171 SECTION 255 EROSION CONTROL BLANKET AND TURF REINFORCEMENT MAT
255.01 Description
This work consists of placing an Erosion Control Blanket (ECB) or Turf Reinforcement Mat (TRM) on a prepared slope or channel.
255.02 Equipment
Reserved.
255.03 Materials
Item Section Erosion Control Blanket and Turf Reinforcement Mat 856
255.04 Construction Requirements
255.05 Method of Measurement
The Engineer will measure, completed and in place, as specified in Section 109.01 “Measurement of Quantities”. The Engineer will not measure overlaps or buried portions of the ECB or TRM. 172 255.06 BASIS OF PAYMENT Pay Item Pay Unit ECB Type 1 Square Yard ECB Type 2 Square Yard ECB Type 3 Square Yard ECB Type 4 Square Yard TRM Type 1 Square Yard TRM Type 2 Square Yard Such payment is full compensation for furnishing all materials, staples, equipment, labor, and incidentals to complete the work as specified. Section 256 173 SECTION 256 RIPRAP
256.01 Description
This work consists of furnishing or salvaging, and placing stones on slopes, channel ways, or other areas.
256.02 Equipment
Reserved.
256.03 Materials