8-7 If the Engineer determine s intermediate cross sections are not necessary for computing partial
payments, the intermediate stakeout of the survey line is incidental to the work. Supplemental Surveying Office Cal culations will be measured and paid as the actual number of hours the Contractor’s survey personnel is actively engaged in performing office calculations specifically associated with Subarticles 801- 3(A) through 801- 3(E). Supplemental Surveying Office Calc ulations will be paid at the stated price of $ 85.00 per hour. Supplemental Field Surveying will be paid at the stated price of $ 145.00 per hour. The payment includes furnishing personnel, all surveying equipment, stakes, layout drawings, calculations, stakeout records and any materials and equipment necessary to perform the surveying and engineering work. If the Engineer directs that the accuracy of the original stakeout be checked and the stakeout is found to be in error, perform the work required to check and correct the stakeout at no cost to the Department. Exploratory Excavation required to locate a utility not identified in the plans will be paid in accordance with Article 104-7. Work Zone Signs (Portable) will be paid in accordance with Article 1110- 4. Flaggers will be paid by the day in accordance with Article 1150 -4. Any payments for Supplemental Field Surveying or Supplemental Surveying Office Calculations required by this section will be paid on the appropriate par tial payment estimate. Payment will be made under: Pay Item Pay Unit Construction Surveying Lump Sum Supplemental Field Surveying Hour Supplemental Surveying Office Calculations Hour
802-1 Description
The work consists of the disposal of waste and debris including, but not limited to, furnishing any waste areas; providing and implementing a Development, Use and Reclamat ion Plan; any right of access to waste areas; disposing of waste and debris; dressing and shaping of waste areas; furnishing and spreading earth material over debris, rock, broken pavement and masonry; clearing and grubbing of waste areas; hauling waste an d debris to waste areas or permitted landfills; assessment for wetlands and endangered species; obtaining required permits or certifications; and any tipping fees required for disposal in permitted landfills. Define “waste ” as all excavated materials that are not us ed in the construction of the project, including overburden from borrow sources and soil -type base course sources. Define “debris ” as all undesirable material encountered on the project.
802-2 General Requirements
Follow the most recent reclamation procedures found on the Department’s website for all waste sites. Before the removal of any waste from any project, obtain certification from the State Historic Preservation Officer of the State Department of Cultural Resources certifying that the deposition of the waste material to the proposed waste area will have no effect on any known district, site building, structure or object, architectural or archaeological, that is included , or eligible for inclusion , in the National Register of Historic Places. Furnish a copy of this certification to the Engineer before performing any work in the proposed waste site.
8-8 Provide an area and dispose of waste and debris outside of the right of way, unless otherwise
allowed by written request. Limit the materials placed in non -permitted disposal areas to clean soil, rock, concrete, brick, other inert materials and bituminous asphalt when placed at least 4 feet above the water table. Mixtures of soil and vegetation, that are primarily soil, may be placed in non -permitted disposal areas. Place all other debris in sites permitted by the Solid Waste Management Division of NCDEQ, unless otherwise approved. Maintain the earth surfaces at all waste areas in a manner that will effectively control erosion and siltation until final acceptance of the project. Shape the waste or disposal area to drain such that no water will collect or stand. Provide a functioning drainage system. Shape rock and earth waste to contour and blend with the adjacent topography. Cover all rock, concrete, broken pavement and masonry with a minimum 6 inch thick layer o f earth material from the project or borrow. Earth material should be tested to insure it will support long -term growth of the proposed ground cover and should be amended as necessary to support permanent growth. As an exception, side slopes constructed of all rock material will not require earth covering. Construct all slopes, other than rock, 2:1 or flatter. Construct rock slopes on a stable angle of repose. Where the Engineer has granted permission to dispose of waste within the right of way, the Engineer will have the authority to establish whatever additional requirements may be necessary to insure the satisfactory appearance and drainage of the completed project. Where electing to dispose of waste or debris in active public waste or disposal sites, provide evidence satisfactory to the Engineer that the Solid Waste Management Division of NCDEQ has permitted the proposed area or site. Where electing to dispose of waste in a waste or disposal area, other than active public waste or disposal areas permi tted by the Solid Waste Management Division of NCDEQ or on the Department’s right of way or an existing borrow pit, submit jointly with the property owner a notarized Development, Use and Reclamation Plan for each waste or disposal area proposed for use. As part of the Reclamation Plan, perform the following before wasting:
8-9 (D) Construction Debris
Cover construction debris and all broken pavement and masonry with a minimum 6 inch thick layer of earth waste material from the project or borrow. Shape the completed waste area as required above for the disposal of earth or rock waste.