311.04 Method of Measurement
1.Rock and gravel surfacing material will be measured by weight or volume.
2.Volume, in cubic yard (cubic meter) measurements, will be taken by load count or truck volume measurement s at the point where the material is delivered. Unmeasured loads that are to be counted shall be filled to a predetermined volume mark on the truck bed.
3.The weight, in tons (megagrams), shall be determined on approved scales.
311.05 Furnish Rock or Gravel
- 178 - Table 311.01 Gravel and Crushed Rock Surfacing Deductions Total Average Percent Passing the No. 10 (2 mm) Sieve Min. Max. Percent Deduction 0 30 0 31 35 10 36 40 25 41 45 50 46 100 Reject
3.Payment is full compensation for all work described in this Section. - 179 - SECTION 312 -- REMOVAL AND PROCESSING OF CONCRETE PAVEMENT
312.03 Construction Methods
1.The pavement to be broken and removed will be shown in the contract.
2.Joint Material Removal: a. Before removing concrete pavement, the Contractor shall remove the preformed cellular flexible polyurethane and all other joint materials from all joints in all sections of the project.
b.The Contractor shall dispose of all joint materials in accordance with all applicable laws and regulations.
3.All reinforcing steel and wire mesh that is dislodged during the removal operation shall be collected and become the property of the Contractor.
4.The Contractor shall stockpile the broken concrete at the site shown in the contract. It will be shown in the contract if Department property is used for a crushing and stockpiling site. If Department property is used, the Contractor shall clean up and remove from the area all debris, reinforcing steel, and scattered pieces of concrete remaining from the operations; and the work area shall be left in a neat and presentable condition.
Source: Nebraska Standard Specifications for Highway Construction, 2017 Edition. Pages 211–212 of 1,048.