15-16 (D) Testing
Vacuum test all manholes before grouting and backfilling. Test a ccording to ASTM C1244. 1525 -4 MEASUREMENT AND PAYMENT The height of the manhole will be measured and paid to the nearest tenth of a foot from the inside bottom (invert) of the manhole to the final finished top of the manhole ring. __' Dia Utility Manhole and Utility Manhole Wall __' Dia will be measured and paid by appropriate diameter per each for manholes of 0 to 6 feet height and per linear foot of height over 6 feet. Adjustment or reconstruction of existing manholes will be measured and paid in accordance with Article 858 -4. Drop assemblies will be incidental to the work being performed . Payment will be made under: Pay Item Pay Unit __' Dia Utility Manhole Each Utility Manhole Wall __' Dia Linear Foot 1530 -1 DESCRIPTION Abandon or remove utility facilities. 1530 -2 MATERIALS Refer to Division 10. Item Section Flowable Fill 1000 -7 Portland Cement Concrete 1000 Select Materials 1016 1530 -3 CONSTRUCTION METHODS Apply Section 1505 for excavation, trenching, pipe laying and backfill.
15-17 Excavate, remove and dispose of properly any abandoned pipe to be removed. Backfill
the resulting trench and properly compact using local excavated material or select backfill as required. Fill abandoned pipe wit h grout or flowable fill to at least 90% full or completely when on railroad right of way. Remove any abandoned utility pipe exposed by grading operations to a minimum depth of 12 inches below subgrade elevation of the proposed roadbed or completed grading template. Plug all abandoned utility pipes. Use grout to plug all abandoned utility pipes at the entrance to all manholes whether the manhole is to be abandoned or not. Use grout or flowable fill to plug all abandoned water mains after new mains are pla ced in service. Abandon valves by removing valve box and backfilling with approved material.