originally staked or beyond the limits of the right of way or easements shown on the original plans will be measured and paid at the contract unit price per acre for Supplementary Clearing and Grubbing. All measurements will be made horizontally. Where the contract does not include this item, a unit price per a cre will be established by supplemental agreement. Undercut Excavation will be measured and paid at the contract unit price per cubic yard. No separate payment will be made for materials used in backfilling the undercut areas, shoulders and slope areas as payment at the contract unit price per cubic yard for Undercut Excavation will be full compensation for furnishing such material. Where the contract does not include a pay item for Undercut Excavation , payment for such excavation will be made in accordance with Article 104-7. Payment will be made under: Pay Item Pay Unit Grading Lump Sum Supplementary Clearing and Grubbing Acre Undercut Excavation Cubic Yard
230-1 Description
Excavate approved material from borrow sources. Haul and us e such material as required in the plans or as directed by the Engineer . Do not use borrow excavation until all available suitable unclassified excavation has been incorporated into the embankments, subgrades and shoulders except by execution of a supplemental agreement documenting the conditions prescribed below.
230-2 Coordination With Seeding Operations
Coordinate the work in this section with the construction of embankments in accordance with
Article 225 — 2.
230-3 Materials
Refer to Division 10.
2-19 Item Section
Borrow Material 1018 Shoulder and Slope Material 1019
230-4 Construction Methods
Article 200 — 6. Remove and dispose of overburden in accordance with Section 802.
Do not accumulate exposed, erodible slope area in each borrow operation in excess of 1 acre at any one time without beginning permanent seeding and mulching of the borrow source or installing other appr oved erosion control measures. Remove and stockpile topsoil at locations that will not interfere with the borrow operations and that meet the approval of the Engineer. Install temporary erosion control measures as needed to prevent the erosion of the stoc kpile material. Once all borrow has been removed from the source or portion thereof, uniformly spread the stockpiled topsoil over the area and permanently seed and mulch the area. Where payment is made by cross section, notify the Engineer sufficiently be fore beginning excavation of the borrow material so that the area may be staked and cross sectioned. Excavate the material to the lines and slopes as staked in an orderly manner to facilitate measurement at any time. Where payment is to be made by truck measurement, furnish trucks with bodies suitable for accurate measurement. Load trucks uniformly and load to prevent spillage. When necessary to haul borrow material over existing roads or streets, comply with
Article 105 — 15. Use all necessary precautions to prevent damage to the existing
structures or pavement. Conduct hauling operations so as to not interfere with the normal flow of traffic and keep the traffic lanes free from spillage at all times. Furnish borrow s ources except where otherwise indicated in the contract.
2-20 the owner that the borrow source be dressed, shaped, seeded, mulched and drained as
required by these s pecifications after all borrow has been removed.
2-21 (d) Evaluation for Potential Wetlands and Endangered Species
Hire a pre qualified environmental consultant to perform an assessment of the borrow site for potential conflicts with wetlands, Areas of Environmental Concern designated by the Coastal Area Management Act and federally protected species. This evaluation will not be required for permitted commercial sites. Delineate the boundaries of any wetlands, jurisdictional surface waters and streams encountered. Follow the standard practice for documenting the wetland delineation including completion of the USACE’s approved Jurisdictional Determination Form . Document information including data regarding soil, vegetation and hydrology. Maintain a minimum 25 foot buffer adjacent to all sides of the wetland boundary and a minimum 50 foot buffer adjacent to any stream. Depict the limits of the delineated wetland and surrounding buffer on the Reclamation Plan. Do not remove borrow material in any area under the USACE ’ or any other environmental agencies’ regulatory jurisdiction unless and until the Department permit has been modif ied to allow such disposal activity in the jurisdictional area. Perform a site assessment for federally listed threatened or endangered species to include habitats that may support these species. Provide a detailed technical report on the assessment findi ngs. If federally listed threatened or endangered species or habitat that may support such species exist on the proposed borrow site, notify the Engineer before continued pursuit of such site.
2-22 (C) Maintenance
During construction and until final acceptance, use any methods approved by the Engineer that are necessary to maintain the work covered by this section so that the work will not contribute to excessive soil erosion.
230-5 Measurement and Payment
Borrow Excavation will be measured and paid in cubic yards . Borrow Excavation will be measured in place in its original position except that truck measurement will be made where called for in the contract or as determined by the Engineer . If the quantity of borrow excavation used is excessive as evidenced by the presence of surplus suitable material from the roadway excavati on, the measured quantity of borrow excavation will be reduced by the quantity of such surplus suitable material.