6--Information Level. All communication interfaces Information level
protocol shall meet the following minimum requirements. All communication interfaces shall provide Full, Standardized Object Range Support of all objects required by these procurement specifications unless otherwise indicated below. The maximum Response Time for any object or group of objects shall be 200 milliseconds. All communication interfaces shall implement all mandatory objects of all mandatory Conformance Groups as defined in NTCIP 1203 and their respective Amendments. Table 1 indicates the modified object requirements for these mandatory objects. Table 2 shows the required minimum support of messages that are to be stored in permanent memory. The sign shall blank if a command to display a message contains an invalid Message CRC value for the desired message. Table 3 specifies the support of the required MULTI tags and their ranges. Interfaces shall also implement all mand atory objects of th e following optional conformance groups of NTCIP 1201.
656.02.11 4--NTCIP Compliance Documentation. Software shall be supplied with full
documentation, including a CD-ROM containing ASCII versions of the following Management Information Base (MIB) files in Abstract Syntax Notation 1 (ASN.1) format:
656.02.12 Performance Monitoring. Each DMS shall meet a ll of the performance and
testing requirements as outlined in Section 9 of NEMA TS-4 standard.
656.02.13 Power Requirements. Each DMS shall meet a ll of the performance and
testing requirements as outlined in Section 10 of NEMA TS-4 standard.
656.02.14 Operational Security. The Contractor shall change the manufacturer’s default
passwords for all levels of access. The passwords for each level of access shall be different. The individual passwords shall be at least eight (8) characters in length, contain both upper and lowercase alphabetic characters (A-Z, a-z), have at least one (1) numerical character (0-9), and have at least one (1) special character (~!@#$ %^&*()_-+=). The passwords shall not 1) spell a word or series of words that can be found in a standard dictionary, 2) spell a word with a number added to the beginning and the end, or 3) be based on any personal information such as user id, family name, pet, birthday, etc. The Contractor shall provide the Project Engineer will a listing of all passwords for each DMS prior to the DMS being placed on the project. If multiple DMSs are used on a project, they shall each have distinct passwords.
656.03 Installation Requirements. All equipment shall be installed according to the
manufacturer’s recommendations, the plans and as follows. The Contractor shall provide the Department with a written inventory of items received and the condition in which they were received. Inventory shall be inclusive of make, model, and serial numbers, MAC address, and installation GPS coordinates. All equipment shall be installed according to the manufacturer’s recommendations or as directed by the Engineer. Any new, additional or updated drivers required for the existing ATMS software to communicate and control new DMS installed by the Contractor shall be the responsibility of the Contractor.
656.03.1 Certified Installation. Installation of the DMS shall be performed by the
supplier or a Contractor trained and certified by the supplier. If a certified Contractor performs the installation and configuratio n, a supplier factory representative shall supervise and assist the Contractor during installation and configuration.
656.03.2 Testing. Each DMS shall undergo testing to verify conformance to the
following specifications. The Contractor shall conduct a Project Testing Program as required below. All costs associated with the Project Testing Program shall be included in overall contract prices; no separate payment will be made for any testing.
656.03.2 1--General Requirements . The Contractor is responsible for planning,
coordinating, conducting and documenting all aspects of the Project Testing Program. The Project Engineer, ITS Engineer, and/or their designee(s) are only responsible for attending and observing each test, and reviewing and approving the Contractor's test results documentation. The Project Engineer, ITS Engineer, and/or their designee(s) reserve the right to attend and observe all tests. The Contractor is required to perform the DMS Sub- System test and the Conditional Acceptance te st with the Department ITS Engineer or designee present. Each test shall fully demonstrate that the equi pment being tested is clearly and definitely in full compliance with all project requirements. Test procedures shall be submitted and approved for each test as part of the project submittals. Test procedures shall include every action necessary to fully demonstrate that the equipment being tested is clearly and definitively in full compliance with all project requirements. Test procedures shall cross-re ference to these specifications or the project plans. Test procedures shall contain documentation regarding the equipment configurations and programming. No testing shall be scheduled until approval of all project submittals and approval of the test procedures for the given test. The Contractor shall provide all ancillary equipment and materials as required in the approved test procedures. The Contractor shall request in writing the Project Engineer's approval for each test occurrence a minimum of 14 days prior to the requested test date. Test requests shall include the test to be performed and the equipment to be tested. The Project Engineer reserves the right to reschedule test request if needed. All tests shall be documented in writing by the Contractor in accordance with the test procedure and submitted to the Project Engineer within seven (7) days of the test. Any given test session is considered incomplete until the Project Engineer has approved the documentation for that test session. All tests deemed by the Project Engineer to be unsatisfactorily completed shall be repeated by the Contractor. In the written request for each test occurrence that is a repeat of a previous test, the Contractor shall summarize the diagnosis and correction of each aspect of the previous test. The test procedures fo r a repeated test occurrence shall meet all the requirements of the original test procedures, including review and approval by the Project Engineer and ITS Engineer. The satisfactory completion of any test shall not relieve the Contractor of responsibility to provide a completely acceptable an d operating system that meet s all requirements of this project.
656.03.2 2--DMS Factory Acceptance Test (FAT). The Contractor shall perform FAT
on the DMS prior to shipping from the factory. The goal of the DMS FAT is to verify that the DMS meets the requirements of the specifications. FATs shall be conducted at the Manufacturer or Contractor facility or at a facility acceptable to all parties. All equipment to be utilized for this project shall be subject to tests that demonstrate the suitability of the design and compliance with the contract requirements, unless an exception for an equipment item is granted by the Project Engineer. The tests shall be performed on production units identified to be delivered under this contract. The FAT procedure shall demonstrate all requirements defined in these specifications are met, including, but not limited to: functional/system performance requirements, electrical requirements, data transmission/communi cation requirements, safety/password requirements, environmental requirements , and interface requirements with other components of the project system. The Project Engineer reserves the right to waive FATs which are deemed to be unnecessary and reserves the right to witness all FATs that are determined to be critical to the project. At a minimum, the Project Engineer and/or the Project Engineer’s representative will be in attendance at the FAT for the first three (3) un its tested. The FAT for the first three (3) units shall be conducted during the same period. The Project Engineer shall be notified a minimum of forty- five (45) calendar days in advance of such tests. Salary and travel expenses of the Project Engineer and the Pr oject Engineer representatives will be the responsibility of the Department. In case of equipment or other failures that make a retest necessary, travel expenses of the Project Engineer and the Project Engineer’s representatives shall be the responsibility of th e Contractor. This shall include all costs including, but not limited to, airfare, automobile rental, lodging, and per diem. These costs, excluding airfare shall not exceed $500.00, per representative, per day. These costs shall be deducted from payment due or charged to the withholding account of the Contractor when the project is terminated. The vendor must complete the FAT on all remaining units on their own and submit documentation to the Project Engineer that the FATs were completed. The Project Engineer reserves the right to randomly attend those FAT tests. No equipment for which a FAT is required sha ll be shipped to the project site without successful completion of factory acceptance tes ting as approved by the Project Engineer and the Engineer's approval to ship.
656.03.2 3--DMS Pre-Installation Test (PIT). The Contractor shall perform PIT on the
DMS as they arrive from the factory. The goal of the DMS PIT is to verify that the DMS were not damaged during shipping. The PIT shall test or inspect the following DMS components:
656.03.2 4--DMS Stand Alone Test (SAT). The Contractor shall perform SAT on the
DMS as they arrive from the factory. The go al of the SAT is to verify that the DMS has been properly installed and commissioned accord ing to the manufacturer requirements. The SAT shall include at minimum the following tests and inspections:
656.03.2 5--DMS Sub-System Test (SST). The Contractor shall perform SST on the
DMS to verify that the sign is operational from the TMC. The goal of the SST is to verify that all remote DMS functions and alarms are operational. The Contractor shall coordinate the SST with the Project Engineer and ITS Engineer. The Contractor shall provide a SST plan to the Department ITS Engineer with a copy to the Project Engineer and be approved a minimum of two week in advance of tests being performed.
656.03.2 6--Conditional System Acceptance Test (CSAT). The Contractor shall perform
a complete CSAT on all equipment and materials on the project. The Contractor shall not request the CSAT for a phase until the SATs ha ve been satisfactorily completed, all as- built documentation has been submitted and approved, and all other project work has been completed to the satisfaction of the Engineer. Prior to a CSAT, the Contractor shall provide advance notice of and written test results documentation that the Contractor has performed a dry-run of the CSAT, and the Engineer reserves the right to require attendance of a dry- run test session. The Contractor shall test all project syst ems simultaneously from the TMC in a manner equivalent to the normal day-to-day operations of the system. The Conditional System Acceptance Test shall demonstrate that all equipment and materials in the network are in full compliance with all project requirements and fully functional as installed and in final configuration, communicating with and being controlled through the control center at the TMC. Upon completion and full approval of the CSAT for all equipment, conditional system acceptance will be given and the Burn-in Period will begin. The Contractor shall coordinate the CSAT with the Project Engineer and ITS Engineer. The Contractor shall provide a CSAT plan to the ITS Engineer w ith a copy to the Proj ect Engineer and be approved a minimum of thirty (30) calendar days in advance of tests being performed. The CSAT plan shall be inclusive of steps and procedures to be performed and scheduled times to perform test procedures.
656.03.2 7--Burn-In Period. Following the Engineer’s written notice of successful
completion of the CSAT, the entire newly installed system must operate successfully for a three (3) month burn-in period. During this burn-in period the Contractor shall be responsible for the full maintenance of the newly installed equipment. However, no separate payment will be made for the burn-in period activities and shall be included in the cost of other items. Successful completion of the burn-in period will occur at the end of three complete months of operation without a major system failure attributable to hardware, software or communications components. Each system failure during the burn-in period will require an additional month of successful operation prior to being eligible for Final Acceptance. (i.e., if there are two system failures during the initial three month period, the burn-in period would be increased to five (5) months.) Burn-In General Requirements. Determination of a system failure shall be at the sole discretion of the Engineer. System failure is defined as a condition under which the system is unable to function as a whole or in significant part to provide the services as designed. While a single component failure will not constitute a system failure, chronic failure of that component or component type may be sufficient to be considered a system failure. Chronic failure of a component or component type is defined as 3 or more failures for the same component during the burn-in period. Components are defined as contract items or major material elements in a contract item. For electrical and electronic c ontract items, components are defined as the complete assembly of materials that makes up the contract item. Specifically exempted as system failures are failures caused by accident, acts of God, or other external forces that are beyond the control of the Contractor. However, failure of the contractor to respond to the repair request for that failure within 24 hours may be considered a system failure. The Department will advise the Contractor in writing when it considers that a system failure has occurred or chronic failure exists. If multiple system and/or chronic failures continue to occur throughout the burn-in period due to a single component type, the Contractor may be required to replace all units of that component type with a different model or manufacturer. The Contractor shall document all failures and subsequent diagnosis and repair. The repair documentation shall include as a minimum: Description of the problem Troubleshooting and diagnosis steps Repairs made List of all equipment and materials changed including serial numbers. Update of the equipment inventory where needed. The Contractor shall provide the repair documentation to the Engineer within two (2) days of completing the repair; failure to provide acceptable documentation as required shall be reason to not approve the repair as comple te. The Engineer w ill provide acceptance or rejection of the repair and documentation within seven (7) days. The Engineer reserves the right to require, at no additional expense to the State, the presence of a qualified technical representative of the equipment and/or software manufacturers as related to the diagnosis and/or repair of any system failure. During the burn-in period the Contractor shall perform incidental work such as touching up, cleaning of exposed surfaces, leveling and repair of sites, sodding/grassing and other maintenance work as may be deemed necessary by the Engineer to ensure the effectiveness and neat appearance of the work sites. During the burn-in period the Engineer shall maintain a “burn-in period punch list” that contains required Contractor actions but that the Engineer does not define as a system failure. Each burn-in period punch list action item shall be completed by the Contractor to the Engineer’s satisfaction within seven (7) da ys of Contractor notification of the action item. During the burn-in period the Contractor is required to meet the following response times once notified there is a problem. A response is defined as being on-site to begin diagnosing the problem. Monday thru Friday: The Contractor shall respond no later than 9:00 a.m. the following morning after being notified. Weekends: If the Contractor is notified on Friday afternoon or during the weekend, the Contractor shall respond by 9:00 a.m. on Monday morning. During the burn-in period the Contractor shall provide all labor, materials, equipment and replacement parts to completely maintain, troubleshoot and repair all items installed under this contract. No separate payment will be made for any labor, materials, equipment, or replacement parts needed during the burn-in period. The overall burn-in period will be considered complete upon the successful completion of the burn-in time periods, the Engineer’s acceptance of all repairs and repair documentation, completion of all burn-in period punch list actions and a final inspection as described below.
656.03.2 8--DMS Final Inspection. Upon successful completion of the burn-in period,
the project shall be eligible for the DMS final inspection. The DMS final inspection will be conducted provided the burn-in period has demonstrated the entire system is operating successfully. The DMS final inspection shall include but is not limited to; monitoring of all system functions at the TMC to demonstrate the overall system is operational a field visit to each site to ensure all field components are in their correct final configuration verification that all burn-in punch list items have been completed verification that all final cleanup requirements have been completed approval of final as-built documentation Prior to conducting the DMS final inspection, the burn-in period shall demonstrate that all requirements defined in the specifications have been met. The Contractor shall request in writing the En gineer’s approval to start the DMS final inspection a minimum of 14 days prior to the requested start date. The Engineer reserves the right to reschedule the start date if needed. The start date for the DMS final inspection cannot be prior to the successful completion of the overall burn-in period. An unsuccessful or incomplete DMS final inspection shall require a new DMS final inspection after the Contractor has made the necessary corrections. Up to 14 days shall be allowed for the Engineer to conduct a DMS final inspection. The Engineer reserves the right to require, at no additional expense to the State, the attendance of a qualified technical represen tative of the equipment and/or software manufacturers to attend a portion of a DMS final inspection. The presence of the Project Engineer and ITS Engineer or his designee is required during the final inspection. The Contractor shall be responsible for the full maintenance of all project equipment and materials during the entire time period from the successful completion of the burn-in period until Final System Acceptance is granted.
656.03.2 9--Final System Acceptance. Upon successful completion of the DMS final
inspection and all other items of work, the Engineer will conduct a project final inspection in accordance with Subsection 105.20 of the Standard Specifications.
656.03.3 Documentation. DMS documentation shall meet all of the performance and
testing requirements as outline in Section 12 of NEMA TS-4 standard.
656.03.4 Warranty. The DMS shall be warranted to be free of manufacturer defects in
materials and workmanship for a period of one year from the date of Final Maintenance Release. Equipment covered by the manufacturer's warranties shall have the registration of that component placed in the Department's name prior to Final Inspection. The Contractor is responsible for ensuring that the vendors and/or manufacturers supplying the components and providing the equipment warranties recognize the Department as the original purchaser and owner/end user of the components from the time of installation. During the warranty period, the supplier shall repair or replace with new or refurbished material, at no additional cost to the State, any product containing a warranty defect, provided the product is returned postage-paid by the Department to the supplier's factory or authorized warranty site. Products repaired or replaced under warranty by the supplier shall be returned prepaid by the supplier. During the warranty period, technical support shall be available from the supplier via telephone within four hours of the time a call is made by the Department, and this support shall be available from factory certified personnel. During the warranty period, updates and corrections to control unit software shall be made available to the Department by the supplier at no additional cost.
656.03.5 MDOT Employee Training. As a minimum, the Contractor shall submit to the
Project Engineer for approval a detailed Training Plan including course agendas, detailed description of functions to be demonstrated and a schedule. The Contractor must also submit the Trainer's qualifications to the Project Engineer for approval prior to scheduling any training. The training must include both classroom style training and hands-on training in the field of the maintenance and troub leshooting procedures required for each component. The training should also consist of a hands-on demonstration of all software configuration and functionality where applicable. The supplier of the DMS shall, at a minimum, provide a sixteen-hour operations and maintenance training class with suitable documentation for up to eight (8) persons selected by the Department. This training shall include One (1) day of site device operation, maintenance, and configuration training for up to ten (10) individuals and One (1) day of on-site system training at the TMC for up to ten (10) individuals that is separate from the above training and specifically for software control of the integrated devices. The operations and maintenance class shall be sc heduled at a mutually acceptable time and location. The training shall be approved two (2) week ahead of the scheduled date.
656.03.6 Maintenance and Technical Support. The supplier shall maintain an adequate
inventory of parts to support maintenance and repair of the DMS. Spare parts shall be available for delivery within 30 days of placement of an acceptable order at the supplier's then current pricing and terms of sale of said spare parts.
656.04 Method of Measurement. Dynamic Message Sign will be measured per each
DMS installation.
656.05 Basis of Payment. Dynamic Message Sign, measured as prescribed above, will
be paid for at the contract unit price per eac h, which price shall be full compensation for furnishing, installing, system integration and testing of the complete dynamic message sign including the sign case, light sources, display apparatus, wiring, controller, roadside DMS cabinet, communications interface, wiring between the sign case and DMS cabinet, structure mounted conduit, fittings, and junction boxes, sign case support connections to the sign support structure, satisfactory completion of testing and training requirements and all labor, tools, materials, equipment, appurtenances, and incidentals necessary to complete the work for a complete and functional DMS including remote and local control of the sign It shall also include all system documentation including: shop drawings, operations and maintenance manuals, wiring diagrams, block diagrams, and other material necessary to document the operation of the DMS. This work does not include the sign support structure. Progress payments for Dynamic message signs shall be paid as follows:
660.01 Description. The cabinet will provide a protective outdoor housing enclosure in
which to install field hardware required for ITS devices. Major elements of the equipment cabinet include the cabinet housing and equipment mounting hardware, interior wiring and termination facilities, power supplies, electrical accessories and field installation. Work also includes making modifications to existing ITS cabinets in accordance with the plans, specials provisions, Notice to Bidders and contract documents.
660.02 Materials.
660.02.2 Equipment and Materials. The Contractor shall furnish only new equipment
and materials as follows. Equipment cabinets and integral materials shall be as recommended by the manufacturers for outside plant use and the intended application. This requirement shall include wiring and electrical materials and configurations (including connector pin-outs) that are wholly or partially related to the field device applications (CCTV, RDS, VDS, etc.). Equipment cabinets shall be furnished, installed, and configured at locations shown in the plans. All equipment and materials shall be furnished and configured for each specific location as shown in the plans. Electrical systems and components shall be UL-listings. Unless otherwise specified, wire and cable sh all be stranded copper conductors, 75°/90° Celsius wet/dry rated insulation, and sized for the maximum voltage and current in the circuit.
660.02.3 Components Sp ecified As Rail-Mounted. Components specified as rail-
mounted shall be compliant as follows.
660.02.4 Terminal Blocks and Component Terminals. Terminal Blocks and
Component Terminals shall be nickel-plated copper, copper alloy or brass. Terminal blocks shall have voltage and current ratings greater than the ratings of the wires that are terminated, be able to terminate wires from #8 AWG to #1/0 AWG wiring and shall be assembled into housing enclosures such that all exposed surfaces are touch-safe. Conductor fastening screws shall be captive. Terminal block housings shall be colored as follows:
660.02.5 Door Locks. Door Locks shall be provided for all cabinet doors, keyed to the
Department standard #2 key type lock keyed to be operated with a traffic industry conventional # 2 key made from heavy-duty blanks. Two keys shall be provided with each cabinet. Section 660 Section 660
660.02.6 Labels.
660.02.6 1--Cabinet Labels. Labels shall be provided with agency name, device name
and ID labels on all cabinets. Labels shall be flat black lettering on a reflective white background. Lettering shall be a minimum of one inch (1”) in height. Labels shall be manufactured from pre-coated adhesive backed reflective sheeting material meeting the minimum requirements of AASHTO M268 Type 1. The agency name labels shall be “MDOT ITS” in one continuous adhesive sheet. The device ID labels shall include the device name as an acronym and a hyphen, and shall be one continuous adhesive sheet. Device name acronyms are “CCTV-“, “RDS-“, “VDS- “or “DMS-“. The device ID shall be numerals corresponding to the location and shall be installed adjacent to the acronym sheet. Multiple device IDs of the same type shall be on the same line separated with a space. Examples: “CCTV-73”, “RDS-219 220”, “VDS-303 304”. Labels shall be installed along the top of the cabinet door (front cabinet door on Type B cabinets), with MDOT ITS label at the top and the device ID labels immediately underneath.
660.02.6 2--Voltage Labels . A voltage label shall be provided on all cabinets or
enclosures in accordance with the NEC labeling requirements. Voltage labels shall meet the following minimum requirements. Labels shall be flat black lettering on a reflective yellow background. Lettering shall be a minimum of 1 inch in height. Labels shall be manufactured from pre-coated adhesive backed reflective sheeting material meeting the minimum requirements of AASHTO M268 Type 1. Labels shall include the voltages entering the cabinet and shall be one continuous adhesive sheet. Examples are “120VAC” or “24VDC”. Labels shall be installed on all cabinet doors.
660.02.7 Type A Cabinet. All Type A cabinets shall be identical in manufacture and
assembly, capable of supporting Radar Detection System units. A Type A cabinet intended for outdoor use shall be provided with a minimum NEMA 3R rating. The cabinet enclosure shall be manufactured from 0.125-inch aluminum. The cabinet shall provide a minimum of one ventilation louver on at least two sides. Any louver opening greater than 3/16 inch in any dimension shall be screened to prevent insect entry. Section 660 Section 660 The cabinet shall be intended for strapped pole-mounting; provide all mounting hardware necessary including ½-inch stainless steel mounting straps. A Type A cabinet enclosure shall be provided with dimensions of 18 inches (H) x 14 inches (W) x 8 inches (D) with a tolerance of ±0.25 inches. Cabinet door shall reveal the entire front opening of the cabinet for accessibility. The hinge shall be designed to prevent the door from sagging. A single-piece 0.125-inch aluminum back panel shall be provided that covers no less than 90% of the cabinet back wall. Back panel shall be affixed to the enclosure with threaded fasteners and shall be removable from the enclosure with hand tools only and without requirement to remove the cabinet door, mounting straps, or any other components other than communications or device wiring. The cabinet shall be furnished with doorstops, which retain the doors open in a 90 degree and 120 degree positions. A grounding lug shall be provided on the back panel that is directly bonded to the back panel capable of terminating #6 AWG wire.
660.02.7 1--RDS Communications Wiring. RDS communication wiring shall meet the
following.
660.02.8 Type B Cabinet. All Type B cabinets, except those at solar power locations,
shall be uniform in manufacture and assembly, capable of supporting the field equipment as shown on the plans. As a minimum support is required for two RDS units, one Type A, B, D or E network switch, one video encoder, one Type A radio/antenna, RDS comm. cable and fiber drop panel terminations, regardless of the devices shown in the plans at a specific location. A complete Type B cabinet shall be an assembly consisting of a cabinet housing and electrical subsystems. A Type B cabinet housing shall be provided that conforms to the standards for a Type 170 336S with approximate exterior dimensions of 46 inches (H) x 24 inches (W) x 23 inches (D), including standard EIA 19-inch rack cabinet cage, as defined in the latest version of the Caltrans Transportation Electrical Equipm ent Specifications (TEES). The minimum clear vertical inside dimension of the 19-inch rack for equipment mounting shall be 39.5 Section 660 Section 660 inches. Standard cabinet accessories for traffic signal operations, such as controller, power distribution assembly, input/output file and termination panels, and the police panel, are not required as part of this cabinet assembly.
660.02.8 1--Hardware. All mounting hardware necessary for base or pole mounting as
shown on the plans shall be provided. As a minimum, three (3) 3/4-inch stainless steel mounting straps shall be provided for pole mounted cabinets. Hooks welded to the inside of each cabinet door shall be proved for hanging a side-opening, opaque, resealable, heavy-duty plastic documen tation pouch with metal or hard-plastic reinforced holes for the door hooks. One pouch shall be proved with each cabinet. A rack-mounted cabinet sliding storage drawer shall be proved in accordance with the following:
660.02.8 2--Electrical Subsystems. Type B cabinet electrical subsystems shall meet the
following requirements. Note that the Type B cabinets at solar power locations are not required to meet Subsection 660.03.2 requirements.
660.02.8 3--Lighting Subsystem. A cabinet lighting subsystem shall be provided
comprised of the following components:
660.02.8 4--RDS Communications Subsystem. Where RDS are shown in the plans, DIN
rail-mounted components shall be have a nominal 24VDC output power supply, capable of user setting between 23 and 28VDC minimum, with minimum 1A output rating and minimum operating temperature range of -13°F to +158°F. Power supply shall provide terminal facilities for a minimum of three sets of #14 AWG conductors (in the RDS comm cable). Maximum size of the power supply shall be 1 inch (W) x 7 inches (H) x 7 inches (D). The power supply shall be connected to the EQUIP POWER distribution block for 120VAC input. Section 660 Section 660 Interconnection wiring shall be provided between the RDS communications subsystem and the Terminal Server. Surge suppressor for the RS485 data signal, wired between the terminal server and the RDS units shall be provided. The surge suppressor shall protect the 4-wire RS485 data signal with hybrid multi-stage suppression components including gas tube and silicon avalanche diode. The surge suppressor shall have a response time no greater than 1 nanosecond. The surge suppressor shall provide terminal facilities for a minimum of four two-pair cables of #22 AWG conductors.
660.02.8 5--CCTV Subsystem. The requirements listed in Subsection 643.02.2.6 shall be
met by installing the required CCTV support equipment in the Type B Cabinet.
660.02.9 Type C Communication Hub Cabinet. A complete Type C cabinet shall be
an assembly consisting of a cabinet housing, base and electrical subsystems. The Type C cabinet shall be an AASHTO/ITE/NEMA ITS Cabinet Standard specification Cabinet Housing #3 with two Cages #1. It shall be equipped with four (4) side mounting panels in the rack cabinet cages. The side mounting panels shall mount from inside the rack cabinet cage only. The side panels shall be fabricated from 5052 sheet aluminum alloy with a minimum thickness of 0.125 inch with minimum dimensions of 50 inches (H) x 21 inches (W). Standard cabinet accessorie s for traffic signal operations, such as controller, power distribution assembly, input/output file and termination panels, and the police panel, are not required as part of this cabinet assembly. A minimum of four (4) wiring pass-through holes shall be provided on the inside mounting panels to permit patch cords to pass between the two cabinet sides. Each pass-through hole shall be five (5) inches in diameter and shall be fully grommetted for patch cord protection, with the holes positioned with two (2) in the cabinet front and two (2) in the cabinet rear and aligning horizontally between the two side panels.
660.02.9 1--Hardware. The hardware shall consist of a minimum of 16 plastic-coated or
rubber-coated J-hooks or D-rings, minimum 1-inch depth and height, on the inside rails of the rack cabinet cages, to organize patch cords passing between the two cabinet sides. The J-hooks shall be installed in horizontally-ali gned pairs on the inside rails, with four (4) pairs in the cabinet front and four (4) pairs in the cabinet rear. Hooks shall be welded to the inside of the two front cabinet doors for hanging the plastic documentation pouch. Two plastic documentation pouches shall be provided to store the cabinet and equipment documentation. Pouches shall be side-opening, re-sealable, opaque, and of a heavy-duty plastic material. Pouches shall have metal or hard-plastic reinforced holes for hanging from hooks included on the cabinet door. The pouches shall be of the size and strength to easily hold all wiring diagrams, equipment documentation, maintenance logbooks, etc. Two sliding drawers shall be installed that are aluminum storage compartments mounted in the rack assembly with the approximate following dimensions: 1.75 inches (H) x 16 inches (W) x 14 inches (D). The compartments shall have telescoping drawer guides to allow full extension from the rack assembly. When extended, the storage compartments shall open to provide storage space for cabinet documentation and other miscellaneous Section 660 Section 660 items. Storage compartment shall be of adequate construction to support a weight of 25 pounds when extended. The tops of the storage compartments shall have a non-slip plastic laminate attached which covers a minimum of 90% of the surface area of the top.
660.02.9 2--Electrical Systems. Type C cabinet electrical subsystems shall include an
electrical distribution module comprised of the following components:
660.02.9 3--Lighting Subsystem. The lighting subsystem shall be four (4) fluorescent
lighting fixtures mounted inside the top portions of each cabinet side. A cool white lamp, covered and operated by a normal power factor UL listed ballast shall be included with the fixture. A RC network noise suppression filter shall be installed in the light circuit. Door actuated switches shall be installed in the front and rear of each cabinet side, configured to turn on all cabinet lights when any door is opened. The lighting fixtures shall be powered from the ACCY POWER distribution block.
660.03 Construction Requirements.
660.03.1 General. This work shall meet the following general requirements.
Cabinets shall be installed and configured as shown in the plans and according to manufacturer’s recommendations, including installations and dimensions given for pole- mounting in relationship to the surrounding grade. All cabinets shall be bound to the pole grounding lug with minimum #6 AWG stranded copper bare or green-insulated cabinet grounding wire. Alternately on existing poles only, the cabinet grounding wire shall be bound to an existing pole grounding wire with a cast brass or copper alloy threaded compression connector within 4 inches of the existing pole grounding lug. Electrical service or electronic devices shall not be installed in the cabinet or connected to the cabinet until ground testing for the pole or structure has been successfully completed and accepted, and the cabinet ground connection has been installed. A cabinet wiring and interface diagram shall be provided and included in the required hanging, side-opening, re-sealable opaque, heavy duty plastic documentation pouch.
660.03.2 Type B and C. Equipment in the Type B and C cabinets shall be installed and
configured in accordance with the requiremen ts for that equipment, including RDS units, CCTV, Type A, B, D or E network switches, video encoders, Type A radio/antennas, RDS comm. cables and/or fiber distribution or drop panels. Electronic devices shall not be installed in the cabinet until electrical service has been installed and activated, and the cabinet ventilation fan is operational. Section 660 Section 660 Network switches and video encoders shall be installed in the top most area of the cabinet rack. The equipment receptacles shall be used for power. Supporting equipment/electronics for CCTV shall be installed on the lower area of the cabinet upper left side panel. There shall be no physical or access conflict with the network switch and video encoder. The EQUIP POWER distribution block shall be used for the power source. Fiber drop panels shall be installed in a vertical configuration on the lower rear edge of the cabinet upper right side panel.
660.03.3 Testing. The Contractor shall conduct a Project Testing Program as required
below. All costs associated with the Project Testing Program shall be included in overall contract prices; no separate payment will be made for any testing. The ITS Engineer, Project Engineer and/or their designee(s) shall only be responsible for attending and observing each test, and reviewing and approving the Contractor's test results documentation. The ITS Engineer, Project Engineer and/or their designee(s) reserve the right to attend and observe all tests. The Contractor will be required to perform the Conditional Acceptance test with the the Department ITS Engineer or his designee present. The Contractor shall conduct a project tes ting program for all eq uipment cabinets. The project testing program shall include but is not limited to the specific requirements in this subsection. All test results shall confirm physical and performance compliance with the specifications. All test results documentation shall be submitted to the Engineer within seven (7) days of completion of the tests. The Engineer will review test documentation.
660.03.3 1--Standalone Acceptance Test (SAT). A SAT shall be performed on all
equipment cabinets on this project after field installation is complete including, but not limited to, all field devices (RDS, CCTV, communications electronics, etc.) to be installed in or connected to that given cabinet. A SAT for a given equipment cabinet shall only be performed in conjunction with the SAT for all devices installed in or connected to that given cabinet. A visual inspection shall be made of the installation and the cabinet documentation. Functional test shall be made of all cabinet equipment, including circuit breaker, receptacles, fan and thermostat, and lights and door switches. A measurement of DC power supply shall be made when operating under full load.
660.04 Method of Measurement. Equipment Cabinet of the type specified will be
measured per each. Cabinet modifications will be measured per each installation.