6-34 Section 650
OPEN -GRADED ASPHALT FRICTI ON COURSE
650-1 Description
Perform the work covered by this section including, but not limited to , construction of a plant mixed open -graded asphalt friction course (OGFC) properly laid upon a prepared surface in accordance with these s pecifications and in conformity with the lines, grades, thi ckness and typical sections shown on the plans; producing, weighing, transporting, placing and rolling the plant mix as specified in Section 610; furnishing the asphalt binder, anti -strip additive, fiber stabilizing additive , warm mix asphalt (WMA) additive and all other materials for the plant mix; furnishing and applying tack coat as specified; providing QC as specified in Section 609 as modified for OGFC; surface testing of the completed pavement; furnishing scales; making any repairs or correctio ns to the friction course that may become necessary and maintaining the friction course until final acceptance of the project.
650-2 Materials
Refer to Division 10. Item Secti on Anti-strip Additive s 1020 -8 Asphalt Binder, Performance Grade 1020 -2 Coarse Aggregate 1012 -1(B) Fiber Stabilizing Additives 1020 -10 Fine Aggregate 1012 -1(C) Mineral Filler 1012 -1(D) Reclaimed Asphalt Shingles (RAS) 1012 -1(E)
650-3 Composition of Mixture (Mix Design and Job Mix Formula)
6-35 If needed to prevent asphalt draindown, i ncorporate a stabilizing additive into all OGFC
mixes . Stabilizing additives may be fibers meeting Article 1020 -10, RAS, or an approved WMA additive. Add fiber or RAS at a dosage rate by weight of total mixture as approved by the Engineer . Add WMA additive at a dosage rate by weight of binder in the mix. If a WMA additive is used to prevent draindown, produce OGFC at a lower mix temperature as shown on the approved JMF. In addition to the required mix design submittal, the Contractor shall prepare and deliver gyratory compactor specimens to the Department’s Central Asphalt Laboratory for Cantabro durability testing. The Contractor shall prepare these specimens using lab produced mix in accordance with NCDOT procedures. Provide the samples at least 20 days before the anticipated beginning placement of OG FC mixture. TABLE 650-1 OGFC DESIGN CRITERIA Grading Requirements Total Percent Passing Sieve Size (mm) Type FC -1 Modified 19.0 - 12.5 100 9.50 75 - 100 4.75 25 - 2.36 5 - 0.075 1.0 - 3.0 Asphalt Binder Grade PG 76 -22 Binder Content, % 5.5 - 8.0 Mixing Temperature at the Asphalt PlantA 300 – 325°F Air Voids, % minimum 18.0 Cantabro Loss, % maximum 20.0 Draindown, % maximum 0.3
650-4 Plant Equipment
Use plant equipment in accordance with Article 610 -5 and the requirements herein. When fiber stabilizing additives are used as an ingredient of the mixture, use a separate feed system capable of accurately proportioning the required quantity into the mixture and in such a manner that uniform distribution will be obtained. Interlock the proportioning device with the aggregate feed or weigh system so as to maintain the correct proportions for all rates of production and batch sizes. Accurately control the proportion of fibers to within ± 10% of the amount required. Provide flow indicators or sensing devices for the fiber system that are interlocked with plant controls such that mixture production will be interrupted if introduction of the fiber fails. When a batch type plant is used, add the fiber to the aggregate in the weigh hopper or as approved by the Engineer . Increase the batch dry mixing time by 8 to 12 seconds, or as directed by the Engineer , to assure the fibers are uniformly distributed before the injection of asphalt binder into the mixer. When a continuous mix or dryer -drum t ype plant is used, add the fiber to the aggregate and uniformly disperse at the point of injection of asphalt binder. Add the fiber in such a manner that it will not become entrained in the exhaust system of the drier or plant.
6-36 650-5 Construction Methods
Produce, transport to the site and place the OGFC in accordance with Section 610, except as otherwise provided below. Do not place OGFC between October 31 and April 1 of the next year, unless otherwise approved by the Engineer . The minimum air and road surface temperature for placing Type FC-1 Modified mix will be 60 °F. Before starting production of the mix, stockpile all aggregates for a sufficient period of time to facilitate the drainage of free moisture. Clean the existing surface in an acceptable manner before placement of any asphalt material. Remove all existing raised pavement markers as directed by the Engineer and repair any damaged areas caused by the removal. Use an approved dense graded mixture of similar type material for the repair. Apply tack coat in accordance with Section 605 and the following:
650-6 Quality Management System
Produce the OGFC in accordance with Section 609, with the following exceptions . Sample and test the completed mixture from each mix design per plant per year at the following minimum frequency during mix production: Accumulative Production Increment Number of Samples per Increment 500 tons Record the following data on the standardized control charts and in accordance with the requirements of Section 7.4 of the Asphalt QMS Manual :