Division 3 — Aggregates

340PIPE REMOVAL

NC · 2024 Standard SpecificationsBook pages 134135View official source ↗

3-8 Use s uppliers of metal pipe culverts, fittings and all other accessories covered by this section 1

that meet the Department’s Brand Certification program requirements for metal pipe culverts and are listed on Materials and Tests Unit’s pre-approved producer/ suppliers list as listed on the NCDOT APL . The pre -approved list is available on the Department’s website.

330-3 Pipe Installation

Install the pipe by trenchless construction, true to line an d grade and so settlement does not occur. Fill all voids around the pipe. Replace i nstallations that become damaged or have to be abandoned. Conduct a pre -construction meeting in the presence of the Engineer at least 48 hours before the beginning of the pipe installation. The meeting shall consist of , but not be limited to:

A.Reviewing all installation methods to install the pipe true to the line and grade given,
B.Methods to insure there is no settlement of the pipe or of the completed roadway section, and
C.Methods for filling any potential voids around the pipe.

330-4 Measurement and Payment

__" Welded Steel Pipe , __" Thick, Grade B in Soil will be measured and paid as the actual number of linear feet of pipe measured along the flow line to the nearest foot, which has been installed in soil. __" Welded Steel Pipe, __" Thick, Grade B Not in Soil will be measured and paid as the actual number of linear feet of pipe measured along the flow line to the nearest foot which has been installed in non -soil, as observed and confirmed by the Engineer. Non- soil is defined as all material other than soil. The Contractor shall request and obtain the Engi neer’s observation and confirmation of the limits of the installation not in soil before and during the installation of the pipe or portion of the pipe not in soil. Failure of the Contractor to request and obtain the Engineer’s observation and confirmation of the limits of the pipe not in soil before and during the installation will result in the payment at the unit price for __" Welded Steel Pipe, __" Thick, Grade B in Soil . Such payment will include, but is not limited to , furnishing all labor, tools, equipment, materials and incidentals, miscellaneous grading or excavation necessary to complete the work. Installations that become damaged or are abandoned will be re placed at no cost to the Department. Payment will be made under: Pay Item Pay Unit __" Welded Steel Pipe, __" Thick, Grade B in Soil Linear Foot __" Welded Steel Pipe , __" Thick, Grade B Not in Soil Linear Foot

340-1 Description

Remove and dispose of all existing roadway drainage pipe, including flared end sections, where the removal of the existing pipes is required by the plans or as directed by the Engineer . Unless otherwise indicated i n the plans, this work excludes the removal and disposal of any existing public or private water or sewage pipe or subsurface and shoulder drain pipe. The Contractor has the option of leaving pipes in place and filling with flowable fill.

3-9 340-2 Materials

Refer to Division 10. Item Section Chemical Admixtures 1024 -3 Fine Aggregate 1014 -1 Flowable Fill 1000 -7 Fly Ash 1024 -5 Portland Cement 1024 -1 Type IP Blended Cement 1024 -1 Type IS Blended Cement 1024 -1 Water 1024 -4 For fine aggregate, bottom ash may be used with permission of the Engineer. For chemical admixtures, h igh-air generators or foaming agents may be used instead of conventional concrete air -entraining agents with the permission of the Engineer. For fly ash, c ertain requirements of this article and ASTM C618 may be waived with the permission of the Engineer.

340-3 Construction Methods

Remove existing pipe when so designated i n the plans or as directed by the Engineer . When an existing pipe is encountered that is not shown i n the plans, do not remove until the Engineer is notified of its presence and has directed its removal. Remove pipe in sections so traffic is maintained. Remove existing pipe so nearby facilities will not be damaged. Backfill the area disturbed by the removal of an existing pipe in accordance with the Standard Specifications applicable to the adjacent construction. Salvaged pipe is the property of the Contractor unless otherwise indicated by the contr act. Discharge flowable fill material directly from the truck into the space to be filled or by other methods approved by the Engineer . The mix may be placed full depth or in lifts as site conditions warrant.

340-4 Measurement and Payment

Pipe Removal will be measured and paid as the actual number of linear feet of pipe and flared end sections, measured to the nearest 0.1 f eet that has been removed in accordance with this section. No measurement and payment will be made for pipe removal when a new pipe is placed back in the same trench. Flowable Fill will be measured and paid as the item for which it was substituted. In no case will payment for the use of flowable fill as a substitute be made for more than one deleted item of work. Any additional backfill material that is necessary will be paid at the contract unit price for Unclassified Excavation in accordance with Article 225 -7 or at the contract unit price for Borrow Excavation in accordance with Article 230 -5, depending on the source of the material. Payment includes but is not limited to removing pipe, hauling pipe and all excavating and backfilling that may be necessary. Payment will be made under Pay Item Pay Unit Pipe Removal Linear Foot

Source: North Carolina Standard Specifications for Roads and Structures, 2024 Edition. Pages 134135 of 857.