General Provisions (00100-00999)

313CRUSHED ROCK EMBEDMENT

NE · 2017 Standard SpecificationsBook pages 214214View official source ↗

- 180 - SECTION 313 -- CRUSHED ROCK EMBEDMENT

313.01 Description

1.The work shall consist of spreading, scarifying, blending and compacting and top dressing a layer of crushed rock into the subgrade as shown in the contract.

313.02 Material Requirements

1.Crushed rock for embedment shal l conform to the requirements of Table 1033.07.
2.Crushed rock for embedment shall have a less than a 40% loss at the end of 16 cycles of the freeze thaw test.
3.The Contractor may substitute crushed concrete for the crushed rock. Crushed concrete shall conform to the gradation requirements of Crushed Concrete Foundation Course.

313.03 Construction Methods

1.The Contractor shall deliver a nd spread the rock in a uniform layer to the site specified in the contract or as directed by the Engineer.
2.Water shall be added as necessary to facilitate compaction. 3. After the Crushed Rock Embedment is completed, the Contractor shall place and spread 1 inch of Crushed Rock Surface Course on the roadway. Additional Crushed Rock Surface Course shall be placed and spread during the life of the project as directed by the Engineer.

313.04 Method of Measurement

1.Crushed Rock Embedment will be measured by the Square Yard (Square Meter) of completed and accepted work.
2.Crushed rock used for Crushed Rock Embedment and Crushed Rock Surface Course will be m easured by the Ton (Megagram).
3.Water will be measured by the Mgallon (kL) applied. Excess or wasted water will be estimated by t he Engineer and deducted from the volume applied.

313.05 Basis of Payment

1.Pay Item Pay Unit Crushed Rock Embedment Square Yard (SY) [Square Meter (m 2)] Crushed Rock Surface Course Ton (Tn) [Megagram (Mg)] Water 1,000 Gallons (MGAL) [ k i l o l i t e r ( k L ) ]
2.Crushed rock will be paid for in accordance with Section 310 of the Standard Specifications
3.Payment is full compensation for all work described in this Section. - 181 - DIVISION 400 -- LIGHTING, SIGNS, AND TRAFFIC CONTROL 401 -- LIGHTING, TRAFFIC SIGNAL AND INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICE GENERAL REQUIREMENTS .................................................................................................................. 185

401.01 Description ........................................................................... 185

401.02 Material Requirements ........................................................ 185

401.03 Tests of Lighting Systems .................................................... 187

401.04 Grounding ............................................................................. 188

401.05 General Construction Requirements ................................. 188

401.06 Secondary Electrical Connections .................................... 189

402 -- WIRE AND CABL E IN CONDUI T ................................................... 192

402.01 Description ........................................................................... 192

402.02 Material Requirements ........................................................ 192

402.03 Construction Methods ......................................................... 192

402.04 Method of Measurement ...................................................... 193

402.05 Basis of Payment .................................................................. 194

403 -- DIRECT BURIED WIRE AND CABLE ............................................ 195

403.01 Description ........................................................................... 195

403.02 Material Requirements ........................................................ 195

403.03 Construction Methods ......................................................... 195

403.04 Method of Measurement ...................................................... 196

403.05 Basis of Payment .................................................................. 196

404 -- AERIAL CABLE ............................................................................. 197

404.01 Description ........................................................................... 197

404.02 Material Requirements ........................................................ 197

404.03 Construction Methods ......................................................... 197

404.04 Method of Measurement ...................................................... 197

404.05 Basis of Payment .................................................................. 197

405 -- CONDUIT ........................................................................................ 198

405.01 Description ........................................................................... 198

405.02 Material Requirements ........................................................ 198

405.03 Construction Methods ......................................................... 198

405.04 Method of Measurement ...................................................... 199

405.05 Basis of Payment .................................................................. 202

406 -- PULL BO XES ................................................................................. 201

406.01 Description ........................................................................... 201

406.02 Material Requirements ........................................................ 201

406.03 Construction Methods ......................................................... 201

406.04 Method of Measurement ...................................................... 201

406.05 Basis of Payment .................................................................. 201

407 -- POLE AND TOWE R FOUNDATION S ............................................ 202

407.01 Description ........................................................................... 202

407.02 Material Requirements ........................................................ 202

407.03 Construction Methods ......................................................... 202

407.04 Method of Measurement ...................................................... 203

407.05 Basis of Payment .................................................................. 203

408 -- POLES AND TOWERS .................................................................. 204

408.01 Description ........................................................................... 204

408.02 Material Requirements ........................................................ 205

408.03 Construction Methods ......................................................... 205

408.04 Method of Measurement ...................................................... 206

Source: Nebraska Standard Specifications for Highway Construction, 2017 Edition. Pages 214214 of 1,048.