B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
Division 16 — Intelligent Transportation

1675RESPONSE FOR EROSION CONTROL

NC · 2024 Standard Specifications✓ Full text on BuildSpecBook pages 798–798 Save this section

Ask about Section 1675

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

16-48 Section 1675 1

RESPONSE FOR EROSION CONTROL 2 1675 -1 DESCRIPTION 3 Furnish the labor, materials, tools and equipment necessary to move personnel, equipment, 4 and supplies to the project necessary for the pursuit of any or all of the following work shown 5 in Table 1675- 1, by a prequalified subcontractor . 6 TABLE 1675 -1 RESPONSE FOR EROSION CONTROL WORK LIST Section Erosion Control Item Unit 1605 Temporary Silt Fence LINEAR FEET (LF) 1606 Special Sediment Control Fence LF/TON 1615 Temporary Mulching ACRE 1620 Seed - Temporary Seeding LB 1620 Fertilizer - Temporary Seeding TON 1631 Matting for Erosion Control SY 1629 Coir Fiber Mat SY 1640 Coir Fiber Baffles LF SP Permanent Soil Reinforcement Mat SY 1660 Seeding and Mulching ACRE 1661 Seed - Repair Seeding LB 1661 Fertilizer - Repair Seeding TON 1662 Seed - Supplemental Seeding LB 1665 Fertilizer Topdressing TON SP Safety/Highly Visible Fencing LF 1675 Response for Erosion Control EA 1675 -2 CONSTRUCTION METHODS 7 Provide an approved subcontractor who performs an erosion control action as described in the 8 NPDES Inspection Form SPPPForm30. Each erosion control action may include one or more 9 of the above work items . 10 1675 -3 MEASUREMENT AND PAYMENT 11 Response for Erosion Control will be measured and paid for by counting the actual number of 12 times the subcontractor moves onto the project, including borrow and waste sites, and 13 satisfactorily completes an erosion control action described in Form 1675. The provisions of 14

Article 104 — 5 of the Standard Specifications will not apply to this item of work. 15

Payment will be made under: 16 Pay Item Pay Unit Response for Erosion Control Each

Referenced in this section

Get an email when 1675 changes

North Carolina revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: North Carolina Standard Specifications for Roads and Structures, 2024 Edition. Pages 798–798 of 857. View official source ↗

Ask about this section

Scoped to North Carolina 2024 Standard Specifications for Roads and Structures, Section 1675 — RESPONSE FOR EROSION CONTROL. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.