- 180 - SECTION 313 -- CRUSHED ROCK EMBEDMENT
313.01 Description
1.The work shall consist of spreading, scarifying, blending and compacting and top dressing a layer of crushed rock into the subgrade as shown in the contract.
313.02 Material Requirements
1.Crushed rock for embedment shal l conform to the requirements of Table 1033.07.
2.Crushed rock for embedment shall have a less than a 40% loss at the end of 16 cycles of the freeze thaw test.
3.The Contractor may substitute crushed concrete for the crushed rock. Crushed concrete shall conform to the gradation requirements of Crushed Concrete Foundation Course.
313.03 Construction Methods
1.The Contractor shall deliver a nd spread the rock in a uniform layer to the site specified in the contract or as directed by the Engineer.
2.Water shall be added as necessary to facilitate compaction. 3. After the Crushed Rock Embedment is completed, the Contractor shall place and spread 1 inch of Crushed Rock Surface Course on the roadway. Additional Crushed Rock Surface Course shall be placed and spread during the life of the project as directed by the Engineer.
313.04 Method of Measurement
1.Crushed Rock Embedment will be measured by the Square Yard (Square Meter) of completed and accepted work.
2.Crushed rock used for Crushed Rock Embedment and Crushed Rock Surface Course will be m easured by the Ton (Megagram).
3.Water will be measured by the Mgallon (kL) applied. Excess or wasted water will be estimated by t he Engineer and deducted from the volume applied.
313.05 Basis of Payment
1.Pay Item Pay Unit Crushed Rock Embedment Square Yard (SY) [Square Meter (m 2)] Crushed Rock Surface Course Ton (Tn) [Megagram (Mg)] Water 1,000 Gallons (MGAL) [ k i l o l i t e r ( k L ) ]
2.Crushed rock will be paid for in accordance with Section 310 of the Standard Specifications
3.Payment is full compensation for all work described in this Section. - 181 - DIVISION 400 -- LIGHTING, SIGNS, AND TRAFFIC CONTROL 401 -- LIGHTING, TRAFFIC SIGNAL AND INTELLIGENT TRANSPORTATION SYSTEM (ITS) DEVICE GENERAL REQUIREMENTS .................................................................................................................. 185
401.01 Description ........................................................................... 185
401.02 Material Requirements ........................................................ 185
401.03 Tests of Lighting Systems .................................................... 187
401.04 Grounding ............................................................................. 188
401.05 General Construction Requirements ................................. 188
401.06 Secondary Electrical Connections .................................... 189
402 -- WIRE AND CABL E IN CONDUI T ................................................... 192
402.01 Description ........................................................................... 192
402.02 Material Requirements ........................................................ 192
402.03 Construction Methods ......................................................... 192
402.04 Method of Measurement ...................................................... 193
402.05 Basis of Payment .................................................................. 194
403 -- DIRECT BURIED WIRE AND CABLE ............................................ 195
403.01 Description ........................................................................... 195
403.02 Material Requirements ........................................................ 195
403.03 Construction Methods ......................................................... 195
403.04 Method of Measurement ...................................................... 196
403.05 Basis of Payment .................................................................. 196
404 -- AERIAL CABLE ............................................................................. 197
404.01 Description ........................................................................... 197
404.02 Material Requirements ........................................................ 197
404.03 Construction Methods ......................................................... 197
404.04 Method of Measurement ...................................................... 197
404.05 Basis of Payment .................................................................. 197
405 -- CONDUIT ........................................................................................ 198
405.01 Description ........................................................................... 198
405.02 Material Requirements ........................................................ 198
405.03 Construction Methods ......................................................... 198
405.04 Method of Measurement ...................................................... 199
405.05 Basis of Payment .................................................................. 202
406 -- PULL BO XES ................................................................................. 201
406.01 Description ........................................................................... 201
406.02 Material Requirements ........................................................ 201
406.03 Construction Methods ......................................................... 201
406.04 Method of Measurement ...................................................... 201
406.05 Basis of Payment .................................................................. 201
407 -- POLE AND TOWE R FOUNDATION S ............................................ 202
407.01 Description ........................................................................... 202
407.02 Material Requirements ........................................................ 202
407.03 Construction Methods ......................................................... 202
407.04 Method of Measurement ...................................................... 203
407.05 Basis of Payment .................................................................. 203
408 -- POLES AND TOWERS .................................................................. 204
408.01 Description ........................................................................... 204
408.02 Material Requirements ........................................................ 205
408.03 Construction Methods ......................................................... 205
408.04 Method of Measurement ...................................................... 206
Source: Nebraska Standard Specifications for Highway Construction, 2017 Edition. Pages 214–214 of 1,048.