- 181 - DIVISION 400 -- LIGHTING, SIGNS, AND TRAFFIC CONTROL 401 -- LIGHTING, TRAFFIC SIGNAL AND INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICE GENERAL REQUIREMENTS
- 184 -
- 185 - SECTION 401-- LIGHTING, TRAFFI C SIGNAL AND INTELLIGENT TRANSPORTATION SYSTEM (I TS) DEVICE GENERAL REQUIREMENTS
401.01Description
furnishes or installs all or part of the following systems:
each Section includes the word "Install" , then the Department will furnish the item and the Contractor shall install it. If the word "Install" is not in the pay item listed in the Basis of Payment Subsection of each Section, then the Contractor shall furnis h and install the item.
the Nebraska Department of Transportation Construction Office, Room 104, 1500 Nebraska Highway 2, Lincoln, Nebraska.
401.02Material Requirements
Engineer, for review, 8 copies of a list showing all roadway lighting system, sign lighting system, traffic signal system and ITS device items to be used on the project. This list of items shall be known as the "Materials List." A separate material list shall be submitted for each system involved. Material Lists combining items from different systems will be returned without review for resubmittal as separate Material Lists. No shop dr awings or certificates of compliance will be reviewed without first having received the correct Materials List.
Once reviewed, there shall be no substitutions for any of the items on the "Materials List" without a prior written request for a substitution and written approval by the Engineer. The Department shall not be liable for any equipment or materials ordered or purchased by the Contractor before review.
Table 401.01. These submittals will be reviewed for compliance with the contract. Materials to be incorporated into the project will be checked for compliance with the reviewed submittals.
guarantees to the Department. All manufacturers’ warranty and guarantee documentation and all operation and parts manuals shall also be given to the Department.
compliance with the contract. Two copies of the reviewed "List" will be returned to the Contractor. Review does not relieve the Contractor if submittals differ from the contract. If sufficient data is not available to