11-16 Historical performance of the TMA will help determine the future use of the material by the
Department, even if the TMA has been approved . Poor performance of TMA at any site, wheth er or not related to a specific contract, may be grounds for non -acceptance of a product on any project under contract. 1165 -3 CONSTRUCTION METHODS Before use, furnish the Engineer detailed brochures, manufacturer’s specifications and other data that completely describes the performance criteria, installation and instructions for the TMA. Do not park TMAs against rigid objects ( i.e., bridge piers or portable concrete barrier) except as a temporary safety measure and i n no case for longer than 72 hours. Install the TMA on a truck that is fully operational, in good running order and in accordance with the manufacturer’s specifications. Use the appropriate lighting as described in Article 1101 -5 and delineation on the tr uck and TMAs as shown in the Roadway Standard Drawings . TMA trailer lighting systems shall be activated in the flash mode while deployed. Repair or replace within 24 hours any attenuator that becomes crushed or otherwise damaged so that it will perform its intended purpose. Suspend all construction activities until the attenuator is repaired or replaced. Provide safe control of traffic until the attenuator has been repaired or replaced using approved methods. 1165 -4 MEASUREMENT AND PAYMENT TMA will be measured and paid as the maximum number of TMAs acceptably placed and in use at any one time during the life of the project for all operations other than Moving and Mobile Operations. TMAs will be incidental to all moving and mobile operations. In the case of emergency situations, TMAs will not be paid when payment has already be en made for a stationary unit. Relocation of TMAs will be incidental to the measuremen t of the quantities of TMAs and no separate payment will be made. Payment will be made under: Pay Item Pay Unit TMA Each 1170 -1 DESCRIPTION Furnish, install, secure, maintain, remove and reset portable concrete barrier or water filled barrier . 1170 -2 MATERIALS Refer to Division 10. Item Section Anchor Bolts 1072 -4 Anchor Bolt Adhesive 1081 Concrete Barrier 854 Grout, Type 3 1003 Guardrail and Barrier Delineators 1088 -2 Portable Concrete Barrier 1090 Provide barrier and delineators t hat are listed on the NCDOT APL .
11-17 Historical performance of the barrier will help determine use of the material by the
Department, even if the barrier has been approved. Poor performance of the barrier at any site, whether or not related to a specific contract, may be grounds for non- acceptance of a product on any proj ect under contract. 1170 -3 CONSTRUCTION METHODS
11-18 (b) Adhesive Anchoring Method for Concrete Surfaces
Comply with Subarticle 1170- 3(A)(1)(a). Mix adhesives in strict conformance with the manufacturer's instructions. Pour the mixed adhesive into the hole. Agitate or rotate anchors to ensure complete wetting and encapsulation. Insert the anchors to the spe cified depth. Completely fill the anchor hole with adhesive and remove any excess adhesive flush with the pavement. Do not disturb any anchors while the adhesive is hardening. Coat all anchors to be adhesively bonded with a debonding agent to ease remov al. Formulate the debonding agent such that it does not reduce the strength of the anchor system.
11-19 (D) Barrier Delineators
Furnish barrier delineator for portable concrete and water filled barrier. T op mount delineator s for barrier throughout the project. Side mounted delineators may be used to supplement the top mounted delineators. Attach the delineator to the barrier using methods and spacing as shown in the Roadway Standard Drawings . The delineators consist of a reflector and base or casing. Position delineators perpendicular to the centerline of the road. Use yellow delineators in the median and on the left side of one -way ramps, l oops or other one -way facilities. Use white delineators on the right side of divided highways, ramps, loops and all other one - way or two -way facilities. In all cases, the color of the delineator shall supplement the color of the adjacent edgelines. 1170 -4 MEASUREMENT AND PAYMENT Portable Concrete Barrier ( ____) will be measured and paid as the maximum number of linear feet furnished, satisfactorily installed, accepted by the Engineer, maintained and removed , at any one time during the life of the project . Measurement will be made by counting the number of barrier units used and multiplying by the length of a unit. Water Filled Barrier will be measured and paid as the maxi mum number of linear feet furnished, satisfactorily installed, accepted by the Engineer, maintained and removed , at any one time during the life of the project . Measurement will be made by counting the number of barrier units used and multiplying by the l ength of a unit. Remove and Reset Portable Concrete Barrier ( ____) will be measured and paid as the number of linear feet of barrier moved from one location on the project to another location on the project. Measurement will be made by counting the number of barrier units moved during any one move and multiplying by the length of a unit. Where barrier units are moved more than once, each move will be measured separately. Whenever the Engineer directs the Contractor to move barrier units from an installed location to a stockpile either on or off the project and then back to another installed location, the complete move from the first installed location to the next installed location will be measured as 2 moves. Remove and Reset Water Filled Barrier will be measured and paid as the actual number of linear feet of barrier moved from one location on the project to another location on the project. Measurement will be made by counting the number of barrier units moved during any one move and multiplying by the length of a unit. Where barrier units are moved more than once, each move will be measured separately. Whenever the Engineer directs the Contractor to move barrier units from an installed location to a stockpile either on or off the project and then back to another installed location, the complete move from the first installed location to the next installed location will be measured as 2 moves . Provide barrier stockpile area s at no cost to the Department. B arrier delineators will be incidental to these pay items. Payment will be made under: Pay Item Pay Unit Portable Concrete Barrier Linear Foot Portable Concrete Barrier (Anchored ) Linear Foot Water Filled Barrier Linear Foot Remove and Reset Portable Concrete Barrier Linear Foot Remove and Reset Portable Concrete Barrier (Anchored ) Linear Foot Remove and Reset Water Filled Barrier Linear Foot