6-7 (C) Incidental Milling
Incidental Milling to be paid will be the actual number of square yards of surface milled where the Contractor is required to mill butt joints, irregular areas , full width turn lanes 500 feet or less, intersections and re -mill areas that are not due to the Contractor’s negligence. In measuring this quantity, the length will be the actual length milled, measured along the pavement surface. The width will be the width required by the plans or directed by the Engineer , measured along the pavement surface. Where the Contractor elects to make multiple cuts to achieve the final depth, no additional measurement will be made. Compensation will be made at the contract unit price per square yard for Incidental Milling .
609-1 Description
Produce and construct asphalt mixtures and pavements in accordance with a quality management system as described herein . Apply these Standard Specifications to all materials and work performed in accordance with Division 6. Perform all quality control ( QC) activities in accordance with the Department’s Asphalt Quality Management System (QMS) Manual in effect on the date of contract advertisement.
609-2 Mix Design/Job Mix Formula Requirements
Apply all requirements of Article 610 -3.
609-3 Field Verification of Mixture and Job Mix Formula
ADJUSTMENTS Conduct field verification of the mix at each plant within 45 calendar days before initial production of eac h mix design, when required by the Allowable Mix Adjustment Policy as
6-8 defined in Section 7.4 of the Asphalt QMS Manual and when directed by the Engineer as
deemed necessary. Field verification testing consists of performing a minimum of one full test serie s on mix sampled and tested in accordance with Subarticle 609 -6(B). Mix obtained from Department or non -Department work may be used for this purpose provided it is sampled, tested and the test data handled in accordance with the Asphalt QMS Manual and this article . Obtain the mix verification sample and split in accordance with procedures in the Asphalt QMS Manual. Do not begin normal plant production until all field verification test results have been completed and the mix has been satisfactorily verifi ed by the Contractor’s Level II technician . In addition to the required sampling and testing for field verification, perform all preliminary inspections and plant calibrations as outlined in the Asphalt QMS Manual . Retain records of these calibrations a nd mix verification tests at the QC laboratory. F urnish copies to the Engineer for review and approval within one working day after beginning production of the mix. Failure by the Contractor to fully comply with the above mix verification requirements wil l result in immediate production stoppage by the Engineer. Do not resume normal production until all mix verification sampling, testing, calibrations and plant inspections have been performed and approved by the Engineer .
609-4 Contractor'S Quality Control Personnel Requirements
Obtain all certifications in accordance with the Department’s QMS Asphalt Technician Certification Program as outlined in the Asphalt QMS Manual . Perform all sampling, testing, data analysis and data posting by or under the direct supervision of a certified QMS asphalt plant technician. Provide a certified asphalt plant technician Level I to perform QC operations and activities at each p lant site at all times during production of material for the project. A plant operator who is a certified asphalt plant technician Level I may be use d to meet this requirement when daily production for each mix design is less than 100 tons provided the randomly scheduled increment sample as defined in Section 7.3 of the Asphalt QMS Manual is not within that tonnage. When performing in this capacity, t he plant operator will be responsible for all QC activities that are necessary and required. Absences of the Level I technician , other than those for normal breaks and emergencies shall be pre -approved by the appropriate Engineer or his designated representative. Any extended absence of the technician that has not been approved will result in immediate suspension of production by the Engineer. All mix produced during this absence will be accepted in accordance with Article 105 -3. Provide and have readily available a certified asphalt plant technician Level II to supervise, coordinate and make any necessary adjustments in the mix QC process in a timely manner. The Level II technician may serve in a dual capacity and fulfill the Level I technician requirem ents specified above. Provide a certified QMS roadway technician with each paving operation at all times during placement of asphalt. This person is responsible for monitoring all roadway paving operations and all QC processes and activities, to include st opping production or implementing corrective measures when warranted. Provide a certified density gauge operator when density control is being used. Post in the QC laboratory an organizational chart, including names, telephone numbers and current certific ation numbers of all personnel responsible for the QC program while asphalt paving work is in progress.
6-9 609-5 Contractor'S Quality Control Field Laboratory
REQUIREMENTS For a contract with 5 ,000 or more total tons of asphalt mix, furnish and maintain a Department certified laboratory at the plant site meeting the minimum requirements outlined in Section 7.2 of the Asphalt QMS Manual . For a contract with less than 5 ,000 total tons of asphalt mix, the QC testing may be conducted in a Department certified off -site laboratory meeting the requirements . Provide testing equipment as required in Section 7.2 of the Asphalt QMS Manual . Provide equipment that is properly calibrated and maintained. Allow all measuring and testing devices to be inspected to confirm both calibration and condition. If at any time the Engineer determines that the equipment is not operating properly or is not within the limits of dimensions or cali bration described in the applicable test method, the Engineer may stop production until corrective action is taken. Maintain and have available a record of all calibration results at the laboratory.
609-6 Plant Mix Quality Control
6-10 associated tests do not substitute for the regularly scheduled ra ndom sample for that
increment.
6-11 (E) Corrective Actions
All required corrective actions are based upon initial test results and shall be taken immediately upon obtaining those results. I f more than one corrective action or adjustment applies , give precedence to the more severe of these actions. Stopping production when required takes precedence over all other corrective actions. Document all corrective actions. If the process adjustment improves the pro perty in question such that the moving average after 4 additional tests is on or within the moving average limits, the Contractor may continue production. When any of the following occur, production of a mix shall cease immediately:
6-12 The Department reserves the right to require the Contractor to resample and retest at any
time or location as directed by the Engineer . TABLE 609-2 RETEST LIMITS FOR MIX DEFICIENCIES Property Limit VTM by more than ± 2.5% VMA by more than ± 2.0% % Binder Content by more than ± 1.0% 0.075 mm sieve by more than ± 3.0% 2.36 mm sieve exceeds both the Specification mix design limits and one or more of the above tolerances TSR by more than - 15% from Specification limit
609-7 Field Compaction Quality Control
6-13 approval to produce a different mix design of the same mix type if Quality Control and
Quality Assurance plant mix test indicate the failing densities are attributed to the mix problem(s) rather than compaction related problems and limited production startup would not be required. The determination of whether a mix problem exists at this time will be made by QA personnel. If the Contractor does not operate by the limited production procedures when conditions as specified in Section 10.9 of the Asphalt QMS Manual , all mix produced thereafter will be unacceptable. Remove this material and replace with material that complies with the Standard Specifications , at no additional cost to the Department .
609-8 Contractor Quality Control Documentation (Records)
Document all QC activities, records of inspection, samples taken, adjustments to the mix and test results on a daily basis. Note the results of observations and records of inspection as they occur in a permanent field record. Record adjustment to mix production and tes t results on forms provided. Process control sample test results are for the Contractor’s informational purposes only. Make all such records available to the Engineer, upon request, at any time during project construction. Complete and maintain all QC re cords and forms and distribute in accordance with the Asphalt QMS Manual . Submit data electronically using the Department’s software. Failure to maintain QC records and forms as required, or to provide these records and forms to the Engineer upon request , may result in production stoppage, placement stoppage , technician certification revocation and removal from the NCDOT Certified Asphalt Plant List until the problem is resolved. Falsification of test results, documentation of observations, records of ins pection, adjustments to the process, discarding of samples and/or test results or any other deliberate misrepresentation of the facts will result in the revocation of the applicable person’s QMS certification. The Engineer will determine acceptability of the mix and/or pavement represented by the falsified results or documentation. If the mix and/or pavement in question is determined to be acceptable, the Engineer may allow the mix to remain in place at no pay for the mix, asphalt binder and other mix com ponents. If the mix or pavement represented by the falsified results is determined not to be acceptable, remove and replace with mix that complies with the Standard Specifications .
609-9 Quality Assurance
The Department's QA program will be conducted by a certified QMS technician(s) and will be accomplished based on the requirements of Section 7.6 for mix and Sections 10.5 and 10.7 for density in the Asphalt QMS Manual . Differences between the Contractor's and the Department's split sample test results will be acceptable if within the limits of precision in Table 609- 3.
6-14 Table 609-3
LIMITS OF PRECISION FOR TEST RESULTS Mix Property Limits of Precision 25.0 mm sieve (Base Mix) ± 10.0% 19.0 mm sieve (Base Mix) ± 10.0% 12.5 mm sieve (Intermediate & Type P -57) ± 6.0% 9.5 mm sieve (Surface Mix) ± 5.0% 4.75 mm sieve (Surface Mix) ± 5.0% 2.36 mm sieve (All Mixes , except S4.75A ) ± 5.0% 1.18 mm sieve (S4.75A) ± 5.0% 0.075 mm sieve (All Mixes) ± 2.0% Asphalt Binder Content ± 0.5% Maximum Specific Gravity (Gmm) ± 0.020 Bulk Specific Gravity (G mb) ± 0.030 TSR ± 15.0% QA retest of prepared QC Gyratory Compacted Volumetric Specimens ± 0.015 Retest of QC Core Sample ± 1.2% (% Compaction) Comparison QA Core Sample ± 2.0% (% Compaction) QA Verification Core Sample ± 2.0% (% Compaction) Density Gauge Comparison of QC Test ± 2.0% (% Compaction) QA Density Gauge Verification Test ± 2.0% (% Compaction) The Engineer will immediately investigate the reason for differences if any of the following occur: QA test results of QC split sample does not meet above limits of precision, QA test results of QC split sample does not meet the individual test control limits or the specification requirements or QA verification sample test results exceed the allowable retesting tolerances. If the potential for a pavement failure exist, the Engineer may suspend production, wholly or in part, in accordance with Article 108 -7 while the investigation is in progress. The Engineer's investigation may include, but not be limited to: review and observation of the QC technician's sampling and testing procedures, evaluation and calibration of QC and QA testing equipment, comparison testing of other retained quality control samples, and/or comparison testing of additional density core samples. The Engineer will periodically witness the sampling and testing being performed by the Contractor. If the Engineer observes that the sampling and QC tests are not being performed in accordance with the applicable test procedures, the Engineer may stop production until corrective action is taken. The Engineer will promptly notify the Contractor of observed deficiencies, both verbally and in writing. The Engineer will document all witnessed samples and tests.
609-10 Acceptance
Final acceptance of the asphalt pavement will be made by the Department in accordance with the following: